01.12.2014 Views

2009 SMS Pilot Project (SMSPP) Analysis - FAA

2009 SMS Pilot Project (SMSPP) Analysis - FAA

2009 SMS Pilot Project (SMSPP) Analysis - FAA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 6-2: Detailed Gap <strong>Analysis</strong> (continued)<br />

Detailed Gap <strong>Analysis</strong> Results NP P DOC I DEM<br />

Component 3.0 Safety Assurance<br />

The organization monitors, measures, and evaluates the<br />

performance of risk controls.<br />

Element 3.1 Safety performance monitoring and measurement<br />

The organization monitors systems and operations to identify<br />

new hazards<br />

Sub-Element 3.1.1 Continuous Monitoring<br />

The organization monitor data throughout the lifecycle,<br />

including those associated with components and services<br />

received from suppliers and contractors, to identify hazards,<br />

measure the effectiveness of safety risk controls, and assess<br />

system performance.<br />

Sub-Element 3.1.2 Internal Audit<br />

The organization will conduct internal audits of the <strong>SMS</strong> at<br />

planned intervals, to determine if the <strong>SMS</strong> conforms to the<br />

organization’s processes and procedures.<br />

Sub-Element 3.1.3 Internal Evaluation<br />

The organization will perform regularly scheduled internal<br />

evaluations of its systems and operations to determine the<br />

performance and effectiveness of risk controls.<br />

Sub-Element 3.1.4 Investigation<br />

The organization has procedures to collect data to investigate<br />

instances of potential regulatory non-compliance and to<br />

identify potential new hazards or risk control failures.<br />

Sub-Element 3.1.5 Employee Reporting and Feedback System<br />

The organization actively uses an employee safety reporting<br />

and feedback system<br />

Sub-Element 3.1.6 <strong>Analysis</strong> of Data<br />

The organization analyzes the data acquired in Sub-Elements<br />

3.1.1 through 3.1.5 to assess the performance and effectiveness<br />

of risk controls in the organization’s systems and operations<br />

Sub-Element 3.1.7 System Assessment<br />

The organization will assess the safety performance and<br />

effectiveness of risk controls, conformance to <strong>SMS</strong><br />

expectations as stated herein, and the objectives of the safety<br />

policy.<br />

Sub-Element 3.1.8 Management Review<br />

As part of their commitment to continual improvement, top<br />

management will conduct annual reviews of the <strong>SMS</strong>, at a<br />

minimum. Management reviews will include assessing the<br />

performance and effectiveness of the organization’s systems<br />

and operations and the new<br />

Element 3.2 Management of Change<br />

The organization will identify and assess safety risk for<br />

changes arising within or external to the organization that may<br />

affect established systems or operations. These changes may<br />

be to existing system designs, new system designs, or<br />

new/modified operations<br />

62% 38%<br />

50% 38% 12%<br />

38% 25% 38%<br />

38% 38% 12% 12%<br />

38% 38% 12% 12%<br />

12% 25% 12% 12% 38%<br />

38% 50% 12%<br />

38% 38% 25%<br />

38% 50% 12%<br />

50% 25% 25%<br />

38% 25% 12% 12% 12%<br />

31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!