SUSTAINABLE CITY PROGRAMME: PUBLIC REALM IMPROVEMENTS<br />
What?<br />
Public realm improvements at the following locations:<br />
Purley<br />
New Addington- Phase1 and 2<br />
<br />
Addiscombe<br />
Legible London- Phase 1<br />
<br />
<br />
Wandle Park<br />
‘Parks to be Proud of’ project<br />
Connect 2<br />
<br />
East Croydon Bridge<br />
Wellesley Road- Phase 1<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Wellesley Road- Phase 2 (Lansdowne Road)<br />
College Green Paving<br />
West Croydon Public Realm<br />
East Croydon Public Realm<br />
High Streets – South End<br />
High Streets (London Road, Old Town, Central)<br />
George Street tram stop<br />
South Norwood Public Realm<br />
Billinton Hill – Eastern Link<br />
Wandle Road Bus Stand<br />
Future Tier 2 to include Wandle Park pavilion, COA subway removal, cycle<br />
projects, district centres and future Legible London future phases.<br />
Where?<br />
Borough-wide<br />
When?<br />
2015<br />
Why?<br />
In order to achieve Croydon’s vision to be London’s most, enterprising borough it is<br />
essential that Croydon’s public realm reflects this aspiration and is welcoming,<br />
simple, clean, accessible, sustainable, well managed and maintained. To encourage<br />
a new residential community and business to the Croydon Opportunity Area and<br />
District Centres, the public realm needs to be improved.<br />
Stakeholder Engagement Since March 2012:<br />
Formal public consultation has been undertaken for a number of individual<br />
Connected Croydon projects in design, including South End, West Croydon, East<br />
Croydon and Lansdowne Road. Continual stakeholder engagement takes place<br />
through project design and <strong>delivery</strong>. Connected Croydon Summit 2013, as well as<br />
the establishment of Connected Croydon microsite. Engagement has taken place<br />
with Develop Croydon, Live Croydon etc.<br />
Progress Since March 2012:<br />
A number of projects have been completed:<br />
Purley<br />
New Addington Phase 1<br />
Addiscombe<br />
Legible London Phase 1<br />
Wandle Park<br />
A number of projects are on site and the project design and consultation is<br />
underway on a number of projects.<br />
Risks:<br />
Construction logistics and disruption<br />
Large of number of projects to be delivered by March 2015<br />
Risk to quality given timeframes and budgets<br />
Mitigation:<br />
<br />
<br />
Construction logistics party set up by Tony Antoniou, Director of Regeneration<br />
Improve resource efficiency and resources are directed to quality and design.<br />
44