The <strong>New</strong> <strong>Building</strong> Approvals<br />

System<br />

A guide <strong>to</strong> <strong>the</strong> <strong>Building</strong> Act 2011<br />

in Western Australia<br />

<strong>Building</strong> <strong>Commission</strong><br />

Level 1, 31 Troode St<br />

WEST PERTH WA 6005<br />

Ph: 1300 489 099<br />

E: info@buildingcommission.wa.gov.au<br />

W: www.buildingcommission.wa.gov.au<br />

November 2011


Contents<br />

Introduction .............................................................................................................. 1<br />

Permit Authorities (Local Government) ................................................................... 1<br />

Private Sec<strong>to</strong>r Registered <strong>Building</strong> Surveyors ........................................................ 1<br />

Occupancy Requirements ....................................................................................... 2<br />

The <strong>New</strong> Terms - What do <strong>the</strong>y Mean ................................................................... 3<br />

Permit Authority - s124 <strong>to</strong> s127 ............................................................................... 3<br />

Registered <strong>Building</strong> Surveyor - (<strong>Building</strong> Services (Registration) Act) .................... 3<br />

Certified Application - All <strong>Building</strong>s - s14 ................................................................ 3<br />

Uncertified Application - Class 1 & 10 <strong>Building</strong>s - s17 ............................................ 3<br />

<strong>Building</strong> Permit - No building work without a building permit - s9 ............................ 4<br />

Certificate of Design Compliance - s19 ................................................................... 4<br />

Demolition Permit - s15 ........................................................................................... 4<br />

Notice of Completion - s33 ...................................................................................... 4<br />

Occupancy Permit - s40 <strong>to</strong> s65 ............................................................................... 5<br />

<strong>Building</strong> Approval Certificate - s46 <strong>to</strong> s65 ............................................................... 5<br />

Certificate of Construction Compliance - s56 .......................................................... 5<br />

Certificate of <strong>Building</strong> Compliance - s57 ................................................................. 6<br />

The Roles and Responsibilities of a Permit Authority .......................................... 7<br />

Changes for Local Government .............................................................................. 7<br />

The <strong>New</strong> Role of Local Government ....................................................................... 7<br />

Local Government Permit Authorities ..................................................................... 8<br />

Timeframes ........................................................................................................... 10<br />

Levies and Fees .................................................................................................... 10<br />

Repayment of Fees ............................................................................................... 10<br />

Repayment of Levy ............................................................................................... 10<br />

An Overview of <strong>the</strong> <strong>New</strong> <strong>Building</strong> Approvals System ......................................... 11<br />

<strong>Building</strong> Permit Approvals Process – Uncertified Applications .............................. 11<br />

<strong>Building</strong> Permit Approvals Process – Certified Applications.................................. 12<br />

Occupancy Permit/ <strong>Building</strong> Approval Certificate Process ................................ 13<br />

Permits and Certificates ........................................................................................ 14<br />

Applications for a <strong>Building</strong> or Demolition Permit ................................................... 14<br />

Demolition Permit Application Checklist ................................................................ 27<br />

Occupancy Permits and <strong>Building</strong> Approval Certificates – Part 4 ...................... 31<br />

Occupancy Requirements Matrix .......................................................................... 31<br />

Application for Occupancy Permits ....................................................................... 32<br />

Notices .................................................................................................................... 34<br />

Notice of Decision Not <strong>to</strong> Grant a Permit - s24 ..................................................... 34<br />

Notice of Completion - s33 .................................................................................... 34


Notice of Cessation - s34 ...................................................................................... 34<br />

Suspension of <strong>Building</strong> or Demolition Permit - s35 ............................................... 35<br />

Work Affecting O<strong>the</strong>r Land - Part 6 ....................................................................... 35<br />

Notice of Work Affecting O<strong>the</strong>r Land - s85 ............................................................ 36<br />

Obtaining Consent or Court Orders Process - s83 ................................................ 36<br />

Court Orders - s86 ................................................................................................ 37<br />

Encroachment - s76 ............................................................................................... 37<br />

Minor Encroachments ........................................................................................... 37<br />

Crown Land ........................................................................................................... 37<br />

Manda<strong>to</strong>ry Inspections .......................................................................................... 38<br />

Manda<strong>to</strong>ry Inspections Prescribed by <strong>the</strong> Regulations ......................................... 38<br />

Manda<strong>to</strong>ry Inspections Prescribed by <strong>the</strong> <strong>Building</strong> Surveyor ................................ 38<br />

Who is Qualified <strong>to</strong> Inspect ................................................................................. 38<br />

Self Certification or Independent Checking ......................................................... 38<br />

<strong>Building</strong> Information - s128 ................................................................................... 39<br />

Public Access <strong>to</strong> Register of Permits - s128/129 .................................................. 39<br />

Access <strong>to</strong> <strong>Building</strong> Records - s130/131 ................................................................ 39<br />

Providing Information <strong>to</strong> <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>er - s132 .................................. 39<br />

Use of <strong>Building</strong> <strong>Commission</strong> Forms ...................................................................... 40<br />

Delegations - s127 .................................................................................................. 40<br />

Enforcement - Part 8 .............................................................................................. 41<br />

Authorised Persons - s96 ...................................................................................... 41<br />

Enforcement Powers - s100 <strong>to</strong> s105 ..................................................................... 41<br />

Entry Warrant - s106 <strong>to</strong> s109 ................................................................................ 41<br />

<strong>Building</strong> Orders - s110 <strong>to</strong> s118 .............................................................................. 42<br />

Legal Proceedings - Part 12 .................................................................................. 43<br />

Transitional Arrangements - Part 16 ..................................................................... 44<br />

Lodging Applications in <strong>the</strong> Transition Period ....................................................... 44


Introduction<br />

The <strong>Building</strong> Act 2011 replaces much of <strong>the</strong> Local Government (Miscellaneous<br />

Provisions) Act 1960, and amends a range of associated acts. The key objectives of<br />

<strong>the</strong> new Act are:<br />

<strong>to</strong> provide a comprehensive system of building control in Western Australia;<br />

reduce building approval times;<br />

set standards for buildings and demolition work in Western Australia; and<br />

deal with building or demolition work that affects o<strong>the</strong>r land.<br />

The <strong>Building</strong> Act brings some significant changes <strong>to</strong> <strong>the</strong> building approvals process,<br />

from <strong>the</strong> design stage right through <strong>to</strong> occupation of a building. The most important<br />

changes include:<br />

Permit Authorities (Local Government)<br />

Permit authorities issue building, demolition and occupancy permits (and o<strong>the</strong>r<br />

associated certificates, requirements and orders).<br />

The State of Western Australia is a permit authority able <strong>to</strong> issue permits anywhere<br />

in <strong>the</strong> state. Each local government is a permit authority able <strong>to</strong> issue permits within<br />

its local government area. Special permit authorities may be created <strong>to</strong> issue permits<br />

in specific areas or for specific types of buildings.<br />

Private Sec<strong>to</strong>r Registered <strong>Building</strong> Surveyors<br />

