A Guide to the New - Building Commission
A Guide to the New - Building Commission
A Guide to the New - Building Commission
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Checking Applications<br />
When accepting applications for a building permit, a permit authority must check <strong>the</strong><br />
following, as outlined in section 16 and section 20 of <strong>the</strong> <strong>Building</strong> Act.<br />
Section 16<br />
<strong>Building</strong> Permit Application: Certified and Uncertified<br />
Section 16: Making an Application<br />
Section Requirement Explanation<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
Must be made in an approved<br />
manner and form. The form must be<br />
filled out completely and correctly.<br />
Must name, and be signed by, each<br />
owner of <strong>the</strong> land on which <strong>the</strong><br />
building or incidental structure is <strong>to</strong><br />
be located.<br />
Must name, and be signed by, <strong>the</strong><br />
person who proposes <strong>to</strong> be named<br />
as <strong>the</strong> builder on <strong>the</strong> building permit,<br />
or <strong>the</strong> demolition contrac<strong>to</strong>r on <strong>the</strong><br />
demolition permit.<br />
Must provide prescribed information<br />
about <strong>the</strong> building or incidental<br />
structure and <strong>the</strong> persons mentioned<br />
in paragraph (b) or (c).<br />
Available at:<br />
www.buildingcommission.wa.gov.au.<br />
An agent or at<strong>to</strong>rney can sign on<br />
behalf of an owner. The Permit<br />
Authority can ask for proof of <strong>the</strong><br />
agreement that an agent can sign<br />
for <strong>the</strong> owner.<br />
If <strong>the</strong> builder or demolition contrac<strong>to</strong>r<br />
is a corporation <strong>the</strong> application can<br />
be signed by an officer or agent of<br />
<strong>the</strong> corporation.<br />
If an owner-builder, approval from<br />
<strong>the</strong> <strong>Building</strong> Services Board must be<br />
attached <strong>to</strong> <strong>the</strong> application.<br />
The prescribed information is<br />
contained in <strong>the</strong> application form<br />
(which is why it is important for <strong>the</strong><br />
form <strong>to</strong> be filled out completely and<br />
correctly). The following is listed in<br />
<strong>the</strong> regulations and is in addition <strong>to</strong><br />
(b) and (c):<br />
Address of <strong>the</strong> property on<br />
which <strong>the</strong> building or incidental<br />
structure will be (or is) located;<br />
The intended use of <strong>the</strong><br />
building/structure;<br />
The postal address of <strong>the</strong><br />
builder/demolition contrac<strong>to</strong>r;<br />
Contact details of <strong>the</strong><br />
builder/demolition contrac<strong>to</strong>r;<br />
The registration number of <strong>the</strong><br />
person as a building services<br />
contrac<strong>to</strong>r, or <strong>the</strong> number of <strong>the</strong><br />
owner-builder approval given by<br />
<strong>the</strong> <strong>Building</strong> Services Board;<br />
17