09.01.2015 Views

Supaul Bihar Annual District Plan 2011-12 - nrcddp

Supaul Bihar Annual District Plan 2011-12 - nrcddp

Supaul Bihar Annual District Plan 2011-12 - nrcddp

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DISTRICT PLANNING<br />

DISTRICT PLANNING PROCESS:<br />

To understand the key issues of the district, constraints associated in the way of greater output realisation and<br />

to capture the plan requirements, a consultative meeting was organised at district level involving government officials<br />

from different departments, <strong>Supaul</strong> Comprehensive <strong>District</strong> <strong>Plan</strong>, 201011, <strong>District</strong> Administration, <strong>Supaul</strong>. Abrief<br />

presentation was made before the members in the context of the district planning, key information requirements for<br />

planning and overall strategy to be adopted in the process. Members discussed on the present district situation<br />

from different development context. Various issues of the district were discussed and presented by members<br />

during the open house session. Their suggestions were taken in to consideration and incorporated in the overall<br />

design for preparing the district plan. The draft district plan presented and discussed at length in the <strong>District</strong><br />

<strong>Plan</strong>ning Committee and finally ratified by the same to get it submitted at state.<br />

DISTRICT CONSULTATION WORKSHOP :<br />

To understand the key issues of the district, constraints associated in the way of greater output realization and<br />

to capture the plan requirements, a consultative meeting was organized at district level involving government officials<br />

from different departments and DPC members etc. Abrief presentation was made before the members in the<br />

context of the district planning, key information requirements for planning and overall strategy to be adopted in the<br />

process. Members discussed on the present district situation from different development context. Various issues of<br />

the district were discussed and presented by members during the open house session. Their suggestions were<br />

taken into consideration and incorporated in the overall design for preparing the district plan.<br />

TOOLS AND TECHNIQUES :<br />

To capture relevant information from departments, structured formats were developed with reference to the<br />

district planning manual and planning guideline of <strong>Plan</strong>ning and Development Department, Government of <strong>Bihar</strong>.<br />

A total of 33 formats by department / sector / sub sector were designed for information collection and plan<br />

facilitation. Each sector / area format has five major sections i.e.<br />

1. Present district situation / status by sector / department [indicator based]<br />

2. Present Vs Expected status by the end of the plan period<br />

3. Key issues of <strong>District</strong> by sector / sub sector<br />

4. <strong>Plan</strong>ning by identified issues and its phasing by plan period.<br />

5. Financial requirement by sector / sub sector to deal with the issue<br />

COLLECTION OF BASIC DATA FOR PLANNING :<br />

Required data were gathered from respective government departments in the specified formats through<br />

consultation. The methodology adopted for data collection was like meeting with government officials / line<br />

department personnel, verification of existing records at different forums like ZP etc. Apart from this, available<br />

secondary literatures were reviewed for making the plan a realistic and comprehensive. Different previous research<br />

studies were referred to for the analysis of development trend, initiated measures and persisting gaps with regard to<br />

district development.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!