Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

90 Chapter 5 5.1<br />

14.0(j)<br />

Alstom<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

TTechnical Specification of Train Protection &<br />

-Warning System<br />

W<br />

S<br />

E<br />

Considering WR choice 14.0(i) for DMI For CENELEC- DMI, the 8 position<br />

CENELEC, the "8 position switch" is not switch is not required, necessary<br />

anymore requested by the RDSO<br />

amendment in this regard will be<br />

specification v2 as it is only applicable for issued.<br />

the simplified DMI as per the clause 6.18.1.1<br />

(vi).<br />

Please<br />

confirm the "8 position switch" request is<br />

removed<br />

91 Chapter 5 5.1<br />

14.0(k) b<br />

Alstom<br />

TTechnical Specification of Train Protection &<br />

-Warning System<br />

W<br />

E<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

Could you please detail for each<br />

Locomotives of the same family WAP-4 and<br />

EMU characteristic are the same (i.e. Is<br />

there 3 different types in Locomotive WAP4<br />

itself),<br />

If any differences in the<br />

same Locomotive WAP4 and EMU then<br />

please specify precisely types and numbers<br />

of locos and EMUs (i.e. with SIV, with<br />

ARNO converter, Crew friendly or not…)<br />

and related brake system.<br />

The WAP4 Locomotives are<br />

generally of two types: (i) with SIV<br />

and (ii) with ARNO converter. Please<br />

see annexure-4 (page139) of tender<br />

document. In order to get more<br />

acquaintance, tenderer may do site<br />

visit at Electric Locomotive shed/<br />

Vadodrara and MEMU<br />

shed/Vadodrara with prior<br />

permission.<br />

92 4.3.2 (VI)<br />

(Page-41)<br />

Bombardier<br />

TThere shall be sufficient space inside LEU cabinet<br />

-for installation of relays (ECRs), if required for<br />

Winterface of signalling system with LEU.<br />

S<br />

Please confirm additional ECR's if required<br />

will be supplied by <strong>Railway</strong>s or these are<br />

covered under Schedule item D12.1 &<br />

D12.2.<br />

Item covered under Schedule item<br />

D12.1 & D12.2.<br />

93 4.3.2 (VII)<br />

(Page-41)<br />

Bombardier<br />

TIn case of distributed assets, Contactor............for<br />

-LEUs may be taken from 110 V or 230 V AC power<br />

Wsupply arrangement.<br />

S<br />

What is meant by distributed assest Please<br />

inform the number of distributed assests and<br />

also confirm that in case distributed assests<br />

have 230V AC, then <strong>Railway</strong>s will provide<br />

230/110V AC step down transformer or this<br />

item is already covered under schedule item<br />

D13.<br />

Also, we understand that power cable will be<br />

provided by <strong>Railway</strong>s. Please confirm.<br />

This Para is self explanatory. The<br />

distributed asset is any thing which<br />

is outside relay room/ realy hut/ autohut.<br />

<strong>Railway</strong> will provide 230volt or<br />

110 volt AC. The step down<br />

transformers are covered in under<br />

Schedule.<br />

94 4.3.3 (iv)<br />

(Page-42)<br />

Bombardier<br />

TProvision of one potential free contact for each<br />

-signal aspect including calling on "A"/"G" marker in<br />

WRelay Room/Relay Hut.<br />

S<br />

If LEU is not in same location as ECR then it<br />

is required to lay cable from ECR to the LEU<br />

location, the cable shall be laid by contractor<br />

and the cable will be supplied by <strong>Railway</strong>s.<br />

Please let us know whether our<br />

understanding is correct.<br />

Data cable will be supplied by the<br />

<strong>Tender</strong>er as per quantity give in the<br />

schedule. Signalling and Power<br />

Cable if required will be supplied by<br />

<strong>Railway</strong>s.<br />

Pre Bid Queries for TPWS 45