Project Document Turnover<br />
• Deliverables are important (permits, operation <strong>and</strong><br />
maintenance manuals, specifications <strong>and</strong> record drawings)<br />
• Project deliverables are submitted using our As-Built<br />
transmittal form (downloadable from our website)<br />
• Document submittals are accepted in hardcopy format<br />
with corresponding CAD <strong>and</strong> <strong>PDF</strong> files<br />
• Turn over documents are typically available on-line in pdf<br />
format within 3 months of receipt<br />