09.11.2012 Views

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Lohbergtunnel<br />

Location Mühltal, Germany<br />

Length of tunnel 1080 m<br />

Section 86.6 m²<br />

Diameter 10.5 m<br />

Tunnelling method Shotcrete tunnelling with partial drivings<br />

Time of construction 2003 – 2007<br />

Tasks Supervision and documentation of the geotechnical work and of the face<br />

Geotechnical and tunnelling consultancy<br />

Geotechnical and tunnelling contract management<br />

Geoenvironmental report (Asbestos)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!