11.01.2015 Views

PSA of Accidents in the Spent Fuel Pool - EDF Hinkley Point

PSA of Accidents in the Spent Fuel Pool - EDF Hinkley Point

PSA of Accidents in the Spent Fuel Pool - EDF Hinkley Point

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HPC-NNBOSL-U0-000-RES-000034 Version 2.0<br />

<strong>PSA</strong> <strong>of</strong> <strong>Accidents</strong> <strong>in</strong> <strong>the</strong> <strong>Spent</strong> <strong>Fuel</strong> <strong>Pool</strong><br />

NOT PROTECTIVELY MARKED<br />

4.4.4.8.2 <strong>Fuel</strong> Damage<br />

The follow<strong>in</strong>g table lists <strong>the</strong> ma<strong>in</strong> <strong>Spent</strong> <strong>Fuel</strong> <strong>Pool</strong> accident sequences due to accidents<br />

lead<strong>in</strong>g to fuel damage, <strong>in</strong> all reactor states. They represent around 75% <strong>of</strong> <strong>the</strong> overall<br />

risk <strong>of</strong> fuel damage <strong>in</strong> <strong>the</strong> <strong>Spent</strong> <strong>Fuel</strong> <strong>Pool</strong> (for non dra<strong>in</strong><strong>in</strong>g events).<br />

Initiat<strong>in</strong>g Event Description Freq.<br />

(/r.y)<br />

%<br />

Long Loss <strong>of</strong> Offsite<br />

Power <strong>in</strong> state AB<br />

(<strong>in</strong>clud<strong>in</strong>g consequential<br />

LOOP)<br />

Loss <strong>of</strong> Offsite Power <strong>in</strong><br />

Refuell<strong>in</strong>g state<br />

Long Loss <strong>of</strong> Offsite<br />

Power <strong>in</strong> state AB<br />

(<strong>in</strong>clud<strong>in</strong>g consequential<br />

LOOP)<br />

Loss <strong>of</strong> Offsite Power <strong>in</strong><br />

Refuell<strong>in</strong>g state<br />

Loss <strong>of</strong> Cool<strong>in</strong>g Cha<strong>in</strong> <strong>in</strong><br />

state AB<br />

Loss <strong>of</strong> Cool<strong>in</strong>g Cha<strong>in</strong> <strong>in</strong><br />

Refuell<strong>in</strong>g state<br />

Loss <strong>of</strong> Offsite Power <strong>in</strong><br />

Refuell<strong>in</strong>g state<br />

Loss <strong>of</strong> PTR [FPCS]<br />

pump <strong>in</strong> state AB<br />

Loss <strong>of</strong> Cool<strong>in</strong>g Cha<strong>in</strong> <strong>in</strong><br />

state AB<br />

Failure <strong>of</strong> fuel pool cool<strong>in</strong>g due to failure <strong>of</strong><br />

emergency electrical supply and/or preventative<br />

ma<strong>in</strong>tenance and failure <strong>of</strong> makeup us<strong>in</strong>g backup<br />

equipment and failure to repair <strong>the</strong> failed<br />

components before 107h.<br />

Failure <strong>of</strong> <strong>the</strong> SPPA-T2000 platform and <strong>the</strong><br />

operator fails to carry out a local action to <strong>in</strong>itiate<br />

<strong>the</strong> stand-by pump before 97°C and failure <strong>of</strong><br />

makeup us<strong>in</strong>g backup equipment and failure to<br />

repair <strong>the</strong> failed components before 33 hours.<br />

Failure <strong>of</strong> <strong>the</strong> SPPA-T2000 platform and <strong>the</strong><br />

operator fails to carry out a local action to <strong>in</strong>itiate<br />

<strong>the</strong> stand-by pump before 97°C and failure <strong>of</strong><br />

makeup us<strong>in</strong>g backup equipment and failure to<br />

repair <strong>the</strong> failed components before 107 hours.<br />

Failure <strong>of</strong> fuel pool cool<strong>in</strong>g due to failure <strong>of</strong><br />

emergency electrical supply and/or preventative<br />

ma<strong>in</strong>tenance and failure <strong>of</strong> makeup us<strong>in</strong>g backup<br />

equipment and failure to repair <strong>the</strong> failed<br />

components before 33 hours.<br />

Failure <strong>of</strong> <strong>the</strong> SPPA-T2000 platform and <strong>the</strong><br />

operator fails to carry out a local action to <strong>in</strong>itiate<br />

<strong>the</strong> stand-by pump before 97°C and <strong>the</strong> operator<br />

fails to <strong>in</strong>itiate makeup <strong>of</strong> <strong>the</strong> fuel pool and failure<br />

to repair <strong>the</strong> failed components before 107 hours.<br />

Failure <strong>of</strong> <strong>the</strong> third PTR [FPCS] tra<strong>in</strong> (cool<strong>in</strong>g<br />

cha<strong>in</strong> or <strong>in</strong>tr<strong>in</strong>sic) and failure <strong>of</strong> <strong>the</strong> operator to<br />

<strong>in</strong>itiate <strong>the</strong> makeup equipment and failure to repair<br />

failed components before 33 hours.<br />

Failure <strong>of</strong> <strong>the</strong> operator to <strong>in</strong>itiate <strong>the</strong> stand-by<br />

pump before 97°C and failure <strong>of</strong> makeup us<strong>in</strong>g<br />

backup equipment and failure to repair <strong>the</strong> failed<br />

components before 33 hours.<br />

Failure <strong>of</strong> <strong>the</strong> SPPA-T2000 platform and <strong>the</strong><br />

operator fails to carry out a local action to <strong>in</strong>itiate<br />

<strong>the</strong> stand-by pump before 97°C and <strong>the</strong> operator<br />

fails to <strong>in</strong>itiate makeup <strong>of</strong> <strong>the</strong> fuel pool and failure<br />

to repair <strong>the</strong> failed components before 107 hours.<br />

Failure <strong>of</strong> <strong>the</strong> SPPA-T2000 platform and <strong>the</strong><br />

operator fails <strong>the</strong> local action to <strong>in</strong>itiate <strong>the</strong> standby<br />

pump before 97°C and failure <strong>of</strong> makeup <strong>of</strong><br />

<strong>the</strong> fuel pool due to failure <strong>of</strong> normal and backup<br />

equipment and failure to repair <strong>the</strong> failed<br />

components before 107 hours.<br />

1.00E-10 18.9<br />

9.66E-11 18.2<br />

5.62E-11 10.6<br />

5.22E-11 9.8<br />

3.06E-11 5.8<br />

2.15E-11 4.0<br />

1,93E-11 3.6<br />

1.07E-11 2.0<br />

9.2E-12 1.7<br />

UNCONTROLLED WHEN PRINTED<br />

NOT PROTECTIVELY MARKED<br />

Page 24 <strong>of</strong> 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!