01.12.2014 Views

Permitting, Construction and Closeout (PDF) - Stanford University

Permitting, Construction and Closeout (PDF) - Stanford University

Permitting, Construction and Closeout (PDF) - Stanford University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Helpful Links<br />

Plans Review Process: Maps <strong>and</strong> Records receives project records for construction<br />

projects campus-wide during review phases: http://maps/plans_review<br />

Plans Review Transmittal Template: http://maps/sites/all/lbreshared/files/maps/files/shared/file/maps_records/maps_PR_Transmittal_Letter_2011.<br />

pdf<br />

Plans Review Comment Form: http://maps/sites/all/lbreshared/files/maps/files/shared/file/maps_records/maps_PR_Comment_Form.xls<br />

Turn Over Process: Maps <strong>and</strong> Records provides the <strong>University</strong> with a permanent<br />

record of construction <strong>and</strong> renovations, in order to facilitate troubleshooting <strong>and</strong><br />

provide information for future building alterations: http://maps/delivering<br />

As-Built Transmittal Template: http://maps/sites/all/lbreshared/files/maps/files/shared/file/maps_records/As-Built-template_2010.doc<br />

Project Archives: Tool to search for listings of documents archived at Maps <strong>and</strong><br />

Records:<br />

http://maps-archives.stanford.edu<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!