31.12.2014 Views

Appendix J - Peabody Energy

Appendix J - Peabody Energy

Appendix J - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LEGEND<br />

Raw Coal Handling<br />

Coal Handling & Preparation Plant<br />

(refer Figure 2-6)<br />

Product Coal Handling<br />

Coal Reject Handling<br />

Surface<br />

ROM<br />

Stockpile<br />

Truck to Corrimal/<br />

Coalcliff Coke Works<br />

Main Drive Conveyor<br />

Main Drive Conveyor<br />

ROM Bin<br />

Dump<br />

Hopper<br />

Crusher<br />

CHPP<br />

Hard Coking Coal<br />

Semi-hard Coking Coal<br />

Thermal Coal<br />

Front End Loader<br />

Train Loading for Export<br />

Fine Reject<br />

Stockpile<br />

Coarse Reject<br />

Stockpile<br />

Trunk<br />

Conveyors<br />

Coal Reject<br />

Paste Plant<br />

Sizer<br />

Truck to Glenlee Washery<br />

Longwall<br />

Machine<br />

(Refer Figure 2-7)<br />

Underground<br />

Development<br />

Units<br />

Pipeline to<br />

Underground<br />

Approved Camp Gully Emplacement<br />

(if required in future)<br />

Underground Goaf Injection of Coal Rejects<br />

Heggies Pty Ltd<br />

MET-06-02 EA Noise_006B<br />

APPENDIX C2<br />

Materials Handling<br />

Schematic Flowsheet<br />

Source: HCPL (2007)<br />

METROPOLITAN COAL PROJECT<br />

HELENSBURGH COAL PTY LTD

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!