The <strong>Building</strong> Act 2011 allows for private sec<strong>to</strong>r registered building surveyors. This<br />

means that an applicant will no longer have <strong>to</strong> go <strong>to</strong> <strong>the</strong> relevant local government <strong>to</strong><br />

obtain <strong>the</strong> services of a registered building surveyor, but will have <strong>the</strong> option <strong>to</strong><br />

engage a registered building surveyor from a private company, or any local<br />

government that offers building surveyor services.<br />

This is similar <strong>to</strong> <strong>the</strong> system in o<strong>the</strong>r states in Australia. It is expected that <strong>the</strong><br />

Western Australian market will gear up <strong>to</strong> offer competitive services, as <strong>the</strong> cus<strong>to</strong>mer<br />

has <strong>the</strong> choice of which building surveyor <strong>to</strong> use.<br />

Local governments, in <strong>the</strong>ir function as a permit authority, have greater freedom <strong>to</strong><br />

provide building surveyor services <strong>to</strong> ratepayers, and can offer building surveyor<br />

services on a commercial basis.<br />

1


Occupancy Requirements<br />

The <strong>Building</strong> Act 2011 will make it an offence <strong>to</strong> occupy a building (o<strong>the</strong>r than class 1<br />

and associated class 10 buildings) without an appropriate occupancy permit. This<br />

will confirm that <strong>the</strong> building has ei<strong>the</strong>r been built according <strong>to</strong> <strong>the</strong> building permit<br />

requirements, in particular <strong>to</strong> <strong>the</strong> certificate of design compliance, or it complies with<br />

<strong>the</strong> relevant building standards.<br />

The permit authority issues an occupancy permit for buildings within its geographical<br />

jurisdiction.<br />

2


The <strong>New</strong> Terms - What do <strong>the</strong>y Mean<br />

(With <strong>Building</strong> Act 2011 section numbers)<br />

Permit Authority - s124 <strong>to</strong> s127<br />

A permit authority is <strong>the</strong> organisation that grants all <strong>the</strong> permits that are required<br />

under <strong>the</strong> new building approval system. It ensures that all statu<strong>to</strong>ry requirements<br />

for <strong>the</strong> lodgement of a permit application are met, and that <strong>the</strong> paperwork is<br />

complete.<br />

It also has responsibility for keeping building records and providing building<br />

information <strong>to</strong> <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>. A permit authority has an enforcement role<br />

and can issue building orders <strong>to</strong> require builders <strong>to</strong> rectify building work that doesn‘t<br />

meet approved requirements.<br />

Registered <strong>Building</strong> Surveyor - (<strong>Building</strong> Services (Registration) Act)<br />

A registered building surveyor can work in ei<strong>the</strong>r <strong>the</strong> private sec<strong>to</strong>r or <strong>the</strong><br />

government sec<strong>to</strong>r. They are registered under <strong>the</strong> <strong>Building</strong> Services (Registration)<br />

Act in one of three tiers. A level 1 building surveyor can certify any building, a level 2<br />

can certify a building no higher than 3 s<strong>to</strong>reys and less than 2000sqm in area and<br />

until 30 June 2013 a building surveyor technician can certify buildings no higher than<br />

2 s<strong>to</strong>reys and no more than 500sqm in area. After 30 June 2013 <strong>the</strong>re will only be<br />

level 1 and 2 building surveyors. They are <strong>the</strong> only ones who can sign a certificate<br />

of design, construction or building compliance.<br />

Certified Application - All <strong>Building</strong>s - s14<br />

A certified application has a certificate of design compliance prepared before <strong>the</strong><br />

application is lodged. The permit authority (normally <strong>the</strong> local government) will <strong>the</strong>n<br />

issue <strong>the</strong> permit within 10 business days. If <strong>the</strong> prescribed time elapses without a<br />

permit being issued or <strong>the</strong> application being rejected, <strong>the</strong> application is deemed<br />

refused.<br />

Uncertified Application - Class 1 & 10 <strong>Building</strong>s - s17<br />

For prescribed buildings only (classes 1 and 10 in <strong>the</strong> National Construction Code),<br />

<strong>the</strong> <strong>Building</strong> Act 2011 requires a local government, in its role as a permit authority, <strong>to</strong><br />

accept an uncertified application. The permit authority must arrange for a registered<br />

building surveyor <strong>to</strong> sign a certificate of design compliance and issue <strong>the</strong> permit<br />

within 25 business days. If <strong>the</strong> prescribed time elapses without a permit being issued<br />

or <strong>the</strong> application being rejected, <strong>the</strong> application is deemed refused.<br />

3


<strong>Building</strong> Permit - No building work without a building permit - s9<br />

A building permit under <strong>the</strong> <strong>Building</strong> Act 2011 is essentially <strong>the</strong> same as a building<br />

licence under <strong>the</strong> Local Government (Miscellaneous Provisions) Act. On <strong>the</strong> day <strong>the</strong><br />

<strong>Building</strong> Act 2011 commences, all existing building licences issued under <strong>the</strong> old Act<br />

will have effect as building permits under <strong>the</strong> new Act.<br />

Certificate of Design Compliance - s19<br />

All certified applications for a building permit must include a certificate of design<br />

compliance. This must be signed by a registered building surveyor and state that <strong>the</strong><br />

building will comply with each building standard that applies <strong>to</strong> it. It can be issued by<br />

a local government (if <strong>the</strong> registered building surveyor is employed by <strong>the</strong> local<br />

government), or a registered building surveying contrac<strong>to</strong>r (if <strong>the</strong> registered building<br />

surveyor is employed by <strong>the</strong> contrac<strong>to</strong>r).<br />

Demolition Permit - s15<br />

A demolition permit is required for any demolition work, when demolishing ei<strong>the</strong>r a<br />

full building or part of a building.<br />

A demolition permit under <strong>the</strong> <strong>Building</strong> Act is essentially <strong>the</strong> same as a demolition<br />

licence under <strong>the</strong> Local Government (Miscellaneous Provisions) Act. On <strong>the</strong> day <strong>the</strong><br />

<strong>Building</strong> Act 2011 commences, all demolition licences will have effect as demolition<br />

permits.<br />

Notice of Completion - s33<br />

The builder or <strong>the</strong> demolition contrac<strong>to</strong>r must submit a notice of completion <strong>to</strong> <strong>the</strong><br />

relevant permit authority within 7 days of completion of <strong>the</strong> building or demolition<br />

work. A notice of completion states <strong>the</strong> building work for which <strong>the</strong> permit was<br />

granted has been completed and is required for all buildings and incidental<br />

structures for which a building permit or demolition permit has been issued.<br />

A notice of completion establishes <strong>the</strong> end date of <strong>the</strong> building or demolition permit<br />

for compliance and record keeping purposes. It also signifies <strong>the</strong> point from which<br />

