Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No.<br />
8<br />
Cl. No.<br />
chapter 4 -<br />
Firm<br />
Thales<br />
T<br />
y<br />
p<br />
SAfter the equipment has been installed, tested &<br />
Para 4.40.1<br />
-placed in service and Provisional Acceptance<br />
FCertificate issued by <strong>Railway</strong>'s Engineer, the<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
contractor shall be responsible for proper<br />
maintenance supervision of the equipment for a<br />
period of 12 months (Minimum) from the issue of<br />
PAC. For this purpose he shall prepare a<br />
maintenance plan and make available the services<br />
of qualified maintenance engineer stationed the<br />
location approved by <strong>Railway</strong>'s Engineer who will<br />
guide and supervise the work of <strong>Railway</strong>'s<br />
maintenance staff. The maintenance engineer of the<br />
contractor will visit Master station and all the base<br />
stations at least twice in a month for regular upkeep<br />
and attend to any fault on the systems promptly.<br />
Kindly confirm if the 5 years period after<br />
FAT is a warranty period or a maintenance<br />
contract period whose price is deemed to<br />
included in the tender, given that Para 4.45<br />
says that no AMC is applicable.<br />
This Clause is self explanatory.<br />
Please refer Para 4.44 and 4.44.1<br />
also.<br />
9 chapter 4 -<br />
Para 4.44.1<br />
Thales<br />
GThe normal day-to-day operations and diagnosis to<br />
the extent possible will be done by the <strong>Railway</strong>,<br />
based on the guidelines provided by the supplier.<br />
Kindly confirm if "supplier" needs to be read<br />
as "contractor" and clarify what is the<br />
meaning of sentences in bold.<br />
Supplier means Original Equipment<br />
Manufacturer "OEM" of TPWS.<br />
Sentences in Bold are self<br />
explanatory requiring more attention.<br />
10 Chapter 4-Para<br />
4.46<br />
Thales<br />
G(vi) As for as SOR items are concerned, the limit of<br />
25% would apply to the value of SOR schedule as a<br />
whole and not on individual SOR items. However, in<br />
case of NS items, the limit of 25% would apply on<br />
the individual items irrespective of the manner of<br />
quoting the rate (single percentage rte or individual<br />
item rate).<br />
Kindly confirm if "SOR" actually refers to<br />
Chapter 6 Schedule of Material & Works. If<br />
not what is the meaning and content of this<br />
acronym<br />
The Schedule of Material & Works<br />
given is cahpter-6 consists of Non-<br />
SOR Items. "SOR" stands for<br />
"Schedule of Rates" issued by S&T<br />
Department of <strong>Western</strong> <strong>Railway</strong>.<br />
Pre Bid Queries for TPWS 3