05.01.2015 Views

Metropolitan Arrangements - Philippine Institute for Development ...

Metropolitan Arrangements - Philippine Institute for Development ...

Metropolitan Arrangements - Philippine Institute for Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

286 Managing UrbanizationUnder a DecentralizedGovernance Framework<br />

Table 13. Transport and Traffic Management in Metro Manila<br />

Governance National Metro Local Others<br />

_Activity<br />

Policy OP MMDA LGUs<br />

Formulation DOTC (Traffic<br />

(Central, LTO, LTFRB) Management<br />

DPWI-I<br />

Units,<br />

(Central, DPWH-NCR) Local Traffic<br />

DILG (PNP)<br />

Ordinances)<br />

TRAFFIM<br />

Transport DOTC MMDA LGUs DeveLopers<br />

Planning (Central, LTFRB, LRTA, BCDA (Fort and<br />

PNR) Bonifacio) Operators<br />

PEA (Manila of busi.ness<br />

Bay Area) complexes<br />

Transport<br />

Services<br />

Rail<br />

DOTC<br />

(PNR, LRTA)<br />

Bus DOTC (L'ITRB) Private<br />

MMTC<br />

Companies<br />

Jeepneys DOTC (Office of<br />

Transport Cooperatives,<br />

LTFRB)<br />

Tricycles<br />

and<br />

Pedicabs<br />

LGUs<br />

Shuttle<br />

Services<br />

Private<br />

Companies<br />

with MMA or within the member agencies of the MMLTCC. For<br />

instance, the construction by DPWH of a fly-over along a section of<br />

Circumferential Road 4 (C-4) that favors private vehicles conflicted<br />

with the DOTC's long-term plan to construct a public-oriented rail<br />

• transit system within the same corridor, The presence of the fly-over<br />

led to complications in the construction of the ongoing Metro Rail<br />

Transit thereby increasing construction and engineering cost,<br />

prolonging" the construction, and further aggravating traffic<br />

congestion in the area.<br />

In the initial phase of the MRT project, there has been a serious<br />

clamor from private citizens and the business sector to address the<br />

traffic problem in the metropolis that has already reached a crisis<br />

stage. Then President Ramos issued Administrative Order No. 351 in

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!