Polaris<br />

Engineering<br />

Standard<br />

430.1<br />

Rev.: 0<br />

Page: 6 of 9<br />

Date: 07/07/09<br />

d. Anchor bolt locations from coordinate lines of the foundation:<br />

Without sleeves<br />

With sleeves<br />

±1/8 inch<br />

±1/4 inch<br />

e. Anchor bolt projections from final specified support elevation:<br />

±1/4 inch<br />

f. Cross sectional dimensions of columns, beams, walls, and slabs:<br />

Up to 12 inches<br />

Over 12 inches<br />

+3/8, -1/4 inch<br />

+1/2, -3/8 inch<br />

g. Footings:<br />

Horizontal dimensions:<br />

Formed<br />

Unformed<br />

+2 inches, -1/2 inch<br />

+3 inches<br />

Misplacement or eccentricity of footing under pier (from<br />

coordinate line):<br />

Two (2) percent of the footing width in the direction of<br />

misplacement but not more than 2 inches<br />

Cross sectional thickness:<br />

+5 inches, -5 percent<br />

Level: +1/2 inch, -2 inches<br />

h. Concrete structures linear building lines from the basic dimensions<br />

in plan and related position of columns, walls and beams:<br />

In any bay<br />

In any 20 feet<br />

Structure overall<br />

±1/2 inch<br />

±1/2 inch<br />

±1 inch<br />

i. Paving:<br />

Elevations of high points and low points<br />

±3/4 inch<br />

Depressions between high spots measured below a 10 foot<br />

straightedge:<br />

Paving<br />

Roads<br />

1/4 inch<br />

3/8 inch