- Page 1 and 2: STANDARD FORM OF BIDDING DOCUMENTS
- Page 3 and 4: PREFACE 1. Pakistan Engineering Cou
- Page 5 and 6: INSTRUCTIONS TO USERS OF THIS DOCUM
- Page 7 and 8: The user is required to prepare the
- Page 9 and 10: 2. Sub-Clauses 6.6, 6.9, 6.10, 16.5
- Page 11 and 12: SUMMARY OF CONTENTS Subject Page No
- Page 13 and 14: INVITATION FOR BIDS (3)
- Page 15 and 16: INSTRUCTIONS TO BIDDERS (5)
- Page 17 and 18: Clause No. Description Page No. F.
- Page 19 and 20: substantially different in basic ch
- Page 21 and 22: (a) (b) (c) Covering Letter Form of
- Page 23 and 24: 12.3 The currencies of payment shal
- Page 25 and 26: e agreed to between the joint ventu
- Page 27 and 28: IB.17 Format and Signing of Bid 17.
- Page 29 and 30: IB.21 Modification, Substitution an
- Page 31 and 32: If the Bidder does not accept the c
- Page 33 and 34: (iii) Price Adjustment for Commerci
- Page 35 and 36: IB.28 Process to be Confidential 28
- Page 37 and 38: IB.35 Signing of Contract Agreement
- Page 39 and 40: Appendix A to Instructions to Bidde
- Page 41 and 42: Sr.No. Information to be Supplied B
- Page 43: Domestic Goods (Value added in Paki
- Page 47 and 48: SCHEDULES TO BID INCLUDE THE FOLLOW
- Page 49 and 50: SCHEDULE - B TO BID WORK TO BE PERF
- Page 51 and 52: SCHEDULE - D TO BID DEVIATIONS FROM
- Page 53 and 54: SCHEDULE - F TO BID METHOD OF PERFO
- Page 55 and 56: SCHEDULE - H TO BID (INTEGRITY PACT
- Page 57 and 58: 1. PREAMBLE TO SCHEDULE OF PRICES 1
- Page 59 and 60: The various elements of Bid Prices
- Page 61 and 62: h) Local Transport Inland transport
- Page 63 and 64: sub-total. These spare parts shall
- Page 65 and 66: 2.3 Rates entered in the Daywork Sc
- Page 67 and 68: 2. (b) SCHEDULE OF PRICES - EQUIPME
- Page 69 and 70: 2. (d) SCHEDULE OF PRICES DAYWORK I
- Page 71 and 72: 2. (f) SCHEDULE OF PRICES - ADDITIO
- Page 73 and 74: PREAMBLE TO CONDITIONS OF CONTRACT
- Page 75 and 76: Employer’s Equipment ____________
- Page 77 and 78: GENERAL CONDITIONS OF CONTRACT (67)
- Page 79 and 80: [Notes on the Conditions of Contrac
- Page 81 and 82: FEDERATION INTERNATIONALE DES INGEN
- Page 83 and 84: CONTENTS PART I: GENERAL CONDITIONS
- Page 85 and 86: 20.1 Independent Inspection 20.2 In
- Page 87 and 88: 36.2 Ordering Work against Provisio
- Page 89 and 90: PART-I: GENERAL CONDITIONS Definiti
- Page 91 and 92: 1.1.24 "Programme" means the Progra
- Page 93 and 94: Except as expressly stated in the C
- Page 95 and 96:
neglects of the Contractor, his age
- Page 97 and 98:
Unless otherwise stated in Part II
- Page 99 and 100:
10.2 Period of Validity The Perform
- Page 101 and 102:
12.2 Alteration to Programme No mat
- Page 103 and 104:
the Engineer and his representative
- Page 105 and 106:
17.3 Civil Works on Site Any buildi
- Page 107 and 108:
Representative. Notice of such appo
- Page 109 and 110:
order to suspend progress or delive
- Page 111 and 112:
26.2 Delays by Subcontractors The C
- Page 113 and 114:
28.4 Facilities for Tests on Comple
- Page 115 and 116:
eing so used by the Employer. Claus
- Page 117 and 118:
30.7 Further Tests on Completion If
- Page 119 and 120:
in all the circumstances reasonable
- Page 121 and 122:
33.6 Delayed Payment If payment of
- Page 123 and 124:
34.2 Assessment When the Engineer h
- Page 125 and 126:
through which plant must be transpo
- Page 127 and 128:
(a)to the fulfillment of the Contra
- Page 129 and 130:
the Preamble, and (b)during the Def
- Page 131 and 132:
44.2 Effect of Force Majeure Neithe
- Page 133 and 134:
45.2 Contractor's Default If the Co
- Page 135 and 136:
47.2 Statutory and Other Regulation
- Page 137 and 138:
No payments due or payable by the E
- Page 139 and 140:
INDEX Clause Page Access, authority
- Page 141 and 142:
INDEX Damage to the Works, passing
- Page 143 and 144:
INDEX Import Duties and Customs 48.
- Page 145 and 146:
INDEX Plant, rejection 21.1 Plant,
- Page 147 and 148:
INDEX Working Hours, Restriction of
- Page 149 and 150:
after the word „hereof‟. Item 5
- Page 151 and 152:
(141)
- Page 153 and 154:
PART-II: PARTICULAR CONDITIONS OF C
- Page 155 and 156:
42.2 Maximum Liability 165 42.6 For
- Page 157 and 158:
PART-II: PARTICULAR CONDITIONS OF C
- Page 159 and 160:
Sub-Clause 2.6 Confirmation in Writ
- Page 161 and 162:
maintenance data shall also include
- Page 163 and 164:
In Sub-Clause 12.1(c)(iv) the words
- Page 165 and 166:
“The Employer shall, if the Contr
- Page 167 and 168:
Sub-Clause 18.7 Arms and Ammunition
- Page 169 and 170:
on the basis of the sums mentioned
- Page 171 and 172:
The Contractor may, at any time, su
- Page 173 and 174:
Sub-Clause 35.2 Currency Restrictio
- Page 175 and 176:
Sub-Clause 42.6 Foreseen Damage Sub
- Page 177 and 178:
Sub-Clause 47.1 Labour, Materials a
- Page 179 and 180:
The venue of arbitration proceeding
- Page 181 and 182:
STANDARD FORMS (171)
- Page 183 and 184:
STANDARD FORMS Page No. Standard Fo
- Page 185 and 186:
then the entire sum be paid immedia
- Page 187 and 188:
Signature of the Contactor ________
- Page 189 and 190:
payment will be effected by the Gua
- Page 191 and 192:
total amount to be claimed hereunde
- Page 193 and 194:
SPECIFICATIONS SPECIAL PROVISIONS (
- Page 195 and 196:
SPECIFICATIONS - SPECIAL PROVISIONS
- Page 197 and 198:
SPECIFICATIONS TECHNICAL PROVISIONS
- Page 199 and 200:
DRAWINGS (To be prepared and incorp