<strong>the</strong> builder or demolition contrac<strong>to</strong>r has fulfilled his obligations regarding compliance<br />

with <strong>the</strong> <strong>Building</strong> Act.<br />

4


Occupancy Permit - s40 <strong>to</strong> s65<br />

Except for class 1 and 10 buildings, before a completed building is occupied, an<br />

occupancy permit must be obtained from <strong>the</strong> permit authority. It is evidence that a<br />

building has been lawfully constructed and is safe <strong>to</strong> occupy for <strong>the</strong> use stated on <strong>the</strong><br />

permit. An occupancy permit covers a number of different situations:<br />

To occupy a completed building<br />

To occupy temporarily an uncompleted building<br />

To approve an additional temporary use of a building<br />

To approve a permanent change of a building‘s use or classification<br />

For registration of a strata scheme or plan of re-subdivision<br />

To approve retrospectively unauthorised work<br />

To bring an existing building in<strong>to</strong> <strong>the</strong> <strong>Building</strong> Act framework.<br />

An application for an occupancy permit must be accompanied by a:<br />

Certificate of construction compliance (for new buildings); or<br />

Certificate of building compliance (for existing buildings).<br />

On <strong>the</strong> day <strong>the</strong> <strong>Building</strong> Act commences, a certificate of classification for an existing<br />

building will be taken <strong>to</strong> be an occupancy permit. <strong>Building</strong>s under construction will<br />

need an occupancy permit before <strong>the</strong>y can be occupied.<br />

<strong>Building</strong> Approval Certificate - s46 <strong>to</strong> s65<br />

This can be used in circumstances where an occupancy permit is not applicable,<br />

such as for class 1 and 10 buildings, or incidental structures. It provides certainty<br />

that a building or incidental structure meets <strong>the</strong> relevant requirements, and can be<br />

used <strong>to</strong> approve retrospectively previously unauthorised work. It can also be used for<br />

registration of strata title plans.<br />

Certificate of Construction Compliance - s56<br />

A certificate of construction compliance, signed by a registered building surveyor,<br />

certifies that <strong>the</strong> building has been constructed in accordance with <strong>the</strong> certificate of<br />

design compliance and <strong>the</strong> building permit, all associated plans, specifications and<br />

conditions, and that <strong>the</strong> building is safe <strong>to</strong> occupy. The builder named on <strong>the</strong> building<br />

permit is responsible for constructing <strong>the</strong> building correctly.<br />

5


Certificate of <strong>Building</strong> Compliance - s57<br />

A certificate of building compliance, signed by a registered building surveyor,<br />

certifies that an existing building complies with <strong>the</strong> applicable building standards.<br />

For an existing building that was authorised under <strong>the</strong> laws of <strong>the</strong> time, <strong>the</strong> standards<br />

are those that applied at <strong>the</strong> time of its construction. The certificate of building<br />

compliance confirms that <strong>the</strong>re are no obvious departures from <strong>the</strong> original building<br />

approval, and that it is safe <strong>to</strong> occupy.<br />

For an existing, but unauthorised building, or for a change of use or classification,<br />

<strong>the</strong> applicable standards are those for new buildings. The registered building<br />

surveyor, when signing <strong>the</strong> certificate, is confirming that <strong>the</strong> building will perform <strong>to</strong><br />

<strong>the</strong> level set for new buildings, for <strong>the</strong> proposed use or classification, and that it is<br />

safe <strong>to</strong> occupy.<br />

6


The Roles and Responsibilities of a Permit Authority<br />

The permit authority is a fundamental part of <strong>the</strong> building approvals process. Its<br />

primary purpose is <strong>to</strong> ensure that all permit applications are correct and <strong>to</strong> issue<br />

permits <strong>to</strong> applicants and owners. The permit authority also has <strong>the</strong> role of record<br />

keeper and ensures conformity with <strong>the</strong> building laws.<br />

Changes for Local Government<br />

In becoming a permit authority, <strong>the</strong>re is a range of different choices that each local<br />

government will need <strong>to</strong> consider <strong>to</strong> make <strong>the</strong> most of <strong>the</strong> opportunities that <strong>the</strong><br />

<strong>Building</strong> Act 2011 brings. The Act requires local government <strong>to</strong> change <strong>the</strong> way <strong>the</strong>y<br />

currently operate <strong>the</strong>ir building approvals systems.<br />

The <strong>New</strong> Role of Local Government<br />

The role of local government in <strong>the</strong> new building approvals process is split between<br />

three main functions:<br />

<strong>Building</strong> certifying services<br />

Permit approval and issuing<br />

Enforcement<br />

The functions of Local Government in <strong>the</strong> new building approvals process<br />

Local Government<br />

Certification<br />

Service<br />

(No timeframe)<br />

Permit Authority<br />

Permit<br />

Issued<br />

Full Certification Request<br />

(any class of building)<br />

Unregulated fee<br />

Uncertified Application<br />

(Class 1 &10)<br />

Regulated fee | 35 day limit<br />

Certified Application<br />

(any class of building)<br />

Regulated fee | 14 day limit<br />

Figure 1<br />

7


Local Government Permit Authorities<br />

Permit Approval and Issuing<br />

A local government will be a permit authority under <strong>the</strong> Act. This is a separate<br />

function <strong>to</strong> that of a certifier. The permit authority checks <strong>the</strong> application for a<br />

permit is complete and has <strong>the</strong> associated certificate included in <strong>the</strong> application.<br />

The permits and supporting certificates are:<br />

Permit<br />

<strong>Building</strong> Permit<br />

Certificate of Design Compliance<br />

Certificate<br />

Demolition Permit<br />

Occupancy Permit<br />

No Certificate<br />

<strong>New</strong> <strong>Building</strong>s<br />

(with a current Certificate of Design Compliance)<br />

Certificate of Construction<br />

Compliance<br />

Existing <strong>Building</strong>s<br />

Certificate of <strong>Building</strong><br />

Compliance<br />

Table 1<br />

A correctly filled out certificate mentioned in Table 1 will only confirm that <strong>the</strong><br />

building conforms <strong>to</strong> building regulations and requirements. It may, but doesn‘t<br />

have <strong>to</strong>, certify <strong>the</strong> building meets o<strong>the</strong>r laws or requirements, such as planning,<br />

health, fire or heritage requirements. It is <strong>the</strong> role of <strong>the</strong> permit authority <strong>to</strong><br />

ensure that <strong>the</strong> application is consistent with <strong>the</strong>se requirements, including any<br />

that are specific <strong>to</strong> <strong>the</strong> local government – such as footpath deposits. In addition<br />

<strong>the</strong> permit authority must ensure that all levies and fees are paid.<br />

Dealing with applications for building permits (s16 <strong>to</strong> s35)<br />

