Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(c) <strong>Railway</strong>‟s Engineer shall issue a Provisional<br />

Acceptance certificate for successful installation &<br />

testing of whole system covering all materials and<br />

services included in the Schedule of works &<br />

supplies, after the acceptance test as per the<br />

approved test procedure have been completed and<br />

the performance has been found to meet the<br />

specifications and observance period of one month<br />

is over. <strong>Railway</strong>‟s decision in this respect shall be<br />

final. The Provisional acceptance certificate shall<br />

be signed by both the parties. The equipment<br />

pertaining to this work installed in the section /<br />

station will be under supervision of contractor till<br />

issue of final acceptance certificate as per Para<br />

4.41 below and contractor will provide adequate<br />

know how to <strong>Railway</strong> technician / supervisor for<br />

proper upkeep at maintenance of the system.<br />

(d) Should the results/s of inspection and test be not<br />

satisfactory, an extension of one month will be<br />

granted to the contractor to make good the defects<br />

and deficiencies pointed out by the purchaser.<br />

Fresh inspection and test will then be carried out<br />

after the contractor has attended to the defects and<br />

deficiencies. If these tests are also not<br />

satisfactory, the <strong>Railway</strong>s may proceed at the<br />

contractor‟s expense by the means deemed<br />

expedient, to have the installation made<br />

satisfactory until they comply with the<br />

specifications, and approved drawings and designs.<br />

Pre Bid Queries for TPWS 30