Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No.<br />
64<br />
Cl. No.<br />
Chapter-4<br />
Firm<br />
Alstom<br />
T<br />
y<br />
p<br />
GGENERAL<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
SCC 4.1<br />
(i) These regulations of tenders and contracts shall The clause specifies the priority between<br />
be read in conjunction with General Conditions of GCC and other documents. The order of<br />
Contract (GCC) with latest amendments, which shall priority within the other documents is not<br />
be subject to modifications, additions or<br />
specified. In our understanding in case of<br />
supersession by these Special Conditions of conflict between Contract<br />
Contract (SCC) and/or specifications/conditions, if documents the decreasing order of priority<br />
any, which is part of this <strong>Tender</strong> <strong>Document</strong>. shall be:<br />
This Para is self explanatory and<br />
should be read in totality.<br />
(ii) Where there is any conflict between these<br />
Special Conditions of Contract on one hand and<br />
Standard Specifications and General Conditions of<br />
Contract of <strong>Western</strong> <strong>Railway</strong> on the other hand, the<br />
former (SCC) shall prevail.<br />
(iii) Any deviations from these Special<br />
Conditions of Contract, Technical Requirement &<br />
Specifications, Schedule of Material & Supplies<br />
and/or any condition of tender document, if any,<br />
stated by the tenderer in his tender or subsequently<br />
introduced by the <strong>Railway</strong> shall be a part of the<br />
Contract only to such extent as have been<br />
explicitly accepted by the <strong>Railway</strong> and<br />
incorporated in the contract.<br />
1. Signed Agreement.<br />
2. Letter of Acceptance (with enclosures<br />
including accepted rates and agreed<br />
deviations) 3.<br />
Special Conditions of Contract 4.<br />
<strong>Tender</strong> <strong>Document</strong> (Chapter I and II ) 5.<br />
Technical Proposal 6.<br />
other documents submitted by Contractor as<br />
per ITT.<br />
7. GCC<br />
8. IRS conditions of Contract Kindly confirm<br />
our above understanding.<br />
Pre Bid Queries for TPWS 16