CGA ENGINEERING - Canadian Gas Association
CGA ENGINEERING - Canadian Gas Association
CGA ENGINEERING - Canadian Gas Association
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>CGA</strong> <strong>ENGINEERING</strong><br />
C O N F E R E N C E<br />
2012<br />
PROGRAM<br />
Lynden - Asset Management<br />
12) Performance Criteria - Municipal<br />
and Public Utility Requirements<br />
Recent investments for infrastructures led many<br />
municipalities to look closer at utility companies<br />
operations for better coordination in ROW. Despite of<br />
the engineering and project management staff expertise,<br />
utilities are often compelled to use municipal technical<br />
specifications for cuts reinstatement. Those requirements<br />
have significant financial and logistic impacts. Though<br />
municipal concerns are relevant, performance criteria,<br />
have to be defined. Most municipal specifications<br />
focus on reinstatement techniques but are silent on<br />
performance requirements. It is in this context that<br />
Gaz Métro developed a methodology to assess the<br />
performance of its reinstated cuts based on the<br />
principles of typical pavement management processes.<br />
A case study will illustrate the concept and the<br />
application of this innovative methodology.<br />
Pierre Lefèvre, Manager, Engineering Department,<br />
Gaz Metro<br />
11:30 am - 1:00 pm Bristol AB<br />
Lunch & Exhibition<br />
1:00 - 2:00 pm Stream Selection (select one)<br />
Kensington One - Technical<br />
13) <strong>CGA</strong> Biomethane Guidelines<br />
A <strong>CGA</strong> TF has created a Guideline for the Introduction<br />
of Biomethane into Existing Natural <strong>Gas</strong> Distribution &<br />
Transmission Systems. This plenary will present those<br />
guidelines including a Project Approach Model, a<br />
Verification Program & general definitions & information<br />
concerning biomethane interchangeability & transmission<br />
& distribution system component performance.<br />
Dana Engler, TransCanada<br />
Kensington Two - Technology<br />
14) Horizontal Directional Drilling<br />
Using Intercept Method<br />
An 800m HDD installation beneath the Lawrence River was<br />
performed using the intercept method. The project was<br />
executed in order to replace a bridge mounted pipeline on<br />
the North Channel Bridge in Cornwall On. The pipeline is<br />
the primary supply to St. Lawrence <strong>Gas</strong> in New York State,<br />
an affiliate company of Enbridge <strong>Gas</strong> Distribution. In order<br />
to accommodate the construction timeline of a new bridge<br />
it was necessary to expedite the crossing. The project also<br />
involved liaising with local stakeholders, First Nations and<br />
federal authorities. The presentation will speak to the<br />
complexities, technology, timeline and lessons learned<br />
from the project.<br />
Michael Tozer, P.Eng, Enbridge <strong>Gas</strong> Distribution<br />
Manchester - People<br />
15) Mentorship and Engineering<br />
Professional Development Program<br />
at Enbridge<br />
At Enbridge mentorship is one of the many ways we<br />
invest in supporting their success of our people. During<br />
this session, attendees will see how our mentorship<br />
program accelerates professional learning and fosters<br />
continued growth by providing a unique and valuable<br />
opportunity for employees at all levels to learn through<br />
relationships; one of the four pillars of our Leadership<br />
and Employee Development Framework. Details of<br />
Enbridge’s Engineering and Professional Development<br />
Program for new engineers will also be provided.<br />
Marilyn Wilson, Human Resources Organizational<br />
Effectiveness Lead, Enbridge <strong>Gas</strong> Distribution<br />
Chris Moore, Manager, Engineering Construction<br />
and Maintenance, Enbridge <strong>Gas</strong> Distribution<br />
Lynden - Asset Management<br />
16) CSA Z662 - 11<br />
A review and perspective of the CSA Z662 - 11 code<br />
additions for the 2011 year issue as it pertains to<br />
natural gas distribution companies. What is new<br />
and where is the code going in the future.<br />
Dave Petursson, Manager, Distribution<br />
Standards Department, Manitoba Hydro