� TUNNEL<br />

New Tunnel Mainz<br />

North<br />

Mainz main station<br />

concrete<br />

inner<br />

lining<br />

fill<br />

clay, silt, marl<br />

shotcrete lining<br />

excavation<br />

bench/invert<br />

max. 120 m<br />

fill<br />

limestone bed<br />

clay, silt, marl<br />

limestone bed<br />

Mainz centre<br />

~30 m<br />

top heading<br />

~50 m<br />

1-1.5 m<br />

1.292m<br />

fill<br />

sidewall drift<br />

1-1.5 m<br />

fill<br />

clay, silt, marl<br />

sidewall<br />

drift<br />

top<br />

heading<br />

bench/<br />

invert<br />

South<br />

Mannheim<br />

North South East<br />

West<br />

sidewall<br />

drift<br />

bolting<br />

gw fill fill gw<br />

Location DB Extension Line Mainz-Mannheim, Germany<br />

Length of tunnel 1,300 m<br />

Tunnelling method Shotcrete tunnelling with sidewall drifts<br />

Section Double-tracked<br />

130 m² (full section)<br />

Time of construction 1998 – 2001<br />

Tasks Geotechnical and tunnelling approval for the German Railway Authority