Dams Sector Consequence-Based Top Screen Methodology
Dams Sector Consequence-Based Top Screen Methodology
Dams Sector Consequence-Based Top Screen Methodology
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• If available, provide the estimated value of E 2 .<br />
• Provide a short description of how the total remediation costs (E 2 ) were estimated. Please<br />
identify relevant data sources and reference materials (if applicable, include title, author,<br />
date, and/or version of any report, study and/or data source used as reference).<br />
- Does the estimate include downstream property damages (Yes/No)<br />
- Does the estimate include environmental damages (Yes/No)<br />
- Does the estimate include temporary remediation measures (Yes/No)<br />
- Does the estimate include emergency response costs (Yes/No)<br />
Assuming a reasonable worst case scenario, provide an approximated estimate for the<br />
corresponding “Business Interruption Costs” over a period of 12 months after the incident or<br />
event by selecting the appropriate range from the table below.<br />
First-Year Business Interruption Costs, E 3<br />
Level<br />
E 3 (Millions of Dollars/Year)<br />
1 E 3 > 800<br />
2 400 < E 3 ≤ 800<br />
3 200 < E 3 ≤ 400<br />
4 100 < E 3 ≤ 200<br />
5 50 < E 3 ≤ 100<br />
6 25 < E 3 ≤ 50<br />
7 0 < E 3 ≤ 25<br />
8 E 3 = 0<br />
• If available, provide the estimated value of E 3 .<br />
• Provide a short description of how the business interruption costs (E 3 ) were estimated.<br />
Please identify relevant data sources and reference materials (if applicable, include title,<br />
author, date, and/or version of any report, study and/or data source used as reference).<br />
- Does the estimate include water deliveries for municipal and industrial use (Yes/No)<br />
- Does the estimate include water deliveries for agricultural use (Yes/No)<br />
- Does the estimate include treaty water deliveries (Yes/No)<br />
- Does the estimate include hydropower generation benefits (Yes/No)<br />
- Does the estimate include flood damage reduction benefits (Yes/No)<br />
- Does the estimate include inland navigation benefits (Yes/No)<br />
- Does the estimate include recreation benefits (Yes/No)<br />
- Does the estimate include fish and wildlife benefits (Yes/No)<br />
Appendix B: <strong>Consequence</strong>-<strong>Based</strong> <strong>Top</strong> <strong>Screen</strong> Worksheets 31