22.01.2015 Views

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

iv. During period of Warranty, the Contractor shall<br />

remain responsible to arrange replacement and for<br />

setting right at his own cost any equipment supplied<br />

by him which is of defective manufacture or<br />

defective design or defective material / component<br />

become unworkable due to any cause whatsoever.<br />

The decision to attend to any damage or defect in<br />

work shall be final and binding on the contractor.<br />

v. If it becomes necessary for the contractor to<br />

replace or renew any defective portions of the<br />

system under this clause, the provision of the above<br />

clauses shall apply to the replaced/renewed<br />

equipment for the period of six month from the date<br />

of such replacement or renewal or until date of<br />

warranty period whichever may be later. If any<br />

defect is not remedied within reasonable time, the<br />

railway may proceed to do the work at<br />

contractor‟s risk and expenses, but without<br />

prejudice to any other rights, which the railway may<br />

have against the contractor in respect of such<br />

defects.<br />

vi.If the replacement or renewals are of such a<br />

character as may affect the efficiency of the<br />

system, the <strong>Railway</strong> shall have the right to give the<br />

contractor within one month from such replacement<br />

or renewal notice in writing that test on completion<br />

will be carried out at his cost. Should such tests<br />

show that the plant sustains the guarantee in the<br />

contract; the cost of the tests shall be borne by the<br />

purchaser. Should the guarantees not be<br />

sustained, the cost of the tests shall be borne by<br />

the contractor.<br />

Pre Bid Queries for TPWS 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!