The <strong>Building</strong> Act treats <strong>the</strong> process of certifying compliance with building<br />

standards; and <strong>the</strong> process of dealing with an application and issuing a building<br />

permit as separate processes. The certification of compliance is opened up <strong>to</strong><br />

competition, and may be done by a local government in <strong>the</strong> same way as<br />

previously, or it may be done by a private sec<strong>to</strong>r building surveyor. Local<br />

governments can continue <strong>to</strong> offer <strong>the</strong> same service that <strong>the</strong>y currently do, with<br />

less restriction on <strong>the</strong> fees charged or <strong>the</strong> time taken, and can offer enhanced<br />

services in competition with <strong>the</strong> private sec<strong>to</strong>r and o<strong>the</strong>r local governments if<br />

<strong>the</strong>y wish.<br />

Request for certifying services<br />

An applicant may ask a local government <strong>to</strong> provide a certifying service. This<br />

will let <strong>the</strong> applicant lodge a set of drawings and specifications with <strong>the</strong> local<br />

government for it <strong>to</strong> provide a certificate of design compliance, arrange for <strong>the</strong><br />

completion of <strong>the</strong> building permit application form and <strong>the</strong>n process <strong>the</strong><br />

application as a certified application under section 14 of <strong>the</strong> <strong>Building</strong> Act. The<br />

8


local government may charge whatever fee it wants <strong>to</strong> provide this service and<br />

<strong>the</strong>re is no required time limit.<br />

When <strong>the</strong> application is ready for lodgement <strong>the</strong> local government must <strong>the</strong>n<br />

process <strong>the</strong> application within <strong>the</strong> time prescribed for a certified application. The<br />

prescribed time limits, and o<strong>the</strong>r formal requirements for certified applications,<br />

apply once <strong>the</strong> completed application form is lodged.<br />

Unless an applicant presents a complete application for a certified application or<br />

an uncertified application on <strong>the</strong> appropriate forms (see below) <strong>the</strong> local<br />

government is entitled <strong>to</strong> consider any lodgement of drawings and specifications<br />

for approval as a request for certifying services. A local government should<br />

explain <strong>the</strong> two-stage process, <strong>the</strong> local government‘s policy and fees for <strong>the</strong><br />

certifying service, and <strong>the</strong> options available <strong>to</strong> use a private certifier <strong>to</strong> lodge a<br />

certified application, or if appropriate, <strong>the</strong> right <strong>to</strong> lodge an uncertified application.<br />

An application lodged in <strong>the</strong> form used under <strong>the</strong> repealed Local Government<br />

(Miscellaneous Provisions) Act can be treated as a request for certifying<br />

services. This service includes getting <strong>the</strong> information necessary <strong>to</strong> complete<br />

<strong>the</strong> new certified application form. When <strong>the</strong> form is completed <strong>the</strong> permit<br />

authority will lodge it and process it as a certified application.<br />

Certified Application (s14)<br />

If an applicant presents a completed application form for a certified application<br />

<strong>to</strong>ge<strong>the</strong>r with a certificate of design compliance it should be treated as a certified<br />

application under <strong>the</strong> <strong>Building</strong> Act section 14. The application must be<br />

processed within <strong>the</strong> prescribed time, and for <strong>the</strong> prescribed fee. If <strong>the</strong><br />

application is not complete <strong>the</strong> permit authority may request fur<strong>the</strong>r information<br />

under section 18. If <strong>the</strong> application does not comply with <strong>the</strong> requirements of<br />

section 16, or <strong>the</strong> permit authority is not satisfied under section 20 it may refuse<br />

<strong>the</strong> application.<br />

A checklist of <strong>the</strong> requirements of section 16 and section 20 are detailed in<br />

tables 3 and 4 within this guide.<br />

Uncertified Application (s17)<br />

If an applicant presents a completed application form for an uncertified<br />

application it must be processed within <strong>the</strong> prescribed time, and for <strong>the</strong><br />

prescribed fee. An applicant may require <strong>the</strong> permit authority <strong>to</strong> deal with an<br />

application as an uncertified application, and in that case <strong>the</strong> prescribed time<br />

limits and fees will apply. If <strong>the</strong> application is not complete <strong>the</strong> permit authority<br />

may request fur<strong>the</strong>r information under section 18. If <strong>the</strong> application does not<br />

comply with <strong>the</strong> requirements of section 16, or <strong>the</strong> permit authority is not<br />

satisfied under section 20 it may refuse <strong>the</strong> application.<br />

9


Timeframes<br />

Timeframes are a new part of <strong>the</strong> building approval process. They are prescribed in<br />

regulations and are business days (so exclude all public holidays). Common <strong>to</strong> all<br />

applications is <strong>the</strong> ability for permit authorities <strong>to</strong> request fur<strong>the</strong>r information for<br />

incomplete applications, instead of refusing <strong>the</strong>m. A permit authority may specify up<br />

<strong>to</strong> 21 calendar days for fur<strong>the</strong>r information <strong>to</strong> be supplied.<br />

Once <strong>the</strong> information is supplied, <strong>the</strong> clock is restarted from <strong>the</strong> beginning. The<br />

permit authority has 25 business days (for uncertified applications) or 10 business<br />

days (for certified applications) <strong>to</strong> make a decision on <strong>the</strong> application. These<br />

timeframes start from <strong>the</strong> day after <strong>the</strong> day when <strong>the</strong> information was lodged.<br />

Maximum Timeframe for Permit Applications<br />

Applications<br />

Initial<br />

timeframe<br />

(business days)<br />

Fur<strong>the</strong>r<br />

Information<br />

(calendar days)<br />

Timeframe after<br />

fur<strong>the</strong>r<br />

information due<br />

(business days)<br />

<strong>Building</strong> Permit (uncertified) 25 up <strong>to</strong> 21 25<br />

Demolition, Occupancy and 10 up <strong>to</strong> 21 10<br />

<strong>Building</strong> Permit (certified)<br />

Levies and Fees<br />

Permit authorities will be responsible for <strong>the</strong> collection of <strong>the</strong> <strong>Building</strong> Services Levy<br />

and can charge fees for applications. A schedule of fees is available from <strong>the</strong><br />

<strong>Building</strong> <strong>Commission</strong> website.<br />

The <strong>Building</strong> Services Levy only replaces <strong>the</strong> Builders Registration Board levy, not<br />

any o<strong>the</strong>r levies or fees.<br />

Table 2<br />

Repayment of Fees<br />

If <strong>the</strong> permit authority has not made a decision <strong>to</strong> approve a permit within <strong>the</strong><br />

prescribed timeframe, <strong>the</strong> permit fee must be repaid <strong>to</strong> <strong>the</strong> applicant. However, if <strong>the</strong><br />

application is refused, <strong>the</strong>n <strong>the</strong>re is no obligation <strong>to</strong> refund <strong>the</strong> permit fee.<br />

Repayment of Levy<br />

If an application for a permit is refused by <strong>the</strong> Permit Authority, <strong>the</strong> Permit Authority<br />

must refund <strong>the</strong> <strong>Building</strong> Services Levy <strong>to</strong> <strong>the</strong> applicant included in <strong>the</strong> written notice<br />

of <strong>the</strong> decision <strong>to</strong> refuse <strong>the</strong> application (see Permits and Certificates section below)<br />

