Demolition Permit - s15 and s21<br />
An application for a demolition permit can be made for an entire building or for an<br />
incidental structure and may apply <strong>to</strong> one or more stages of demolition ra<strong>the</strong>r than<br />
for <strong>the</strong> entire building.<br />
The application should be considered as an uncertified application, as it will not be<br />
lodged with <strong>the</strong> permit authority with any prior certification (see table 2). The<br />
timeframe for approving <strong>the</strong> application is prescribed in regulations. The prescribed<br />
time is 25 business days.<br />
Permit authorities can set <strong>the</strong> duration of <strong>the</strong> demolition permit.<br />
The demolition contrac<strong>to</strong>r must be qualified <strong>to</strong> undertake <strong>the</strong> type of demolition that<br />
is being applied for, and all conditions and o<strong>the</strong>r requirements, such as heritage and<br />
provisions for work affecting o<strong>the</strong>r land must be adhered <strong>to</strong>, <strong>to</strong> <strong>the</strong> satisfaction of <strong>the</strong><br />
permit authority before a demolition permit can be issued.<br />
Checking Demolition Permit Applications<br />
When accepting an application for a demolition permit, a permit authority must check<br />
<strong>the</strong> following:<br />
Demolition Permit Application Checklist<br />
This is a list of what is required for a demolition permit application, under section 21<br />
of <strong>the</strong> <strong>Building</strong> Act.<br />
Demolition Permit Application<br />
Section 21: Grant of Demolition Permit<br />
Section Requirement Explanation<br />
1(a)<br />
1(b)<br />
Application completed fully and<br />
correctly as set out in s16 of <strong>the</strong><br />
<strong>Building</strong> Act 2011.<br />
That <strong>the</strong> demolition contrac<strong>to</strong>r has<br />
any authority under ano<strong>the</strong>r written<br />
law <strong>to</strong> do <strong>the</strong> demolition work.<br />
The application form will be available <strong>to</strong><br />
download from <strong>the</strong> <strong>Building</strong> <strong>Commission</strong><br />
website.<br />
If <strong>the</strong>re is any requirement, primarily under <strong>the</strong><br />
Health Act 1911, that <strong>the</strong> demolition contract<br />
has approvals for specialised demolition work<br />
(such as asbes<strong>to</strong>s removal) that this approval is<br />
attached <strong>to</strong> <strong>the</strong> application.<br />