This operation was supported by the Statutory City of <strong>Ostrava</strong> in <strong>2009</strong> by allocating a capital grant amounting<br />
to 8.1 million CZK. Because the central area of the zoo has been lacking social facilities for visitors over the<br />
long time, a decision was made to enlarge the scope of the works by constructing new-style toilets accessible<br />
to physically challenged visitors as well. <strong>The</strong> total amount needed for this action makes approximately 13.9<br />
million. <strong>The</strong> new children's zoo will be made available to the public as early as 2010.<br />
Other worth-mentioning updates throughout the zoo grounds namely include the following:<br />
• A part of the front barriers within the lion and leopard exhibits replaced, allowing the visitors viewing the<br />
feline carnivores in a more attractive manner - covered from an SCO's grant amounting to 225 thousand<br />
CZK;<br />
• Fencing and top of the indoor and outdoor facilities for the jaguarundi and Eurasian lynx at the small feline<br />
house redesigned - co-funded by an SCO's grant and zoo resources, a total of 66 thousand CZK spent;<br />
• Existing cages and animal management installations in the room #2 and #3 at the animal separating<br />
facility behind the scenes fully repaired - costs of 235 thousand CZK funded from zoo resources;<br />
• Gates at the elephant house repaired and modified as part of the preparation for arrival of the new male<br />
elephant - total costs of 2,641 thousand co-funded from the SCO's grant (1,079 thousand CZK) and zoo<br />
resources (the remainder);<br />
• Aviaries designed for bird breeding behind the scenes rebuilt with total costs of 324 thousand CZK covered<br />
from the SCO's grant;<br />
• Outdoor cages in breeding facilities behind the scenes completely rebuilt - covered from the SCO's grant of<br />
93 thousand CZK;<br />
• Fencing, shelter, a part of the outer shell and water supply mains of a stall behind the scenes fully repaired<br />
- total costs of 1,184 thousand CZK co-funded from the SCO's grant (700 thousand) and zoo resources (484<br />
thousand).<br />
Capital projects with expected start of implementation in 2010:<br />
• <strong>The</strong> hippo house rebuilding project will be launched and also finished to a great extent. <strong>The</strong> project aims<br />
to improve thermal conditions for the animals housed, provide better environment for visitors by reducing<br />
the excessive odour indoors, and cut the extreme energy costs. <strong>The</strong> project covers replacement of the roof,<br />
which is in the state of disrepair; in addition, the entrance gate and a part of the building envelope lacking<br />
the heat insulation will be replaced, insulation of the house renewed, etc. Essential parts of the works<br />
will include converting the heating system of the facility as such by replacing electricity as the source of<br />
heating by renewable sources of energy, namely wooden pellets, and implementing at least a simple water<br />
filtering system in the hippo pool. All of the measures above will make the operation of this animal and<br />
visitor complex providing housing for the <strong>Ostrava</strong> <strong>Zoo</strong>’s flagship species much more cost-effective and<br />
efficient, thus contributing to saving water, energy and human work to a great extent. <strong>The</strong> total project<br />
implementation costs will amount to some 36,500 thousand CZK. Within the project, an application<br />
seeking funding under the EEA/Norwegian Financial Mechanism amounting to about 17,500 thousand CZK<br />
was approved, with the remainder of 19,000 thousand expected to come from within the SCO's capital<br />
grant.<br />
• A capital operation named Mud removal and re-arrangement of the fish pond #1 at <strong>Ostrava</strong><br />
25