Appendix B: <strong>Consequence</strong>-<strong>Based</strong> <strong>Top</strong> <strong>Screen</strong><br />

Worksheets<br />

Completion of CTS Worksheets<br />

For individual assets or facilities, the potential consequences are considered through a number of<br />

parameters that quantify impacts or effects associated with failure or disruption of the project.<br />

All questions are answered based on the consequences for a specific facility.<br />

In the case of a system of multiple assets, the loss, failure, or disruption of any one individual<br />

asset may trigger consequences affecting the ability of the entire system to meet the critical<br />

function. Therefore, when estimating consequences, the impact of losing the entire system<br />

should be considered rather than the consequences of each individual component. Each asset of<br />

the system that could result in human impact will be evaluated individually however, the<br />

economic consequences and impacts on critical functions represents a reasonable worst case for<br />

the entire system<br />

1. General Facility Information<br />

Project Identification Information<br />

• Dam Name: Official name of the dam.<br />

• Other Dam Names: Other names (i.e., reservoir name) of the dam in common use.<br />

• Dam Former Name: Any previous reservoir or dam name(s), if changed.<br />

• State or Federal Agency ID: Official State or Agency identification number for the<br />

dam.<br />

• NID ID Number: Official NID identification number for the dam.<br />

• Number of Separate Structures: Number of secondary impounding structures<br />

associated with this project (saddle dams or dikes).<br />

• Other Structure ID: NID identification number(s) for secondary impounding<br />

structure(s) associated with this project (saddle dams or dikes).<br />

Appendix B: <strong>Consequence</strong>-<strong>Based</strong> <strong>Top</strong> <strong>Screen</strong> Worksheets 21