This operation was supported by the Statutory City of <strong>Ostrava</strong> in <strong>2009</strong> by allocating a capital grant amounting<br />

to 8.1 million CZK. Because the central area of the zoo has been lacking social facilities for visitors over the<br />

long time, a decision was made to enlarge the scope of the works by constructing new-style toilets accessible<br />

to physically challenged visitors as well. <strong>The</strong> total amount needed for this action makes approximately 13.9<br />

million. <strong>The</strong> new children's zoo will be made available to the public as early as 2010.<br />

Other worth-mentioning updates throughout the zoo grounds namely include the following:<br />

• A part of the front barriers within the lion and leopard exhibits replaced, allowing the visitors viewing the<br />

feline carnivores in a more attractive manner - covered from an SCO's grant amounting to 225 thousand<br />

CZK;<br />

• Fencing and top of the indoor and outdoor facilities for the jaguarundi and Eurasian lynx at the small feline<br />

house redesigned - co-funded by an SCO's grant and zoo resources, a total of 66 thousand CZK spent;<br />

• Existing cages and animal management installations in the room #2 and #3 at the animal separating<br />

facility behind the scenes fully repaired - costs of 235 thousand CZK funded from zoo resources;<br />

• Gates at the elephant house repaired and modified as part of the preparation for arrival of the new male<br />

elephant - total costs of 2,641 thousand co-funded from the SCO's grant (1,079 thousand CZK) and zoo<br />

resources (the remainder);<br />

• Aviaries designed for bird breeding behind the scenes rebuilt with total costs of 324 thousand CZK covered<br />

from the SCO's grant;<br />

• Outdoor cages in breeding facilities behind the scenes completely rebuilt - covered from the SCO's grant of<br />

93 thousand CZK;<br />

• Fencing, shelter, a part of the outer shell and water supply mains of a stall behind the scenes fully repaired<br />

- total costs of 1,184 thousand CZK co-funded from the SCO's grant (700 thousand) and zoo resources (484<br />

thousand).<br />

Capital projects with expected start of implementation in 2010:<br />

• <strong>The</strong> hippo house rebuilding project will be launched and also finished to a great extent. <strong>The</strong> project aims<br />

to improve thermal conditions for the animals housed, provide better environment for visitors by reducing<br />

the excessive odour indoors, and cut the extreme energy costs. <strong>The</strong> project covers replacement of the roof,<br />

which is in the state of disrepair; in addition, the entrance gate and a part of the building envelope lacking<br />

the heat insulation will be replaced, insulation of the house renewed, etc. Essential parts of the works<br />

will include converting the heating system of the facility as such by replacing electricity as the source of<br />

heating by renewable sources of energy, namely wooden pellets, and implementing at least a simple water<br />

filtering system in the hippo pool. All of the measures above will make the operation of this animal and<br />

visitor complex providing housing for the <strong>Ostrava</strong> <strong>Zoo</strong>’s flagship species much more cost-effective and<br />

efficient, thus contributing to saving water, energy and human work to a great extent. <strong>The</strong> total project<br />

implementation costs will amount to some 36,500 thousand CZK. Within the project, an application<br />

seeking funding under the EEA/Norwegian Financial Mechanism amounting to about 17,500 thousand CZK<br />

was approved, with the remainder of 19,000 thousand expected to come from within the SCO's capital<br />

grant.<br />

• A capital operation named Mud removal and re-arrangement of the fish pond #1 at <strong>Ostrava</strong><br />