Recommendations<br />
• Expediting permits<br />
• Utilize “over the counter” permit option when possible<br />
• 340 Bonair SCC office is open Tuesdays 11a – noon <strong>and</strong> 1-2:30p<br />
• Utilize Pre-Submittal Consultation<br />
• Could shorten plan review time based upon advanced<br />
knowledge of project scope <strong>and</strong> reduce back-check revisions<br />
• There is a fee for this service<br />
• Limited overtime review is available (Fire Marshal only) <strong>and</strong><br />
requires approval from PMR when OT requests significantly<br />
impact other projects in SCCO Permit Queue<br />