PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />
� TUNNEL<br />
Lohbergtunnel<br />
Location Mühltal, Germany<br />
Length of tunnel 1080 m<br />
Section 86.6 m²<br />
Diameter 10.5 m<br />
Tunnelling method Shotcrete tunnelling with partial drivings<br />
Time of construction 2003 – 2007<br />
Tasks Supervision and documentation of the geotechnical work and of the face<br />
Geotechnical and tunnelling consultancy<br />
Geotechnical and tunnelling contract management<br />
Geoenvironmental report (Asbestos)