<strong>Dakshin</strong> <strong>Gujarat</strong> <strong>Vij</strong> <strong>Company</strong> <strong>Limited</strong><br />

Truing up for FY 2010-11<br />

and Determination of Tariff for FY 2012-13<br />

Particulars<br />

Table 4.3: Distribution losses considered for truing up for FY 2010-11<br />

FY 2010-11<br />

(Approved<br />

in MYT<br />

Order)<br />

FY 2010-11<br />

(Considered<br />

in Tariff<br />

Order)<br />

FY 2010-11<br />

(Actual)<br />

(%)<br />

FY 2010-11<br />

(Considered<br />

in True up)<br />

Distribution losses 12.45 12.45 11.96 12.45<br />

4.3 Energy requirement<br />

Licensee’s submission<br />

DGVCL has submitted the energy requirement for FY 2010-11 based on the actual<br />

energy sales and the actual distribution losses for FY 2010-11. The following table<br />

summarizes the energy requirement of DGVCL for FY 2010-11.<br />

Table 4.4: Energy requirement and Energy balance as submitted by DGVCL for FY 2010-11<br />

Sl.<br />

<strong>No</strong>.<br />

Particulars<br />

Unit<br />

FY 2010-11<br />

(Approved<br />

in Tariff<br />

Order)<br />

FY 2010-11<br />

(Submitted in<br />

Truing up)<br />

1. Energy sales MU 9761 9837<br />

2. Distribution losses<br />

MU 1388 1336<br />

% 12.45 11.96<br />

3. Energy requirement MU 11149 11173<br />

4. Transmission losses<br />

MU 489 480<br />

% 4.20 4.12<br />

5.<br />

6.<br />

Total energy to be input to<br />

transmission system<br />

Pooled losses in PGCIL<br />

system<br />

MU 11638 11653<br />

MU 151 51<br />

7. Total energy requirement MU 11789 11704<br />

Commission’s Analysis<br />

The DGVCL has computed the energy requirement based on the actual distribution<br />

losses of 11.96%, actual energy sales of 9837MU and transmission losses of<br />

4.12%.It can be seen from the table given above that the distribution losses and the<br />

transmission losses are lower than that of approved in the Tariff Order.<br />

<strong>Gujarat</strong> Electricity Regulatory Commission Page 36<br />