198 ManagingUrbanizationUndera DecentralizedGovernanceFramework<br />

Table 4. Past and Future Traffic Demand in Metro Cebu, 1979-2010<br />

1979 1992 2000 2010<br />

Person trips (000)<br />

Private 111 347 583 901<br />

Public 1029 1346 1728 2309<br />

Total 1139 1695 2311 3210<br />

Annual growth rate 3.05 3.89 3.29<br />

Selected sections<br />

(person trips in 000)<br />

Talisay_-.ebu 35 61 85<br />

Cebu-Mandaue 51 110 159<br />

Mandaue-Consolacion 25 55 82<br />

Mactan-Mainland 17 36 58<br />

Road congestion ratio<br />

Talisay-Cebu 1.18 2.03 2.83<br />

Cebu_Mandaue 0.64 1.38 1.99<br />

Mandaue-Consolacion 1.25 2.75 ' 4.10<br />

Mactan-Mainland 0.86 1.8 2.90<br />

Assumptions<br />

Population (000) 1,274 1,712 2,301<br />

Trip maker (000) 956 1,284 1,726<br />

Trip rate per trip maker 1.68 1.8 1.86<br />

Private vehicles (000) 65 110 170<br />

Source:JICA/RDC VII (1994).<br />

Water su_/y d/st__<br />

As early as 1975, a metropolitan organization has been <strong>for</strong>med<br />

to develop and manage water supply and distribution in Metro Cebum<br />

the Metro Cebu Water District (MCqArD).The MCWD is tasked to<br />

plan, design, construct, operate and maintain water works within areas<br />

of Metro Cebu, namely, Cebu City, Talisay, Compostela, Liloan,<br />

Consolacion, Mandaue City and Lapu-Lapu City. Funding is sourced<br />

through the Local Water Utilities Administration (LWUA).<br />

Recent studies (JICA/RDC VII 1994; David et al. 1998) show<br />

that the water supply capacity of the MCWD at present isnot sufficient<br />

<strong>for</strong> the growing number of urban population in the metropolis. Table<br />

5 provides a picture of the current shortfall and the projected demand<br />

and supply of urban water up to the year 2020 based on the identified<br />

water projects during the period, especially the operation of the<br />

Lusaran Dam.<br />

The challenge <strong>for</strong> Metro Cebu, there<strong>for</strong>e, is how it will <strong>for</strong>mulate<br />

a long-term solution to the current and future water supply problem.<br />

This will mean more projects that allow the development of other<br />

alternative water sources, including the rehabilitation of non-