Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

85<br />

Cl. No.<br />

Chapter 6<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TSchedule of works and supplies:<br />

A.4.16 and B.5<br />

-Supply of hand held maintenance tools for testing<br />

Rthe line side equipments in entire section<br />

D<br />

S<br />

O<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Could you please confirm this equipment The remark is same as above, being<br />

shall be able for the LEU equipment to : a repition<br />

1) Program the data 2)<br />

Read the data at the balise outputs<br />

(performing as a balise emulation) 3)<br />

Up-load the log file for diagnose and<br />

mainenance<br />

Thus<br />

the testing equipment to deliver is not only<br />

the operating hand held terminal, but also<br />

the associated electronic case allowing to<br />

perform the above functions at the related<br />

interfaces.<br />

86 Chapter 5 5.1<br />

clause<br />

14.0(m)<br />

Alstom<br />

Tschedule of works and supplies:<br />

-<br />

R<br />

D<br />

S<br />

O<br />

Would you please confirm the JRU to be<br />

provided shall be mandatory quoted in<br />

seperated lines the chapter 6 "schedule of<br />

works and supplies" i.e on A.1.9 (for onboard<br />

part) and A.4.18 (Testing facility) and<br />

A.5.10 (Essential spares)<br />

As per RDSO guideline 10%<br />

Locomotives/ MEMU are to be<br />

covered. The schedule is being<br />

modified to incorporate these<br />

guidelines.<br />

87 Chapter 5 5.1<br />

clause<br />

14.0(m)<br />

Alstom<br />

TRequirement of Juridical Recording Unit (JRU) in<br />

-terms of Clause 4.1 (ii) (b)<br />

R<br />

D<br />

S<br />

O<br />

Would you please confirm the JRU shall be The JRU to supplied against this<br />

provided with hazard protected juridical tender should conform to RDSO and<br />

memory unit so called anti-crash protected CENELEC / UNISIG specification with<br />

memory module <br />

anti-crash protected memory<br />

And the associated tool (testing equipments module. The associated tool (testing<br />

along with diagnostic software for<br />

equipments along with diagnostic<br />

maintenance of Train Borne TPWS software for maintenance of Train<br />

equipment) shall be able to read this external Borne TPWS equipment) shall be<br />

module<br />

able to read this external module<br />

88 Chapter 4<br />

4.3.2 (X) and<br />

Chapter 6<br />

A4.17<br />

Alstom<br />

TCONTRACTOR‘S SCOPE OF WORK "This<br />

-activity also involves renovation of space provided<br />

Wby <strong>Railway</strong>s, for installation of test /simulation set-<br />

Chapter 6 A4.17 "Renovation and simulation<br />

Sup."<br />

Eset up as per engineer in Charge"<br />

Would you please provide details on the <strong>Railway</strong> will provide space with 230 V<br />

three spaces at Electric Loco /MEMU Shed / ,AC power supply.<br />

simulation /Training centre (Vadodara)and<br />

training school / repair center at Valsad) :<br />

- Location, surface, state of the space (wall<br />

existing power supply available, lighting,<br />

furniture...<br />

- the<br />

expected work of the renovation<br />

89 Chapter 4<br />

SCC 4.6<br />

Alstom GCompletion Period We request to kindly modify the completion<br />

period as 24 months.<br />

The completion period for this is 18<br />

months. However, any change in this<br />

regard will be notified, subsequently.<br />

Pre Bid Queries for TPWS 44