- Page 1 and 2: REQUEST FOR PROPOSALS PIN Project P
- Page 3 and 4: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 5 and 6: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 7 and 8: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 9 and 10: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 11 and 12: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 13 and 14: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 15 and 16: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 17 and 18: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 19 and 20: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 21 and 22: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 23 and 24: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 25 and 26: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 27 and 28: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 29 and 30: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 31 and 32: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 33 and 34: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 35 and 36: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 37 and 38: PROJECT: PW311STLS PIN: 8502011RQ00
- Page 39 and 40: Tax ID #: PIN #: 8502011RQ0008P-12P
- Page 41 and 42: Tax ID #: PIN #: 8502011RQ0008P-12P
- Page 43 and 44: ATTACHMENT 7 DOING BUSINESS DATA FO
- Page 49 and 50: THE CITY OF NEW YORK DEPARTMENT OF
- Page 51 and 52: 1.11 “Days” shall mean calendar
- Page 53 and 54: the Contract shall take precedence;
- Page 55 and 56: ARTICLE 6 - Scope of Services 6.1 G
- Page 57 and 58: Executive. Compensation for the Con
- Page 59 and 60: 7.4.3 All Inclusive Hourly Rates: A
- Page 61 and 62: (1) For each Work Order for which p
- Page 63 and 64: 4. If Subcontractor Participation G
- Page 65 and 66: 13. If Subcontractor Participation
- Page 67 and 68: IN WITNESS WHEREOF, the parties her
- Page 69 and 70: EXHIBIT A: CONTRACT INFORMATION Ty
- Page 71 and 72: EXHIBIT C STAFFING REQUIREMENTS TIT
- Page 73 and 74: EXHIBIT D THE CITY OF NEW YORK DEPA
- Page 75 and 76: 4.01 Preparation of Topographical a
- Page 77 and 78: A sketch and/or written description
- Page 79 and 80: away so that construction operation
- Page 81 and 82: permanent objects include: steps, s
- Page 83 and 84: wire crossing over roadways. Provid
- Page 85 and 86: SECTION 1.09.4 will be invoked by t
- Page 87 and 88: 3. Rejected: If the Commissioner de
- Page 89 and 90: All elevations shall refer to the a
- Page 91 and 92: files in AutoCAD Release 2009 w/cas
- Page 93 and 94: K. Titles The Consultant shall, upo
- Page 95 and 96:
and paid for separately and the wor
- Page 97 and 98:
4.04 COMPLETION SHEDULE - TIME FRAM
- Page 99 and 100:
B. For surveys located within the m
- Page 101 and 102:
3. The Consultant shall submit to t
- Page 103 and 104:
1. Forty five (45) consecutive cale
- Page 105 and 106:
C. For unit price item No. 4 the lo
- Page 107 and 108:
submission of preliminary. Layout m
- Page 109 and 110:
6.03.5 SURVEY CONTROL MAP A. A 1”
- Page 111 and 112:
7.01 PREPARATION OF TOPOGRAPHICAL M
- Page 113 and 114:
Where a project is required to be p
- Page 115 and 116:
9.03.4 Horizontal Controls The Cons
- Page 131 and 132:
EXHIBIT E APPENDIX A GENERAL PROVIS
- Page 133 and 134:
ARTICLE 8 - PROTECTION OF PERSONS A
- Page 135 and 136:
Appendix A December 2010 Final APPE
- Page 137 and 138:
Appendix A December 2010 Final acco
- Page 139 and 140:
Appendix A December 2010 Final G. T
- Page 141 and 142:
Appendix A December 2010 Final 2. W
- Page 143 and 144:
Appendix A December 2010 Final C. T
- Page 145 and 146:
Appendix A December 2010 Final Sect
- Page 147 and 148:
Appendix A December 2010 Final Sect
- Page 149 and 150:
Appendix A December 2010 Final 3. R
- Page 151 and 152:
Appendix A December 2010 Final B. T
- Page 153 and 154:
Appendix A December 2010 Final b. f
- Page 155 and 156:
Appendix A December 2010 Final B. N
- Page 157 and 158:
Appendix A December 2010 Final mate
- Page 159 and 160:
Appendix A December 2010 Final 4. C
- Page 161 and 162:
Appendix A December 2010 Final B. U
- Page 163 and 164:
Appendix A December 2010 Final not
- Page 165 and 166:
Appendix A December 2010 Final 1. T
- Page 167:
Appendix A December 2010 Final CERT