Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No.<br />
81<br />
Cl. No.<br />
Chapter-4<br />
Firm<br />
Alstom<br />
T<br />
y<br />
p<br />
SSYSTEM OF QUOATING RATES<br />
SCC 4.53<br />
-The prices quoted by the <strong>Tender</strong>er shall include the<br />
F prices of materials including all incidental charges<br />
Gfor transport, loading/unloading and handling of<br />
materials, cost for arranging dispatch by rail/road<br />
direct from manufacturer‟s premises and<br />
completing all necessary formalities in all respect.<br />
The breakup of the basic cost and other taxes<br />
and duties shall be positively submitted.<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
The prices shall include all taxes, duties, Royalty<br />
land levies (including Octroi etc.) applicable to this<br />
Works Contract. Therefore, they should quote<br />
their prices taking into account the rate of sales tax<br />
as leviable in the event of sale to the Central<br />
Government Organization etc. It is clarified that<br />
required form applicable for this purpose will be<br />
supplied to the contractor, as applicable in the state<br />
where the contract is being executed. The prices<br />
shall also include provision for losses and wastage<br />
in transit and installation and commissioning. The<br />
prices quoted by the tenderer shall include cost of<br />
commissioning and testing and all costs of<br />
Administration of Contract, Insurance, Premium<br />
banker‟s charges for guarantees, cost of storage,<br />
loading-unloading and handling of materials and for<br />
any road transport which the contractor may use or<br />
carriage of materials to his depot and the site of<br />
work. The prices shall include the cost of works<br />
and adjustments necessary to be done by the<br />
contractor during or after test carried out by the<br />
purchaser.<br />
We understand that change in law, statute,<br />
tax rate etc. coming into effect after the date<br />
for submission of tender. Our understanding<br />
is that any increase/decrease in cost on<br />
account of any change in law statute, tax<br />
rate etc. or introduction of any new law,<br />
statute, tax etc. after the submission of<br />
tender shall be passed on to the Purchaser.<br />
Contractor shall provide documentary<br />
evidence of the increase or decrease to<br />
Purchaser.<br />
This Para is self explanatory and<br />
should be read in totality & <strong>Tender</strong><br />
Condition remain unchanged. Please<br />
also refer Para 4.59 of SCC.<br />
The price to be quoted by the tenderer should take into account the credit availed on inputs under the MODVAT. The tenderer should give a declaration that any let o<br />
While the price quoted in the contract are inclusive of all taxes i.e. custom duty, excise duty, octroi, local levies, Sales tax levied by any statutory authority, the purcha<br />
All taxes, duties and levies (Including octroi etc.) arising out of the transaction between the contractor and his sub contractor/supplier for this work will be included in th<br />
Arrangement of permits/license for materials will not be made by the <strong>Railway</strong> or any assistance given. The Contractor will have to make his own arrangement. Also no<br />
Pre Bid Queries for TPWS 36