Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No. Cl. No. Firm T<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
y<br />
p<br />
iv. During period of Warranty, the Contractor shall<br />
remain responsible to arrange replacement and for<br />
setting right at his own cost any equipment supplied<br />
by him which is of defective manufacture or<br />
defective design or defective material / component<br />
become unworkable due to any cause whatsoever.<br />
The decision to attend to any damage or defect in<br />
work shall be final and binding on the contractor.<br />
v. If it becomes necessary for the contractor to<br />
replace or renew any defective portions of the<br />
system under this clause, the provision of the above<br />
clauses shall apply to the replaced/renewed<br />
equipment for the period of six month from the date<br />
of such replacement or renewal or until date of<br />
warranty period whichever may be later. If any<br />
defect is not remedied within reasonable time, the<br />
railway may proceed to do the work at<br />
contractor‟s risk and expenses, but without<br />
prejudice to any other rights, which the railway may<br />
have against the contractor in respect of such<br />
defects.<br />
vi.If the replacement or renewals are of such a<br />
character as may affect the efficiency of the<br />
system, the <strong>Railway</strong> shall have the right to give the<br />
contractor within one month from such replacement<br />
or renewal notice in writing that test on completion<br />
will be carried out at his cost. Should such tests<br />
show that the plant sustains the guarantee in the<br />
contract; the cost of the tests shall be borne by the<br />
purchaser. Should the guarantees not be<br />
sustained, the cost of the tests shall be borne by<br />
the contractor.<br />
Pre Bid Queries for TPWS 33