Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No. Cl. No. Firm T<br />
y<br />
p<br />
90 Chapter 5 5.1<br />
14.0(j)<br />
Alstom<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
TTechnical Specification of Train Protection &<br />
-Warning System<br />
W<br />
S<br />
E<br />
Considering WR choice 14.0(i) for DMI For CENELEC- DMI, the 8 position<br />
CENELEC, the "8 position switch" is not switch is not required, necessary<br />
anymore requested by the RDSO<br />
amendment in this regard will be<br />
specification v2 as it is only applicable for issued.<br />
the simplified DMI as per the clause 6.18.1.1<br />
(vi).<br />
Please<br />
confirm the "8 position switch" request is<br />
removed<br />
91 Chapter 5 5.1<br />
14.0(k) b<br />
Alstom<br />
TTechnical Specification of Train Protection &<br />
-Warning System<br />
W<br />
E<br />
T<br />
-<br />
R<br />
D<br />
S<br />
O<br />
Could you please detail for each<br />
Locomotives of the same family WAP-4 and<br />
EMU characteristic are the same (i.e. Is<br />
there 3 different types in Locomotive WAP4<br />
itself),<br />
If any differences in the<br />
same Locomotive WAP4 and EMU then<br />
please specify precisely types and numbers<br />
of locos and EMUs (i.e. with SIV, with<br />
ARNO converter, Crew friendly or not…)<br />
and related brake system.<br />
The WAP4 Locomotives are<br />
generally of two types: (i) with SIV<br />
and (ii) with ARNO converter. Please<br />
see annexure-4 (page139) of tender<br />
document. In order to get more<br />
acquaintance, tenderer may do site<br />
visit at Electric Locomotive shed/<br />
Vadodrara and MEMU<br />
shed/Vadodrara with prior<br />
permission.<br />
92 4.3.2 (VI)<br />
(Page-41)<br />
Bombardier<br />
TThere shall be sufficient space inside LEU cabinet<br />
-for installation of relays (ECRs), if required for<br />
Winterface of signalling system with LEU.<br />
S<br />
Please confirm additional ECR's if required<br />
will be supplied by <strong>Railway</strong>s or these are<br />
covered under Schedule item D12.1 &<br />
D12.2.<br />
Item covered under Schedule item<br />
D12.1 & D12.2.<br />
93 4.3.2 (VII)<br />
(Page-41)<br />
Bombardier<br />
TIn case of distributed assets, Contactor............for<br />
-LEUs may be taken from 110 V or 230 V AC power<br />
Wsupply arrangement.<br />
S<br />
What is meant by distributed assest Please<br />
inform the number of distributed assests and<br />
also confirm that in case distributed assests<br />
have 230V AC, then <strong>Railway</strong>s will provide<br />
230/110V AC step down transformer or this<br />
item is already covered under schedule item<br />
D13.<br />
Also, we understand that power cable will be<br />
provided by <strong>Railway</strong>s. Please confirm.<br />
This Para is self explanatory. The<br />
distributed asset is any thing which<br />
is outside relay room/ realy hut/ autohut.<br />
<strong>Railway</strong> will provide 230volt or<br />
110 volt AC. The step down<br />
transformers are covered in under<br />
Schedule.<br />
94 4.3.3 (iv)<br />
(Page-42)<br />
Bombardier<br />
TProvision of one potential free contact for each<br />
-signal aspect including calling on "A"/"G" marker in<br />
WRelay Room/Relay Hut.<br />
S<br />
If LEU is not in same location as ECR then it<br />
is required to lay cable from ECR to the LEU<br />
location, the cable shall be laid by contractor<br />
and the cable will be supplied by <strong>Railway</strong>s.<br />
Please let us know whether our<br />
understanding is correct.<br />
Data cable will be supplied by the<br />
<strong>Tender</strong>er as per quantity give in the<br />
schedule. Signalling and Power<br />
Cable if required will be supplied by<br />
<strong>Railway</strong>s.<br />
Pre Bid Queries for TPWS 45