PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />
� TUNNEL<br />
Frankfurt 21<br />
m.a.s.l.<br />
140.00<br />
120.00<br />
100.00<br />
80.00<br />
60.00<br />
40.00<br />
m.a.s.l.<br />
140.00<br />
120.00<br />
100.00<br />
80.00<br />
60.00<br />
40.00<br />
20.00<br />
0.00<br />
Frankfurt<br />
Main Station<br />
Frankfurt Clay<br />
Limestone Bed<br />
Subway<br />
Frankfurt limestone<br />
Frankfurt Clay<br />
Tunnel City North<br />
Main<br />
North Main Station<br />
Subway<br />
Subway<br />
Frankfurt Limestone<br />
Tertiary marl<br />
Location Frankfurt/Main, Germany<br />
Length of tunnel Tunnel City North 2 x 3,130 m<br />
Tunnelling method<br />
Tunnel City South 2 x 1,770 m<br />
Shield driving / Earth supported face (planning)<br />
Section 4 Single-tracked<br />
Time of construction Planning<br />
Tasks Geotechnical and tunnelling feasibility study<br />
Concept, tender and allocation of the ground investigation<br />
Supervision of the ground investigation<br />
Ground and foundation report, tunnelling report<br />
gw<br />
South