PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />
� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />
Kiev, Ukraine • Pobedy Prospekt Komplex<br />
Design Werner Sobek, Germany<br />
Kiev<br />
Pobedy Prospekt Komplex<br />
Location Kiev, Ukraine<br />
Height of high-rise buildings 230 m (2 Towers)<br />
Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF) (planned)<br />
Length / Diameter of the bored piles 35 m – 45 m / 1.3 m - 1.5 m (planned)<br />
Thickness of the raft 2.5 m – 4.0 m (planned)<br />
Time of construction 2008 - 2012<br />
Tasks Geotechnical, geological and hydrogeological consultancy<br />
Design and numerical simulations of the foundation