22.01.2015 Views

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(f) Whenever the contract is rescinded, the<br />

Security Deposit shall be forfeited and the<br />

Performance Guarantee shall be chased. The<br />

balance work shall be got done independently<br />

without risk & cost of the failed contractor. The<br />

failed contractor shall be debarred from participating<br />

in the tender for executing the balance work. If the<br />

failed contractor is a JV or a partnership firm, then<br />

every member / partner of such a firm shall be<br />

debarred from participating in the tender for the<br />

balance work in his / her individual capacity or as a<br />

partner of any other JV / partnership firm.<br />

(g) The engineer shall not make a claim under the<br />

Performance Guarantee except for amounts to<br />

which the President of India is entitled under the<br />

contract (not withstanding and / or without prejudice<br />

to any other provisions in the contract agreement)<br />

in the event of:<br />

i. Failure by the contractor to extend the validity<br />

of the Performance Guarantee as described herein<br />

above, in which event the Engineer may claim the<br />

full amount of the Performance Guarantee.<br />

ii. Failure by the contractor to pay President of<br />

India any amount due,either as agreed by the<br />

contractor or determined under any of theClauses /<br />

Conditions of the Agreement, within 30 days of<br />

theservice of notice to this effect by Engineer.<br />

The Contract being determined or rescinded under<br />

provision ofthe GCC, the Performance Guarantee<br />

shall be forfeited in fulland shall be absolutely at the<br />

disposal of the President of India.<br />

70 Chapter-4<br />

SCC 4.17<br />

Alstom<br />

GPLEA OF CUSTOM<br />

The plea of custom prevailing will not on any<br />

account be permitted as an excuse for an<br />

infringement of any of the conditions of the contract<br />

and/ or special conditions of contract.<br />

We understand that Work shall be executed <strong>Tender</strong> Condition remain unchanged.<br />

as per industry practice and conditions of The work has to executed as per<br />

contract and/or special conditions of contract tender conditions, specification and<br />

shall be read accordingly. Kindly clarify. guidelines of RDSO.<br />

Pre Bid Queries for TPWS 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!