infrastructure-delivery-dec13
infrastructure-delivery-dec13
infrastructure-delivery-dec13
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SUSTAINABLE CITY PROGRAMME: URBAN WOODLAND AND TREES<br />
What?<br />
As part of the Woodland and Tree Management Plan, highway tree inspection and<br />
works, woodland health and safety inspection, tree planting and woodland<br />
inspection and works will take place.<br />
Where?<br />
Borough-wide<br />
When?<br />
By 2015<br />
Why?<br />
For all other deficient areas, gaps should be met by increasing the “naturalness” of<br />
existing areas of formal open space (e.g. through woodland planting). Meeting<br />
deficiencies as identified above will also go some way towards meeting the Natural<br />
England Local Nature Reserve Standard, which highlights a shortfall of 181.5<br />
hectares in Croydon. The Council and its partners will also maximise opportunities<br />
for street tree planting to assist urban cooling in a changing climate.<br />
to tree planting, over 500 replacement trees were planted during the winter of<br />
2012/13 and over 700 trees were planted in existing parks and woodlands. A new<br />
woodland has been created in Rowdown Field, New Addington, in partnership with<br />
the Woodland Trust.<br />
Risks:<br />
<br />
<br />
Spread of pathogens and pests such as Ash Dieback and Oak Processionary<br />
Moth.<br />
Further reduction in budgets.<br />
Mitigation:<br />
Management of budget to allow the continuation of existing programmes.<br />
Stakeholder Engagement Since March 2012:<br />
No information available for this update.<br />
Progress Since March 2012:<br />
Maintenance work is carried out via various programmes and is on-going. In regards<br />
Planned Provision<br />
Lead<br />
Partner<br />
Delivery Partners/<br />
Stakeholders<br />
Delivery<br />
Mechanism/<br />
Funding Source<br />
Cost (if<br />
known)<br />
Location 2011-<br />
2015<br />
2016-<br />
2020<br />
2021- Relationship to CLP Strategic<br />
Policies: (3) Critical, (2)<br />
Necessary, (1) Contributory<br />
Woodland and Tree Management Plan: Highway tree<br />
inspection and works, Woodland Health and Safety<br />
Inspection, Tree planting, Woodland inspection and works.<br />
LBC LBC LBC £690,000 Boroughwide<br />
Y<br />
1<br />
46