Guidelines on promulgation of NAVAREA warnings. - Indian Naval ...
Guidelines on promulgation of NAVAREA warnings. - Indian Naval ...
Guidelines on promulgation of NAVAREA warnings. - Indian Naval ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
17<br />
take into account the latest Notices to Mariners and <strong>NAVAREA</strong> <strong>warnings</strong> in<br />
force which are available in the <strong>of</strong>ficial NHO website (www.hydrobharat.nic.in).<br />
The c<strong>on</strong>cerned agencies may also to refer to the latest editi<strong>on</strong>s <strong>of</strong> nautical<br />
charts and publicati<strong>on</strong>s, if available and c<strong>on</strong>firm that the planned operati<strong>on</strong><br />
does not hamper any other activity or has any ec<strong>on</strong>omic ramificati<strong>on</strong>s The<br />
resp<strong>on</strong>sibility <strong>of</strong> agencies involved in providing necessary clearances is as<br />
appended below:-<br />
(i) The originating agencies are also to refer the request for<br />
<strong>NAVAREA</strong> promulgati<strong>on</strong> to IHQ MoD (Navy)/DNO for approval <strong>of</strong> text <strong>of</strong><br />
message.<br />
(ii) IHQ MoD (Navy) / DNO is to forward the approval so as to reach<br />
the <strong>NAVAREA</strong> Coordinator ten working days prior to the scheduled<br />
trials/launch date.<br />
(iii) In case <strong>of</strong> operati<strong>on</strong>s covering wide sea areas e.g. DRDO/ISRO<br />
two definite launch dates <strong>of</strong> limited time durati<strong>on</strong> (maximum five hours)<br />
is to be specified by the originating agency.<br />
(iv) The originating agencies should inform all agencies including<br />
FODAG, DG Hydrocarb<strong>on</strong>s, local Port <strong>of</strong>fices, Fisheries department etc<br />
about the special operati<strong>on</strong>s well in time. The agencies are to resolve<br />
issues bilaterally in case <strong>of</strong> overlapping requirements. The list <strong>of</strong><br />
addressees to be informed is placed at Appendix ‘B’.<br />
(v) FODAG is to c<strong>on</strong>firm the presence <strong>of</strong> any oil rigs/seismic vessels<br />
within the danger z<strong>on</strong>e and inform c<strong>on</strong>cerned vessel, E& P operator.<br />
(vi) The Officer-in-Charge, <strong>Naval</strong> Chart Depot (Mumbai) is to<br />
promulgate <strong>NAVAREA</strong> warning after clearance from FODAG about oil<br />
rigs/seismic vessels in the danger z<strong>on</strong>e.<br />
(b) Warnings pertaining to Seismic surveys, establishment <strong>of</strong> <strong>of</strong>fshore<br />
structures, cable and pipe-laying activities.<br />
(i) The originating agencies are to take necessary clearances from<br />
IHQ MoD (Navy)/DNI and FODAG for the operati<strong>on</strong>.<br />
(ii) FODAG to undertake the naval security inspecti<strong>on</strong> <strong>of</strong> the vessel<br />
post clearance from IHQ MoD (Navy)/DNI. Approval for<br />
promulgati<strong>on</strong> <strong>of</strong> <strong>NAVAREA</strong> warning is to be forwarded by FODAG so as