Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(ii) The tenderer shall undertake to supply on<br />

payment all maintenance spares and tools required<br />

for the equipment during life cycle period. He shall<br />

also undertake to supply additional equipment<br />

required for replacement or expansion of the<br />

network that may become necessary due to<br />

additional traffic requirements at mutually agreed<br />

price.<br />

(iii) The successful tenderer shall further<br />

guarantee that if OEM goes out of production, he<br />

shall supply the specifications of materials at no cost<br />

to the purchaser, if and when required in<br />

connection with the equipment to enable the<br />

purchaser to fabricate or procure from other<br />

sources.<br />

(iv) The supplier (OEM) shall recommend and<br />

provide, prior to the system acceptance, calibration<br />

procedures. The recommendation shall include a<br />

list of the various calibration instruments,<br />

recalibration periods and extent of preventive<br />

maintenance for each test instrument.<br />

68 Chapter-4<br />

SCC 4.13<br />

Alstom<br />

SCONTRACTOLR‘S OFFICE & STORES DEPOT<br />

-The Contractor shall, within a month of issue of<br />

F letter of acceptance of tender, establish an office<br />

Gand store depot at a convenient place for receiving<br />

& storing equipments and materials and<br />

progressing field work expeditiously in consultation<br />

and with the approval of the Engineer-in-charge,<br />

where all correspondence should be sent.<br />

Contractor will intimate office address along with<br />

Telephone/Fax, E-mail and name of Key-personnel<br />

responsible for execution of work. Any<br />

communication sent to the contractor by post at his<br />

said address shall be deemed to have reached the<br />

contractor duly and in time. Important document<br />

shall be sent by Registered post.<br />

Our understanding is that land for office and<br />

stores depot will be made available to<br />

Contractor by Purchaser at convenient<br />

places. Kindly confirm.<br />

This Para is self explanatory and<br />

should be read in totality. Land for<br />

specific use of store may be made<br />

available depending upon availabilty<br />

as per GCC and extant provisions of<br />

WR. However, it can not be<br />

guaranteed.<br />