Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

33 3.1 General<br />

condition of<br />

contract (Page<br />

No. 38)<br />

Hytronics<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

GIt is stated that General Conditions of Contract<br />

(GCC) Works Hand Book Parts I & II August 98<br />

edition / latest edition (with latest amendments), may<br />

be purchased by <strong>Tender</strong>er(s) from Engineering<br />

Depts. Of <strong>Western</strong> <strong>Railway</strong> at their own cost.<br />

Can you provide us a copy Please specify<br />

the method to purchase it.<br />

The General Conditions of Contract<br />

(GCC) along with corrction slips can<br />

be seen on the website<br />

www.indianrailways.gov.in<br />

34 4.61 Insurance<br />

of Materials &<br />

Installations<br />

(Page No. 81)<br />

Hytronics<br />

GThe contractor shall take out and keep in force a<br />

policy or policies of insurance for all materials<br />

including <strong>Railway</strong> supply materials equipment until<br />

such works are provisionally handed over to the<br />

<strong>Railway</strong>s. For this purpose the works are deemed to<br />

have been provisionally handed over when<br />

Provisional acceptance certificate is issued for the<br />

Sub-section as per Para 4.39 of SCC..................<br />

Please clarify when does property transfer There no issue of property transfer.<br />

happens, from Contractor to Customer Des The contractor will be responsible<br />

property transfer happens at PAC for proper up-keep of equipments<br />

supplied and installed till warranty<br />

period is over.<br />

35 Schedule of<br />

Supply and<br />

Installation Part<br />

A), Point A3<br />

(Page No. 99)<br />

Hytronics<br />

36 Schedule 'A' - Hytronics<br />

Clause B1.1<br />

(Page No. 115)<br />

37 Chapter 4<br />

SCC, Cl 4.3.1,<br />

page no. 39<br />

Invensys<br />

TWhat is meant exactly for "diagnostic software,<br />

-maintenance / diagnostic tool" Is diagnostic<br />

Rsoftware and hardware included in scope of supply<br />

DOr only software Where is the diagnostic data<br />

Sforeseen to be used: on site or at remote location<br />

O We could not find any diagnostic software or<br />

Thardware items included in the Rate Schedules / Bill<br />

-of Quantities at Section III of <strong>Tender</strong> <strong>Document</strong>s.<br />

W<br />

S<br />

T<br />

We understand that each Line side cabinet<br />

-<br />

is designed to accommodate one LEU<br />

R<br />

module.<br />

Is it<br />

D<br />

possible to install more than one LEU<br />

S<br />

module inside a Line side electronic unit<br />

O<br />

cabinet or Line side electronic unit rack<br />

T<br />

If it is possible, how will WR manage the<br />

-<br />

payment of this solution<br />

W<br />

TAt present, the section contains approximately 835 Please clarify the extent of minor changes,<br />

-Signals including Automatic & Station signals in UP in terms of no. of signals / level crossings<br />

Wand Down direction for passenger running lines. etc.<br />

SThere are 49 Nos of Station (including Virar &<br />

Vadodara), 117 Interlocked gates in the section<br />

and there can be minor changes with time<br />

This Para is self explanatory and<br />

should be read in totality. It includes<br />

software and hardware both. The<br />

diagnostic data is required to be<br />

seen at site and remote location.<br />

Please quote as per Schedule.<br />

However, based on RDSO guidelines,<br />

if any, the schedule is likely to be<br />

amended . Future corrigendum may<br />

be seen in this regard.<br />

Minor changes may likely to happen<br />

in terms of no. of signals / level<br />

crossings. However, if there are<br />

changes in supply & execution items,<br />

it will be governed by Para 4.46 of<br />

SCC.<br />

Pre Bid Queries for TPWS 11