03.01.2015 Views

Guidelines on promulgation of NAVAREA warnings. - Indian Naval ...

Guidelines on promulgation of NAVAREA warnings. - Indian Naval ...

Guidelines on promulgation of NAVAREA warnings. - Indian Naval ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

17<br />

take into account the latest Notices to Mariners and <strong>NAVAREA</strong> <strong>warnings</strong> in<br />

force which are available in the <strong>of</strong>ficial NHO website (www.hydrobharat.nic.in).<br />

The c<strong>on</strong>cerned agencies may also to refer to the latest editi<strong>on</strong>s <strong>of</strong> nautical<br />

charts and publicati<strong>on</strong>s, if available and c<strong>on</strong>firm that the planned operati<strong>on</strong><br />

does not hamper any other activity or has any ec<strong>on</strong>omic ramificati<strong>on</strong>s The<br />

resp<strong>on</strong>sibility <strong>of</strong> agencies involved in providing necessary clearances is as<br />

appended below:-<br />

(i) The originating agencies are also to refer the request for<br />

<strong>NAVAREA</strong> promulgati<strong>on</strong> to IHQ MoD (Navy)/DNO for approval <strong>of</strong> text <strong>of</strong><br />

message.<br />

(ii) IHQ MoD (Navy) / DNO is to forward the approval so as to reach<br />

the <strong>NAVAREA</strong> Coordinator ten working days prior to the scheduled<br />

trials/launch date.<br />

(iii) In case <strong>of</strong> operati<strong>on</strong>s covering wide sea areas e.g. DRDO/ISRO<br />

two definite launch dates <strong>of</strong> limited time durati<strong>on</strong> (maximum five hours)<br />

is to be specified by the originating agency.<br />

(iv) The originating agencies should inform all agencies including<br />

FODAG, DG Hydrocarb<strong>on</strong>s, local Port <strong>of</strong>fices, Fisheries department etc<br />

about the special operati<strong>on</strong>s well in time. The agencies are to resolve<br />

issues bilaterally in case <strong>of</strong> overlapping requirements. The list <strong>of</strong><br />

addressees to be informed is placed at Appendix ‘B’.<br />

(v) FODAG is to c<strong>on</strong>firm the presence <strong>of</strong> any oil rigs/seismic vessels<br />

within the danger z<strong>on</strong>e and inform c<strong>on</strong>cerned vessel, E& P operator.<br />

(vi) The Officer-in-Charge, <strong>Naval</strong> Chart Depot (Mumbai) is to<br />

promulgate <strong>NAVAREA</strong> warning after clearance from FODAG about oil<br />

rigs/seismic vessels in the danger z<strong>on</strong>e.<br />

(b) Warnings pertaining to Seismic surveys, establishment <strong>of</strong> <strong>of</strong>fshore<br />

structures, cable and pipe-laying activities.<br />

(i) The originating agencies are to take necessary clearances from<br />

IHQ MoD (Navy)/DNI and FODAG for the operati<strong>on</strong>.<br />

(ii) FODAG to undertake the naval security inspecti<strong>on</strong> <strong>of</strong> the vessel<br />

post clearance from IHQ MoD (Navy)/DNI. Approval for<br />

promulgati<strong>on</strong> <strong>of</strong> <strong>NAVAREA</strong> warning is to be forwarded by FODAG so as

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!