Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

8<br />

Cl. No.<br />

chapter 4 -<br />

Firm<br />

Thales<br />

T<br />

y<br />

p<br />

SAfter the equipment has been installed, tested &<br />

Para 4.40.1<br />

-placed in service and Provisional Acceptance<br />

FCertificate issued by <strong>Railway</strong>'s Engineer, the<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

contractor shall be responsible for proper<br />

maintenance supervision of the equipment for a<br />

period of 12 months (Minimum) from the issue of<br />

PAC. For this purpose he shall prepare a<br />

maintenance plan and make available the services<br />

of qualified maintenance engineer stationed the<br />

location approved by <strong>Railway</strong>'s Engineer who will<br />

guide and supervise the work of <strong>Railway</strong>'s<br />

maintenance staff. The maintenance engineer of the<br />

contractor will visit Master station and all the base<br />

stations at least twice in a month for regular upkeep<br />

and attend to any fault on the systems promptly.<br />

Kindly confirm if the 5 years period after<br />

FAT is a warranty period or a maintenance<br />

contract period whose price is deemed to<br />

included in the tender, given that Para 4.45<br />

says that no AMC is applicable.<br />

This Clause is self explanatory.<br />

Please refer Para 4.44 and 4.44.1<br />

also.<br />

9 chapter 4 -<br />

Para 4.44.1<br />

Thales<br />

GThe normal day-to-day operations and diagnosis to<br />

the extent possible will be done by the <strong>Railway</strong>,<br />

based on the guidelines provided by the supplier.<br />

Kindly confirm if "supplier" needs to be read<br />

as "contractor" and clarify what is the<br />

meaning of sentences in bold.<br />

Supplier means Original Equipment<br />

Manufacturer "OEM" of TPWS.<br />

Sentences in Bold are self<br />

explanatory requiring more attention.<br />

10 Chapter 4-Para<br />

4.46<br />

Thales<br />

G(vi) As for as SOR items are concerned, the limit of<br />

25% would apply to the value of SOR schedule as a<br />

whole and not on individual SOR items. However, in<br />

case of NS items, the limit of 25% would apply on<br />

the individual items irrespective of the manner of<br />

quoting the rate (single percentage rte or individual<br />

item rate).<br />

Kindly confirm if "SOR" actually refers to<br />

Chapter 6 Schedule of Material & Works. If<br />

not what is the meaning and content of this<br />

acronym<br />

The Schedule of Material & Works<br />

given is cahpter-6 consists of Non-<br />

SOR Items. "SOR" stands for<br />

"Schedule of Rates" issued by S&T<br />

Department of <strong>Western</strong> <strong>Railway</strong>.<br />

Pre Bid Queries for TPWS 3