A <strong>Closer</strong> <strong>Look</strong> <strong>at</strong> <strong>Prevailing</strong> <strong>Civil</strong> <strong>Engineering</strong> <strong>Practice</strong>, Wh<strong>at</strong>, Why and How<br />

Vincent T. H. CHU<br />

9. Wh<strong>at</strong> is the significance of free length and fixed length in tiebacks<br />

in anchored excav<strong>at</strong>ion<br />

The use of tiebacks in deep excav<strong>at</strong>ion allows uninterrupted earth moving<br />

within the excav<strong>at</strong>ion zone owing to the absence of interior obstructions.<br />

The spacing of tieback should not be placed too close as this may impair<br />

the capacity of tieback because of the interference between adjacent<br />

grouted zones.<br />

A tieback is made first by drilling a hole by a drill rig, followed by placing a<br />

bar in the drilled hole. Concrete is then poured in the hole and the<br />

connection of tieback with wall is made lastly. A tieback anchor consists of<br />

an anchorage loc<strong>at</strong>ed in a bearing layer and the anchor is tensioned <strong>at</strong> the<br />

front face of the wall. The portion of the anchor which transmits the force to<br />

the surrounding soil is called the "fixed length". One the other hand, the<br />

"free length" of tieback transfers the force from the fixed length through the<br />

anchor head to the wall.<br />

Fig. 7.1 Free length and fixed length in tieback<br />

10. Wh<strong>at</strong> is the typical proportioning of a retaining wall<br />

The base slab thickness of a cantilever retaining wall is about 10% of the<br />

total height of retaining wall. The length of base slab is about 50-70% of the<br />

total height of retaining wall. Generally speaking, the thickness of wall<br />

stems may vary along the stem provided th<strong>at</strong> its size should not be less<br />

than 300mm to facilit<strong>at</strong>e concrete placement.<br />

For retaining wall with a total height exceeding 8-12m, it is recommended<br />

to adopt counterfort retaining wall. The counterforts in counterfort retaining<br />

wall are normally spaced <strong>at</strong> about 30% to 70% of the total height. The<br />

length of base slab is about 40-70% of the total height of retaining wall.<br />