Recommendations<br />

• Expediting permits<br />

• Utilize “over the counter” permit option when possible<br />

• 340 Bonair SCC office is open Tuesdays 11a – noon <strong>and</strong> 1-2:30p<br />

• Utilize Pre-Submittal Consultation<br />

• Could shorten plan review time based upon advanced<br />

knowledge of project scope <strong>and</strong> reduce back-check revisions<br />

• There is a fee for this service<br />

• Limited overtime review is available (Fire Marshal only) <strong>and</strong><br />

requires approval from PMR when OT requests significantly<br />

impact other projects in SCCO Permit Queue<br />