- Page 1: APPENDIX J METROPOLITAN COAL PROJEC
- Page 5 and 6: TABLE OF CONTENTS 11 OFF-SITE TRANS
- Page 7 and 8: 1 INTRODUCTION 1.1 Assessment Requi
- Page 9 and 10: • HCPL to implement a continuous
- Page 11 and 12: Table 2 Current and Proposed Hours
- Page 13 and 14: Table 3 Nearest Potentially Affecte
- Page 15 and 16: Table 5 Atmospheric Stability Frequ
- Page 17 and 18: Table 8 Unattended Background Noise
- Page 19 and 20: 4.4 Ambient Traffic Noise Monitorin
- Page 21 and 22: Ideally, the intrusive noise emissi
- Page 23 and 24: 5.4 Noise Impact Assessment Methodo
- Page 25 and 26: Table 16 Fixed Plant Noise Audit -
- Page 27 and 28: 6.5 Project Noise Model Scenarios T
- Page 29 and 30: The PRP 12 Study concluded that whi
- Page 31 and 32: 7.6 Continuous Noise Improvement Pr
- Page 33 and 34: Existing Metropolitan Colliery Nois
- Page 35 and 36: Existing Metropolitan Colliery Nois
- Page 37 and 38: Existing Metropolitan Colliery Nois
- Page 39 and 40: Existing Metropolitan Colliery Nois
- Page 41 and 42: Existing Metropolitan Colliery Nois
- Page 43 and 44: Existing Metropolitan Colliery Nois
- Page 45 and 46: Table 27 Predicted Distance Require
- Page 47 and 48: Table 31 Peak Hourly Existing and P
- Page 49 and 50: Table 34 Midweek Existing and Cumul
- Page 51 and 52: Table 38 Predicted Train Generated
- Page 53 and 54:
• Negligible noise level increase
- Page 55 and 56:
HCPL would implement a range of noi
- Page 57 and 58:
Similarly, ground vibration levels
- Page 59:
Appendix A1 Report 10-5055-R1 Page
- Page 62 and 63:
Initial Development Schedule Projec
- Page 64 and 65:
LARGE COAL CIRCUIT ROM Bin Dump Hop
- Page 66 and 67:
Zoning LEGEND Coal Lease Boundary M
- Page 68 and 69:
Appendix E1 Report 10-5055-R1 Page
- Page 70 and 71:
Appendix E1 Report 10-5055-R1 Page
- Page 72 and 73:
Appendix F1 Report 10-5055-R1 Page
- Page 74 and 75:
Appendix F1 Report 10-5055-R1 Page
- Page 76 and 77:
Appendix F2 Report 10-5055-R1 Page
- Page 78 and 79:
Appendix F2 Report 10-5055-R1 Page
- Page 80 and 81:
Appendix F2 Report 10-5055-R1 Page
- Page 82 and 83:
Appendix F2 Report 10-5055-R1 Page
- Page 84 and 85:
Appendix F2 Report 10-5055-R1 Page
- Page 86 and 87:
Appendix F2 Report 10-5055-R1 Page
- Page 88 and 89:
Appendix F2 Report 10-5055-R1 Page
- Page 90 and 91:
Appendix F2 Report 10-5055-R1 Page
- Page 92 and 93:
Appendix F2 Report 10-5055-R1 Page
- Page 94 and 95:
Appendix F2 Report 10-5055-R1 Page
- Page 96 and 97:
Appendix G1 Report 10-5055-R1 Page
- Page 98 and 99:
Appendix G2 Report 10-5055-R1 Page
- Page 100 and 101:
Appendix G2 Report 10-5055-R1 Page
- Page 102 and 103:
Appendix G2 Report 10-5055-R1 Page
- Page 104 and 105:
Appendix G2 Report 10-5055-R1 Page
- Page 106 and 107:
Appendix G2 Report 10-5055-R1 Page
- Page 108 and 109:
Appendix G2 Report 10-5055-R1 Page
- Page 110 and 111:
Appendix H Report 10-5055-R1 Page 1
- Page 112 and 113:
6 217 000 N 35 314 000 E 315 000 E