Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No. Cl. No. Firm T<br />
y<br />
p<br />
74 Chapter-4 Alstom T(a) Installation: The on board equipment will be We understand that <strong>Railway</strong>‟s Engineer<br />
SCC 4.39<br />
-supplied in three batches as indicated in Para 4.6 of shall issue Provisional Acceptance<br />
Wthe SCC. The installation of the on board equipment certificate for each Phase. Kindly confirm.<br />
Sincluding software loading and required data input<br />
E etc. will be done by the contractor, in the <strong>Railway</strong><br />
Gpremises. Normally this activity will be carried out in<br />
the Loco / MEMU sheds at Vadodara where,<br />
Locomotive / MEMU report back for their normal<br />
maintenance. The installation of the on board<br />
equipment will have to be done during the lie over<br />
period of Loco / MEMU in the car shed along with<br />
the other schedule maintenance activities. If the<br />
time required for installation of on board equipment<br />
and interface to braking system etc., exceeds the lie<br />
over period, the work has to be carried out in one or<br />
more phases. The tenderer should indicate the time<br />
required by him for installation of the on board<br />
equipment in the technical bid. After each phase<br />
the locomotive/MEMU should be in a position to<br />
carry out the normal scheduled performance.<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
Para 4.39 is self-explanatary.<br />
<strong>Railway</strong>’s Engineer will issue<br />
Provisional Acceptance certificate as<br />
per tender condition.<br />
(b) Testing and Commissioning: - The on board<br />
equipment installed in the LOCO/MEMU will be<br />
tested in the car shed jointly by the <strong>Railway</strong> and the<br />
contractor as per the Technical Specifications and<br />
the Acceptance Test Schedule furnished by the<br />
contractor and approved by the <strong>Railway</strong>. The test<br />
schedule furnished by the tenderer will be modified<br />
by mutual discussions between the contractor and<br />
the <strong>Railway</strong> before finalization. Any component,<br />
modules, sub-assemblies or equipment failing<br />
during the commissioning test shall be replaced /<br />
repaired free of cost by the tenderer.<br />
All tests and measuring instruments and other<br />
arrangements required for these tests shall be<br />
provided by the contractor at his cost.<br />
Pre Bid Queries for TPWS 28