7 October 2010 <strong>Discovery</strong> <strong>Metals</strong> <strong>Limited</strong><br />

Source: Company data<br />

Boseto Copper Project (BCP)<br />

Highlights<br />

• Located in north-west Botswana, DML commenced a pre-feasibility study in August 2007<br />

and announced the outcomes of the BFS at the end of August 2010. A summary of the<br />

project is included below:<br />

− Extended Pre-Feasibility Study update in January 2009.<br />

− Definitive Feasibility Study and Development Plan September 2010.<br />

−<br />

−<br />

−<br />

−<br />

Open pit mine with 15-year mine life through a combination of open pit and<br />

underground mining.<br />

3mtpa conventional flotation concentrator-Recoveries of 83.6% Cu and 61% Ag.<br />

To produce 36.4kt Cu and 1.1moz Ag per annum (in concentrate 41% Cu grade).<br />

CAPEX of US$175m and net cash cost US$1.23/lb.<br />

− NPV of US$375m at a copper price of US$3.00lb and US$17/oz silver at a 10%<br />

discount rate and inclusive of coal-fired power.<br />

• Three strike zones containing 102.8mt of Mineral Resources:<br />

− Zeta: 35.4mt @ 1.4% Cu and 22.3g/t Ag<br />

− Plutus: 22.6mt @ 1.5% Cu and 15.3g/t Ag<br />

− Plutus (NE): 14.9mt @ 1.2% Cu and 12.5g/t Ag<br />

− Petra: 12.7mt @ 1.3% Cu and 15.0g/t Ag<br />

− Petra (SW): 17.2mt @ 1.4% Cu and 17.3g/t Ag<br />

Introduction<br />

<strong>Discovery</strong> <strong>Metals</strong>' Boseto Copper Project (100% owned) is located in north-west Botswana,<br />

approximately 80km south-west of the town of Maun, within the district of Namaqualand. A<br />

seven-tenement package was granted to <strong>Discovery</strong> <strong>Metals</strong> in September 2005 and fieldwork<br />

on this tenement package commenced in October 2005. The Government of Botswana<br />

approved the company's renewal of these tenements in September 2008 and all prospective<br />

areas were retained by the company.<br />

In June 2008, <strong>Discovery</strong> <strong>Metals</strong> was granted an additional seven tenements extending from<br />

the south-west boundary of the original 2005 granted tenements through to the Namibian<br />

border, adding 5,700km 2 to the area held under prospecting licences, to bring the total<br />

tenement area to 10,100km 2 . In September 2010, DML relinquished 444km 2 as required to<br />

<strong>Goldman</strong> <strong>Sachs</strong> & Partners Australia<br />

Investment <strong>Research</strong><br />

All figures in A$ unless otherwise advised 6