22.01.2015 Views

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(v) Material shall be in accordance with<br />

specifications and drawings specified or approved<br />

by the <strong>Railway</strong> with latest amendments.<br />

(vi) Material should be in properly packed condition<br />

and the consignee reserves the right to reject the<br />

material even though it was passed by RDSO/<br />

nominated inspecting authority of <strong>Railway</strong>s.<br />

(vii) All materials that are not covered under the<br />

specification, designs and drawings of RDSO/TEC<br />

etc. shall be procured from the reputed<br />

manufacturers or their authorized dealers. Such<br />

materials are to be approved by the purchaser‟s<br />

Engineer. The Contractor may be required to<br />

furnish manufacturer‟s test certificate along with<br />

manufacturer‟s /supplier‟s guarantee certificate<br />

wherever called for by the Engineer. The <strong>Railway</strong><br />

may also inspect the material again at the<br />

Consignee depot.<br />

(viii) All the materials and workmanship used in<br />

this work shall be of extremely good quality and<br />

high class in every respect and is expected to give<br />

trouble free service.<br />

(ix) The personnel deputed for soldering should<br />

have adequate soldering skills and competency<br />

certificate issued by ITIs / reputed institutions.<br />

(x) Installation of TPWS Equipments and their<br />

commissioning to be carriedout under supervision of<br />

authorized representative of Manufacturer (OEM).<br />

The pre-commissioning check list shall be jointly<br />

signed by representative of OEM, <strong>Railway</strong>s &<br />

Contractor.<br />

Pre Bid Queries for TPWS 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!