10


An Overview of <strong>the</strong> <strong>New</strong> <strong>Building</strong> Approvals System<br />

<strong>Building</strong> Permit Approvals Process – Uncertified Applications<br />

Houses and associated structures (Class 1 & 10) only<br />

Submits <strong>Building</strong> Application <strong>to</strong><br />

Permit Authority (local government)<br />

Refers application <strong>to</strong> a Registered <strong>Building</strong><br />

Surveyor <strong>to</strong> assess application<br />

Assesses Plans<br />

Permit Authority (local<br />

government) checks application<br />

conforms (in accordance with s20 of<br />

<strong>Building</strong> Act)<br />

Issues Certificate of Design<br />

Compliance<br />

Permit Authority (local government) issues<br />

<strong>Building</strong> Permit <strong>to</strong> Builder, each Owner and<br />

Applicant (if different)<br />

Construction Commences<br />

Inspections during construction (if required)<br />

Construction complete<br />

Provides Notice of Completion <strong>to</strong> Permit Authority (local<br />

government) within 7 days of end of construction<br />

Figure 2<br />

11


<strong>Building</strong> Permit Approvals Process – Certified Applications<br />

All <strong>Building</strong>s (including Class 1 and 10)<br />

Arranges a<br />

Registered <strong>Building</strong> Surveyor<br />

Assesses Plans<br />

Issues Certificate of Design<br />

Compliance<br />

Permit Authority (local<br />

government) checks application<br />

conforms (in accordance with s20 of<br />

<strong>Building</strong> Act)<br />

Submits <strong>Building</strong> Permit<br />

Application <strong>to</strong> Permit Authority<br />

(local government) with all<br />

plans, specifications, technical<br />

documents and fees/levies<br />

Permit Authority (local government)<br />

issues <strong>Building</strong> Permit <strong>to</strong> Builder, each<br />

Owner and Applicant (if different)<br />

Construction Commences<br />

Inspections during construction (if required)<br />

Construction complete<br />

Provides Notice of Completion <strong>to</strong> Permit<br />

Authority (local government) within 7 days of end<br />

of construction<br />

Class 2 <strong>to</strong> 9 buildings must obtain an Occupancy Permit before being occupied<br />

(see figure 4)<br />

Figure 3<br />

12


Occupancy Permit/ <strong>Building</strong> Approval Certificate Process<br />

Only required for Class 2—9 <strong>Building</strong>s<br />

<strong>New</strong> <strong>Building</strong>s<br />

Owner engages a registered building<br />

surveyor<br />

Registered building<br />

surveyor issues *<br />

Certificate of<br />

Construction Compliance<br />

Application for Occupancy<br />

Permit/<strong>Building</strong> Approval<br />

Certificate lodged with<br />

Permit Authority<br />

Existing <strong>Building</strong>s<br />

Registered building<br />

surveyor issues *<br />

Certificate of<br />

<strong>Building</strong> Compliance<br />

* See table 6 for<br />

explanation of<br />

circumstances for<br />

when an<br />

Occupancy Permit<br />

or <strong>Building</strong> Approval<br />

Certificate is<br />

required<br />

Permit Authority (local<br />

government) checks<br />

application conforms<br />

(in accordance with s58 of <strong>the</strong><br />

<strong>Building</strong> Act)<br />

Permit Authority (local government)<br />

issues Occupancy Permit/<strong>Building</strong><br />

Approval Certificate <strong>to</strong> each Owner and<br />

Applicant (if different)<br />

Figure 4<br />

13


Permits and Certificates<br />

The permit authority will issue permits (including <strong>the</strong> building approval certificate).<br />

These permits are <strong>to</strong> be signed by an officer who has <strong>the</strong> right <strong>to</strong> act on behalf of <strong>the</strong><br />

permit authority by delegation of powers (under section 127 of <strong>the</strong> <strong>Building</strong> Act).<br />

Applications for a <strong>Building</strong> or Demolition Permit<br />

<strong>Building</strong>s That Do Not Need a Permit - s66 <strong>to</strong> s74<br />

Although all buildings and incidental structures are required <strong>to</strong> comply with <strong>the</strong><br />

building standards, <strong>the</strong>re will be some buildings that do not require a building,<br />

demolition or occupancy permit.<br />

The regulations prescribe <strong>the</strong> areas and types of buildings and building work that do<br />

not require a building permit. These are listed in detail in Schedule 3 of <strong>the</strong> <strong>Building</strong><br />

Regulations 2011.<br />

The <strong>Building</strong> Act provides that <strong>the</strong> following buildings (and incidental structures) don‘t<br />

require a building permit:<br />

Temporary buildings (that will stand for no longer than one month), unless<br />

members of <strong>the</strong> public normally use or are permitted access <strong>to</strong> <strong>the</strong> building<br />

<strong>Building</strong>s incidental <strong>to</strong> infrastructure or that is/will be used in <strong>the</strong> construction,<br />

operation or maintenance of road, rail, port, harbour, airport, water, sewerage,<br />

electricity, oil or gas supply infrastructure, or buildings incidental <strong>to</strong> shipping and<br />

boating facilities used in <strong>the</strong> construction, operation or maintenance of facilities<br />

defined in <strong>the</strong> Marine and Harbours Act 1981 section 5(1)(i), unless it is/will be a<br />

residential facility, a recreational facility that members of <strong>the</strong> public are permitted<br />

access <strong>to</strong> or normally use.<br />

<strong>Building</strong>s incidental <strong>to</strong> mining operations, exploiting petroleum and o<strong>the</strong>r<br />

resources and <strong>to</strong> industrial processing plants that is/will be used in <strong>the</strong><br />

construction, operation or maintenance of a place where mining operations occur,<br />

unless it is/will be a residential facility, a recreational facility that members of <strong>the</strong><br />

public are permitted access <strong>to</strong> or normally use.<br />

The details of <strong>the</strong> definitions and connected legislation are in <strong>the</strong> Act and<br />

Regulations.<br />

<strong>Building</strong> Permit - s16<br />

A local government permit authority will need <strong>to</strong> run two approval streams. Both<br />

certified and uncertified building permit applications must be processed by a local<br />

government permit authority<br />

A permit authority may place conditions or requirements on a permit that relate <strong>to</strong> <strong>the</strong><br />

specific application where required. A permit authority may not add conditions that<br />

would change <strong>the</strong> certificate of design compliance, i.e. changing <strong>the</strong> drawings or<br />

specifications or <strong>the</strong> way <strong>the</strong> building complies with <strong>the</strong> building standards.<br />

14


If <strong>the</strong> application is declined, <strong>the</strong> permit authority must, within 5 days, provide <strong>the</strong><br />

grounds and reasons for <strong>the</strong> decision <strong>to</strong> <strong>the</strong> affected person (normally, but not<br />

always, <strong>the</strong> applicant or owner) in writing. It must also state <strong>the</strong> right of review in <strong>the</strong><br />

