<strong>Dakshin</strong> <strong>Gujarat</strong> <strong>Vij</strong> <strong>Company</strong> <strong>Limited</strong><br />

Truing up for FY 2010-11<br />

and Determination of Tariff for FY 2012-13<br />

Response of the Licensee: The licensee stated that provision of “Unauthorized Use<br />

of energy” are applied only when provisions of section 126 are attracted and the<br />

issue is dealt with according to the provisions of Act and Regulations.<br />

Commission’s View: The objection and the response are noted.<br />

30. Release of Additional Demand to the consumers<br />

Objection: One of the objectors has pointed out that the DISCOMs are using<br />

improper methods for releasing additional load to the consumers. It is stated that the<br />

capacity of distribution transformer is decided based on the connected load on<br />

records of the licensee and not by the maximum demand recorded by the meter<br />

installed on the distribution transformer. Further, the objector has stated that the MD<br />

governed tariff is more scientific and should be used.<br />

Response of the Licensee: The licensee has stated that under the “Connected<br />

Load Base Tariff” consumer can connect as many load as contracted and can utilize<br />

load within his contracted demand. It may happen that at any instance consumers<br />

connected on any Distribution Transformer may be utilizing the lower load than<br />

contracted, but it may be an instantaneous instance. Further, a company, in normal<br />

condition, cannot restrict any consumer from utilizing the load within his contracted<br />

capacity, therefore, while working out technical feasibility for any new consumer or<br />

for load extension of existing consumer, up to the Distribution Transformer level i.e.<br />

LT Line and Distribution Transformer level, connected load is taken into account.<br />

Commission’s View: The objection and the response are noted.<br />

31. Procurement of poor quality material<br />

Objection: Discoms pay more money and buys low quality materials like poles,<br />

meters, transformers, etc. A proper transparent mechanism should be built for<br />

procurement of materials.<br />

Response of the Licensee: Good quality and ISI approved materials are procured<br />

and checked at ERDA at regular interval.<br />

Commission’s View: The objection and the response are noted.<br />