Timeline<br />

• Average time for a building permit is up to 4 ½ months,<br />

factoring in plan check, resubmittals <strong>and</strong> issuance of<br />

permit<br />

• Complete Plans must be submitted in order to avoid<br />

multiple back-check revisions which can take longer than<br />

the initial review<br />

• Summer construction - submit plans by January<br />

• Winter Break construction - submit by early August<br />