State Administrative Tribunal. An approved form will not be required for this<br />

notification, but <strong>the</strong> contents of such a notice are contained within <strong>the</strong> <strong>Building</strong><br />

Regulations 2011.<br />

When a permit authority grants a building permit, a copy of <strong>the</strong> permit must be sent<br />

<strong>to</strong> each owner listed on <strong>the</strong> building permit application, <strong>the</strong> builder and <strong>the</strong> applicant,<br />

if <strong>the</strong> applicant isn‘t <strong>the</strong> builder or owner.<br />

Certified - s14<br />

Certified building applications must be submitted with an attached certified certificate<br />

of design compliance, signed by an appropriately registered building surveyor. A<br />

permit authority must be satisfied as <strong>to</strong> each of <strong>the</strong> matters mentioned in section<br />

20(1)(a) <strong>to</strong> (s) of <strong>the</strong> Act. A list of <strong>the</strong>se requirements is described in table 4 below.<br />

The certificate of design compliance provides evidence that <strong>the</strong> plans meet <strong>the</strong><br />

appropriate building standards. The permit authority is not obliged <strong>to</strong> review <strong>the</strong><br />

certificate of design compliance, and <strong>the</strong> plans associated with it.<br />

The permit authority can accept a certified application for a complete building or for<br />

part of a building.<br />

The permit authority may refuse <strong>to</strong> grant a permit if it considers that <strong>the</strong>re is a<br />

significant error in <strong>the</strong> information or a document (including <strong>the</strong> certificate of design<br />

compliance) associated with <strong>the</strong> application or that granting <strong>the</strong> permit would be<br />

inconsistent with any of its functions under any written law or an agreement with <strong>the</strong><br />

owner.<br />

The permit authority will <strong>the</strong>n need <strong>to</strong> check <strong>the</strong> prescribed authorities, such as<br />

planning, heritage, and/or health requirements, if <strong>the</strong>se issues have not been<br />

covered by <strong>the</strong> certificate of design compliance.<br />

Once <strong>the</strong> permit authority is satisfied that <strong>the</strong> application meets <strong>the</strong> requirements, it<br />

must issue a building permit. This must be done within <strong>the</strong> prescribed time of <strong>the</strong><br />

application being lodged, being 10 business days.<br />

If fur<strong>the</strong>r information is required <strong>the</strong> fur<strong>the</strong>r information must be supplied within <strong>the</strong><br />

time specified by <strong>the</strong> permit authority. If this is not <strong>the</strong> case, <strong>the</strong> permit authority may<br />

refuse <strong>to</strong> consider <strong>the</strong> application. A maximum time limit will be prescribed in<br />

regulations. The prescribed time for <strong>the</strong> applicant <strong>to</strong> supply fur<strong>the</strong>r information is a<br />

maximum of 21 (calendar) days. As <strong>the</strong> clock is reset when additional information is<br />

received, <strong>the</strong> permit authority has an additional 10 business days <strong>to</strong> make a<br />

decision on <strong>the</strong> application.<br />

15


If a decision is not made in time, <strong>the</strong> application is deemed refused, and <strong>the</strong><br />

applicant/owner can appeal <strong>to</strong> <strong>the</strong> State Administrative Tribunal for a determination<br />

on <strong>the</strong> decision.<br />

The permit authority may continue <strong>to</strong> process and determine <strong>the</strong> application after <strong>the</strong><br />

prescribed time has elapsed. However, <strong>the</strong> permit authority must refund <strong>the</strong><br />

application fee.<br />

Uncertified - s17<br />

This type of permit application is essentially <strong>the</strong> same as <strong>the</strong> system under <strong>the</strong> Local<br />

Government (Miscellaneous Provisions) Act 1960, where <strong>the</strong> permit authority will<br />

accept an application, but only for class 1 and 10 buildings. The permit authority will<br />

<strong>the</strong>n assign <strong>the</strong> application <strong>to</strong> a suitably qualified registered building surveyor. It‘s<br />

likely that this person will be employed within <strong>the</strong> same local government, but <strong>the</strong>re<br />

is no requirement <strong>to</strong> do this.<br />

Once <strong>the</strong> registered building surveyor has issued a certificate of design compliance<br />

<strong>to</strong> <strong>the</strong> permit authority and <strong>the</strong> permit authority is satisfied that <strong>the</strong> all requirements<br />

have been met, it must issue a building permit. This must be done within <strong>the</strong><br />

prescribed time of <strong>the</strong> uncertified application being lodged, being 25 business days.<br />

If fur<strong>the</strong>r information is required <strong>the</strong> fur<strong>the</strong>r information must be supplied within <strong>the</strong><br />

time specified by <strong>the</strong> permit authority. If this is not <strong>the</strong> case, <strong>the</strong> permit authority may<br />

refuse <strong>to</strong> consider <strong>the</strong> application. A maximum time limit will be prescribed in<br />

regulations. The prescribed time for <strong>the</strong> applicant <strong>to</strong> supply fur<strong>the</strong>r information is a<br />

maximum of 21 (calendar) days. Once <strong>the</strong> information has been provided, <strong>the</strong> permit<br />

authority has an additional 25 business days <strong>to</strong> make a decision on <strong>the</strong> application.<br />

A local government (as opposed <strong>to</strong> a permit authority) can accept an uncertified<br />

application for class 2 <strong>to</strong> 9 buildings, but only via <strong>the</strong>ir certification function, if <strong>the</strong>y<br />

have one. Once <strong>the</strong> local government certification area issues a certificate of design<br />

compliance, <strong>the</strong> applicant or owner can apply <strong>to</strong> <strong>the</strong> permit authority part of <strong>the</strong> local<br />

government for a building permit.<br />

16


Checking Applications<br />

When accepting applications for a building permit, a permit authority must check <strong>the</strong><br />

following, as outlined in section 16 and section 20 of <strong>the</strong> <strong>Building</strong> Act.<br />

Section 16<br />

<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 16: Making an Application<br />

Section Requirement Explanation<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

Must be made in an approved<br />

manner and form. The form must be<br />

filled out completely and correctly.<br />

Must name, and be signed by, each<br />

owner of <strong>the</strong> land on which <strong>the</strong><br />

building or incidental structure is <strong>to</strong><br />

be located.<br />

Must name, and be signed by, <strong>the</strong><br />

person who proposes <strong>to</strong> be named<br />

as <strong>the</strong> builder on <strong>the</strong> building permit,<br />

or <strong>the</strong> demolition contrac<strong>to</strong>r on <strong>the</strong><br />

