05.01.2015 Views

Dams Sector Consequence-Based Top Screen Methodology

Dams Sector Consequence-Based Top Screen Methodology

Dams Sector Consequence-Based Top Screen Methodology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• If available, provide the estimated value of E 2 .<br />

• Provide a short description of how the total remediation costs (E 2 ) were estimated. Please<br />

identify relevant data sources and reference materials (if applicable, include title, author,<br />

date, and/or version of any report, study and/or data source used as reference).<br />

- Does the estimate include downstream property damages (Yes/No)<br />

- Does the estimate include environmental damages (Yes/No)<br />

- Does the estimate include temporary remediation measures (Yes/No)<br />

- Does the estimate include emergency response costs (Yes/No)<br />

Assuming a reasonable worst case scenario, provide an approximated estimate for the<br />

corresponding “Business Interruption Costs” over a period of 12 months after the incident or<br />

event by selecting the appropriate range from the table below.<br />

First-Year Business Interruption Costs, E 3<br />

Level<br />

E 3 (Millions of Dollars/Year)<br />

1 E 3 > 800<br />

2 400 < E 3 ≤ 800<br />

3 200 < E 3 ≤ 400<br />

4 100 < E 3 ≤ 200<br />

5 50 < E 3 ≤ 100<br />

6 25 < E 3 ≤ 50<br />

7 0 < E 3 ≤ 25<br />

8 E 3 = 0<br />

• If available, provide the estimated value of E 3 .<br />

• Provide a short description of how the business interruption costs (E 3 ) were estimated.<br />

Please identify relevant data sources and reference materials (if applicable, include title,<br />

author, date, and/or version of any report, study and/or data source used as reference).<br />

- Does the estimate include water deliveries for municipal and industrial use (Yes/No)<br />

- Does the estimate include water deliveries for agricultural use (Yes/No)<br />

- Does the estimate include treaty water deliveries (Yes/No)<br />

- Does the estimate include hydropower generation benefits (Yes/No)<br />

- Does the estimate include flood damage reduction benefits (Yes/No)<br />

- Does the estimate include inland navigation benefits (Yes/No)<br />

- Does the estimate include recreation benefits (Yes/No)<br />

- Does the estimate include fish and wildlife benefits (Yes/No)<br />

Appendix B: <strong>Consequence</strong>-<strong>Based</strong> <strong>Top</strong> <strong>Screen</strong> Worksheets 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!