Timeline<br />
• Average time for a building permit is up to 4 ½ months,<br />
factoring in plan check, resubmittals <strong>and</strong> issuance of<br />
permit<br />
• Complete Plans must be submitted in order to avoid<br />
multiple back-check revisions which can take longer than<br />
the initial review<br />
• Summer construction - submit plans by January<br />
• Winter Break construction - submit by early August<br />
14