demolition permit.<br />

Must provide prescribed information<br />

about <strong>the</strong> building or incidental<br />

structure and <strong>the</strong> persons mentioned<br />

in paragraph (b) or (c).<br />

Available at:<br />

www.buildingcommission.wa.gov.au.<br />

An agent or at<strong>to</strong>rney can sign on<br />

behalf of an owner. The Permit<br />

Authority can ask for proof of <strong>the</strong><br />

agreement that an agent can sign<br />

for <strong>the</strong> owner.<br />

If <strong>the</strong> builder or demolition contrac<strong>to</strong>r<br />

is a corporation <strong>the</strong> application can<br />

be signed by an officer or agent of<br />

<strong>the</strong> corporation.<br />

If an owner-builder, approval from<br />

<strong>the</strong> <strong>Building</strong> Services Board must be<br />

attached <strong>to</strong> <strong>the</strong> application.<br />

The prescribed information is<br />

contained in <strong>the</strong> application form<br />

(which is why it is important for <strong>the</strong><br />

form <strong>to</strong> be filled out completely and<br />

correctly). The following is listed in<br />

<strong>the</strong> regulations and is in addition <strong>to</strong><br />

(b) and (c):<br />

Address of <strong>the</strong> property on<br />

which <strong>the</strong> building or incidental<br />

structure will be (or is) located;<br />

The intended use of <strong>the</strong><br />

building/structure;<br />

The postal address of <strong>the</strong><br />

builder/demolition contrac<strong>to</strong>r;<br />

Contact details of <strong>the</strong><br />

builder/demolition contrac<strong>to</strong>r;<br />

The registration number of <strong>the</strong><br />

person as a building services<br />

contrac<strong>to</strong>r, or <strong>the</strong> number of <strong>the</strong><br />

owner-builder approval given by<br />

<strong>the</strong> <strong>Building</strong> Services Board;<br />

17


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 16: Making an Application<br />

Section Requirement Explanation<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(i)<br />

(j)<br />

If a certified application, must be<br />

accompanied by a certificate of<br />

design compliance for <strong>the</strong> building or<br />

incidental structure that is <strong>the</strong><br />

subject of <strong>the</strong> application, that is<br />

signed by a building surveyor and<br />

complies with section 19.<br />

If a certified application, must be<br />

accompanied by <strong>the</strong> plans and<br />

specifications that are specified in<br />

<strong>the</strong> certificate of design compliance<br />

for <strong>the</strong> building or incidental<br />

structure that is <strong>the</strong> subject of <strong>the</strong><br />

application.<br />

If a certified application, must be<br />

accompanied by a copy of each<br />

technical certificate signed by a<br />

specialist that <strong>the</strong> building surveyor<br />

has relied on <strong>to</strong> sign <strong>the</strong> certificate of<br />

design compliance.<br />

If an uncertified application, must be<br />

accompanied by <strong>the</strong> plans and<br />

specifications for consideration by a<br />

building surveyor under section 17.<br />

Must be accompanied by each<br />

technical certificate that is<br />

prescribed <strong>to</strong> accompany <strong>the</strong><br />

application<br />

Must be accompanied by evidence<br />

that <strong>the</strong> applicable provisions of <strong>the</strong><br />

Home <strong>Building</strong> Contracts Act 1991<br />

requiring insurance or corresponding<br />

cover have been satisfied.<br />

The <strong>Building</strong> <strong>Commission</strong> will<br />

provide a standard Certificate of<br />

Design Compliance form that will be<br />

available on our website.<br />

The regulations prescribe <strong>the</strong> details<br />

required on <strong>the</strong> plans and<br />

specifications.<br />

The technical certificates are listed<br />

on <strong>the</strong> certificate of design<br />

compliance.<br />

The <strong>Building</strong> Regulations will not<br />

prescribe any technical documents<br />

that must accompany a certificate of<br />

design compliance.<br />

However, where a registered<br />

building surveyor has relied on<br />

technical documentation, <strong>the</strong>se<br />

should be listed on, and attached<br />

with, <strong>the</strong> certificate of design<br />

compliance.<br />

The <strong>Building</strong> Regulations will not<br />

prescribe any technical documents<br />

that must accompany a certificate of<br />

design compliance.<br />

A policy of insurance must be in<br />

place; or corresponding cover as<br />

defined in section 25A of <strong>the</strong> Home<br />

<strong>Building</strong> Contract Act 1991 is<br />

provided; or nei<strong>the</strong>r <strong>the</strong> policy of<br />

insurance nor <strong>the</strong> cover is required<br />

by that Act.<br />

18


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 16: Making an Application<br />

Section Requirement Explanation<br />

(k)<br />

(l)<br />

(m)<br />

Must be accompanied by evidence<br />

that <strong>the</strong> applicable provisions of <strong>the</strong><br />

regulations mentioned in <strong>the</strong><br />

<strong>Building</strong> Services (Complaint<br />

Resolution and Administration) Act<br />

2011 Part 7 Division 2 requiring<br />

payment of a building services levy<br />

have been satisfied.<br />

Must be accompanied by <strong>the</strong><br />

prescribed fee, if any, for <strong>the</strong><br />

application.<br />

Must be accompanied by each o<strong>the</strong>r<br />

thing that is prescribed <strong>to</strong><br />

accompany <strong>the</strong> application.<br />

Ensure <strong>the</strong> application is<br />

accompanied by a payment of<br />

0.09% of <strong>the</strong> value of building work<br />

but not less than $40.50, which <strong>the</strong><br />

permit authority must, within 14 days<br />

after <strong>the</strong> end of <strong>the</strong> month in which it<br />

grants <strong>the</strong> permit, remit <strong>the</strong> amount<br />

<strong>to</strong> <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>er. Refer<br />

regulation 12(2) and 18 of <strong>the</strong><br />

<strong>Building</strong> Services (Compliant<br />

Resolution and Administration)<br />

Regulations 2011.<br />

The fees prescribed in Schedule x<br />

Division x of <strong>the</strong> <strong>Building</strong><br />

Regulations 2011 are payable on<br />

application.<br />

Refer regulation xx(x) [17(4)] of <strong>the</strong><br />

<strong>Building</strong> Regulations 2011 for each<br />

o<strong>the</strong>r thing that must accompany an<br />

application.<br />

Table 3<br />

19


Section 20<br />

<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 20: Grant of <strong>Building</strong> Permit<br />

Section Requirement Explanation<br />

(1)(a)<br />

(1)(b)<br />

(1)(c)<br />

That <strong>the</strong> applicant has complied with<br />

section 16.<br />

That <strong>the</strong> person mentioned in section<br />

16(c):<br />

(i) is a building service contrac<strong>to</strong>r<br />

who is entitled under <strong>the</strong><br />

Registration Act section 11 <strong>to</strong> be<br />

named as <strong>the</strong> builder on <strong>the</strong><br />

building permit; or<br />

(ii) has owner builder approval<br />

under <strong>the</strong> Registration Act <strong>to</strong><br />

carry out that work; or<br />

(iii) is a person or in a class of<br />

persons prescribed for <strong>the</strong><br />

purposes of <strong>the</strong> Registration Act<br />

section 7(2)(c) who may be<br />

named as <strong>the</strong> builder on <strong>the</strong><br />

building permit, unless <strong>the</strong><br />

building work is of a kind<br />

specified by <strong>the</strong> regulations.<br />

That a certificate of design<br />

compliance for <strong>the</strong> building or<br />

incidental structure that is <strong>the</strong> subject<br />

of <strong>the</strong> application complies with<br />

section 19.<br />

Covered by checklist for section 16<br />

Section 16(c) requires <strong>the</strong> name and<br />

signature of <strong>the</strong> builder<br />

(i) Requires <strong>the</strong> builder <strong>to</strong> be registered as<br />

