<strong>Ostrava</strong> <strong>Zoo</strong> – the zoo office and main entrance<br />

<strong>The</strong> development period for the project documentation funded by the SCO’s grant is <strong>2009</strong> and 2010, with costs<br />

estimated to exceed CZK 3 million including VAT. <strong>The</strong> final price will be specified based on a public tender. <strong>The</strong><br />

existing main entrance and zoo office had failed to comply with the recent needs of the zoo operations a long<br />

ago. <strong>The</strong> technical conditions and spatial arrangements of the main entrance are insufficient for handling<br />

the recent visitor numbers in a cultivated manner. <strong>The</strong> set of interconnected portable cabins looking like<br />

a construction site that forms the <strong>Ostrava</strong> <strong>Zoo</strong>’s headquarters was designed to serve as a temporary facility in<br />

1960s, and is now about to reach its service life. It is unsatisfactory in terms of space; what's worse, the energy<br />

demand of the facility is enormous. <strong>The</strong> shortage of places in the visitor car park is another critical issue. <strong>The</strong>re<br />

are no facilities for holding presentations and lectures. To address not only the operational issues, but also<br />

to gain a new attractive area in the zoo grounds by clearing the existing operational building, a decision was<br />

made that both planned facilities would be constructed in place of the existing main entrance structures and<br />

interconnected in terms of operations. <strong>The</strong> project also covers a car park in front of the entrance, with 136<br />

visitor car sites to be set up in the territory near the entrance, with some of them now already in use. <strong>The</strong><br />

service building will be a two-storey facility containing offices, service entrance, cash offices, social facilities<br />

for the horticulture department members (i.e. gardeners) and offices for other departments of the zoo.<br />

Facilities will include a staff meeting room, presentation room including the background premises, a large<br />

zoo store and visitor toilets (including those for physically challenged) and a room for mothers with babies. In<br />

<strong>2009</strong>, the building permit design documentation was finished.<br />