HPC-NNBOSL-U0-000-RES-000034 Version 2.0<br />

<strong>PSA</strong> <strong>of</strong> <strong>Accidents</strong> <strong>in</strong> <strong>the</strong> <strong>Spent</strong> <strong>Fuel</strong> <strong>Pool</strong><br />

NOT PROTECTIVELY MARKED<br />

The probability that <strong>the</strong> third PTR [FPCS] tra<strong>in</strong> is required at <strong>the</strong> same time as <strong>the</strong> EVU<br />

[CHRS] dur<strong>in</strong>g accident situations must be taken <strong>in</strong>to account for <strong>the</strong> situations <strong>in</strong>volv<strong>in</strong>g<br />

a loss <strong>of</strong> PTR [FPCS].<br />

In <strong>the</strong> light <strong>of</strong> <strong>the</strong> particular characteristics <strong>of</strong> <strong>the</strong> comb<strong>in</strong>ed scenarios 7 , an evaluation <strong>of</strong><br />

<strong>the</strong> <strong>in</strong>crease <strong>in</strong> <strong>the</strong> risk <strong>of</strong> reach<strong>in</strong>g boil<strong>in</strong>g and Unacceptable Consequences <strong>in</strong> <strong>the</strong> pool<br />

is carried out, assum<strong>in</strong>g that priority is always given to <strong>the</strong> EVU [CHRS] and that <strong>the</strong><br />

third tra<strong>in</strong> is deliberately deprived <strong>of</strong> heat s<strong>in</strong>k <strong>in</strong> core accidents.<br />

This evaluation shows that <strong>the</strong> impact on <strong>the</strong> risk is not significant (AS-0017).<br />

4.4.4 Results<br />

4.4.4.1 Overall Boil<strong>in</strong>g and <strong>Fuel</strong> Damage Frequency<br />

Boil<strong>in</strong>g follow<strong>in</strong>g <strong>the</strong> loss <strong>of</strong> cool<strong>in</strong>g <strong>of</strong> <strong>the</strong> <strong>Spent</strong> <strong>Fuel</strong> <strong>Pool</strong> may result from <strong>the</strong> follow<strong>in</strong>g<br />

<strong>in</strong>itiat<strong>in</strong>g events:<br />

Initiat<strong>in</strong>g Event<br />

Loss <strong>of</strong> PTR [FPCS] pump<br />

Loss <strong>of</strong> electrical supply<br />

Loss <strong>of</strong> Offsite Power (24h)<br />

Loss <strong>of</strong> PTR [FPCS] header<br />

Loss <strong>of</strong> Cool<strong>in</strong>g Cha<strong>in</strong><br />

Loss <strong>of</strong> Ultimate Heat S<strong>in</strong>k<br />

Boil<strong>in</strong>g<br />

/r.y<br />

7.23E-05<br />

8.48E-06<br />

1.17E-05<br />

2.20E-07<br />

1.96E-04<br />

9.45E-07<br />

Total (boil<strong>in</strong>g) 2.90 E-04<br />

The distribution <strong>of</strong> <strong>the</strong> risk <strong>of</strong> boil<strong>in</strong>g by <strong>in</strong>itiat<strong>in</strong>g event is shown below:<br />

7<br />

The IRWST cannot be used as a makeup device for <strong>the</strong> PTR [FPPS/FPCS] dur<strong>in</strong>g core accidents as <strong>the</strong> water is needed to manage<br />

<strong>the</strong> accident <strong>in</strong> <strong>the</strong> reactor build<strong>in</strong>g.<br />

UNCONTROLLED WHEN PRINTED<br />

NOT PROTECTIVELY MARKED<br />

Page 18 <strong>of</strong> 37