INSTRUCTIONS TO USERS <strong>OF</strong> THIS DOCUMENT<br />

(Not to be included in Bidding Documents)<br />

As stated in Clause IB.5 of Instructions to Bidders, the complete Bidding Documents shall<br />

comprise ten (10) items listed therein including any addendum to Bidding Documents issued<br />

in accordance with Clause IB.7. The Standard Form of Bidding Documents, in addition to<br />

“Invitation for Bids” include the following:<br />

1. Instructions to Bidders with Appendices<br />

2. Forms of Bid & Schedules to Bid<br />

Schedules to Bid are the following:<br />

(i) Schedule A: Specific Works Data<br />

(ii) Schedule B: Work to be Performed by Subcontractors<br />

(iii) Schedule C: Proposed Programme of Works<br />

(iv) Schedule D: Deviations from Technical Provisions<br />

(v) Schedule E: Deviations from Contractual Conditions<br />

(vi) Schedule F: Method of Performing Works<br />

(vii) Schedule G: Proposed Organisation<br />

(viii) Schedule H: Integrity Pact<br />

3. Schedule of Prices<br />

4. Preamble to Conditions of Contract<br />

5. General Conditions of Contract<br />

6. Particular Conditions of Contract<br />

7. Standard Forms<br />

Forms include the following:<br />

(i) Form of Bid Security<br />

(ii) Form of Contract Agreement<br />

(iii) Form of Performance Security<br />

(iv) Form of Bank Guarantee/Bond for Advance Payment<br />

8. Specifications - Special Provisions<br />

9. Specifications - Technical Provisions<br />

10. Drawings<br />

The Instructions to Bidders can be used as given. User may have to make changes in the text<br />

under some special circumstances. However, blank spaces in Instructions to Bidders are<br />

required to be filled by the Employer/Engineer on bid to bid basis before issuance of Bidding<br />

Documents.<br />

The General Conditions of Contract should be retained as such except otherwise as amended<br />

by the Pakistan Engineering Council (PEC) and indicated by the PEC either in the Particular<br />

Condition of Contract (PCC) or in the Instructions to Users. Any Further change in Clauses<br />

of Particular Conditions of Contract mentioned in “Paragraph D” hereinafter should be made<br />

with care.<br />