a building contrac<strong>to</strong>r. A list of building<br />

contrac<strong>to</strong>rs is available at:<br />

www.buildingcommission.wa.gov.au.<br />

(ii) Regulations require <strong>the</strong> owner builder<br />

approval is attached <strong>to</strong> <strong>the</strong> application.<br />

The owner builder approval is provided by<br />

<strong>the</strong> <strong>Building</strong> Services Board. More<br />

information is available at<br />

www.buildingcommission.wa.gov.au.<br />

(iii) Is a registered builder. This can be<br />

verified by searching <strong>the</strong> appropriate<br />

database on <strong>the</strong> <strong>Building</strong> <strong>Commission</strong><br />

website.<br />

NOTE: Where <strong>the</strong> building permit application<br />

is in relation <strong>to</strong> a building work that is not<br />

―builder work‖ as defined in <strong>the</strong> <strong>Building</strong><br />

Services (Registration) Regulations 2011, <strong>the</strong>n<br />

anyone can be named as <strong>the</strong> builder.<br />

The standard, approved, certificate of<br />

design compliance form is available at:<br />

www.buildingcommission.wa.gov.au.<br />

It is important <strong>to</strong> ensure this approved<br />

form is used.<br />

20


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 20: Grant of <strong>Building</strong> Permit<br />

Section Requirement Explanation<br />

(1)(d)<br />

(1)(e)<br />

(1)(f)<br />

That <strong>the</strong> building surveyor who<br />

signed <strong>the</strong> certificate of design<br />

compliance:<br />

(i) is entitled under <strong>the</strong> Registration<br />

Act <strong>to</strong> sign certificates of design<br />

compliance for buildings or<br />

incidental structures of <strong>the</strong> kind<br />

that is <strong>the</strong> subject of <strong>the</strong><br />

application; and<br />

(ii) is an independent building<br />

surveyor in relation <strong>to</strong> <strong>the</strong><br />

application.<br />

That <strong>the</strong> certificate of design<br />

compliance is issued by a person<br />

who:<br />

(i) is a building service contrac<strong>to</strong>r<br />

who is entitled under <strong>the</strong><br />

Registration Act section 11 <strong>to</strong><br />

issue <strong>the</strong> certificate; or<br />

(ii) is a person or in a class of<br />

persons prescribed for <strong>the</strong><br />

purposes of <strong>the</strong> Registration Act<br />

section 7(2)(c) who may issue<br />

<strong>the</strong> certificate.<br />

That each technical certificate<br />

mentioned in section 16(i) is:<br />

(i) signed by a person prescribed as<br />

a person who may sign <strong>the</strong><br />

certificate; and<br />

(ii) issued by a person prescribed as<br />

a person who may issue <strong>the</strong><br />

certificate.<br />

The certificate of design compliance must<br />

be signed by a registered building<br />

surveying practitioner.<br />

(i) List of registered building surveyors<br />

available at:<br />

www.buildingcommission.wa.gov.au.<br />

(ii) The certificate of design compliance<br />

will contain a statement of independence.<br />

‗Independent‘ under <strong>the</strong> <strong>Building</strong> Act 2011<br />

means <strong>the</strong> building surveyor must be<br />

nei<strong>the</strong>r <strong>the</strong> builder, or <strong>the</strong>ir employee, or<br />

owner or <strong>the</strong>ir employee.<br />

The certificate of design compliance must<br />

also be signed by a registered building<br />

surveying contrac<strong>to</strong>r.<br />

(i) List of registered building surveying<br />

contrac<strong>to</strong>rs is available at:<br />

www.buildingcommission.wa.gov.au.<br />

You will need <strong>to</strong> check that both <strong>the</strong><br />

practitioner and contrac<strong>to</strong>r are registered<br />

and have signed <strong>the</strong> form.<br />

The regulations will prescribe local<br />

governments and state government<br />

agencies as not requiring registration as<br />

building surveying contrac<strong>to</strong>rs.<br />

NOTE: The certificate of design compliance<br />

must be signed by a registered building<br />

surveyor practitioner (<strong>the</strong> person), but issued<br />

by <strong>the</strong> registered building contrac<strong>to</strong>r (<strong>the</strong><br />

company), <strong>to</strong> ensure <strong>the</strong>re are sufficient<br />

insurance provisions.<br />

Technical certificates will not be<br />

prescribed for section 16(i) for<br />

commencement day.<br />

21


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 20: Grant of <strong>Building</strong> Permit<br />

Section Requirement Explanation<br />

(1)(g)<br />

(1)(h)<br />

(1)(i)<br />

If a part of a building or incidental<br />

structure is proposed <strong>to</strong> be placed<br />

beyond <strong>the</strong> boundaries of <strong>the</strong> land on<br />

which <strong>the</strong> building work is proposed <strong>to</strong><br />

be done, that <strong>the</strong>re is compliance with<br />

section 76 (encroachments).<br />

If <strong>the</strong> building work may adversely<br />

affect land beyond <strong>the</strong> boundaries of<br />

<strong>the</strong> land on which <strong>the</strong> work is<br />

proposed <strong>to</strong> be done, that <strong>the</strong>re is<br />

compliance with section 77 (work<br />

affecting o<strong>the</strong>r land).<br />

That ei<strong>the</strong>r:<br />

(i) a policy of insurance is in force in<br />

respect of <strong>the</strong> building work under<br />

<strong>the</strong> Home <strong>Building</strong> Contracts Act<br />

1991 Part 3A Division 2; or<br />

(ii) corresponding cover, as defined in<br />

<strong>the</strong> Home <strong>Building</strong> Contracts Act<br />

1991 section 25A, is provided in<br />

respect of <strong>the</strong> building work; or<br />

(iii) <strong>the</strong> policy of insurance mentioned<br />

in subparagraph (i) or <strong>the</strong> cover<br />

mentioned in subparagraph (ii) is<br />

not required under <strong>the</strong> Home<br />

<strong>Building</strong> Contracts Act 1991 in<br />

respect of <strong>the</strong> building work.<br />

The permit authority needs <strong>to</strong> be satisfied<br />

that any proposed encroachment is<br />

complying with section 76 of <strong>the</strong> <strong>Building</strong><br />

Act. To assist permit authorities <strong>the</strong><br />

application for a permit requires a<br />

declaration that <strong>the</strong>re is likely <strong>to</strong> be an<br />

encroachment.<br />

The agreement from an adjoining owner <strong>to</strong><br />

encroach, or a court order, must be<br />

detailed in/attached <strong>to</strong> <strong>the</strong> application,<br />

where relevant. This will be a standard<br />

form from <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>.<br />

The permit authority needs <strong>to</strong> be satisfied<br />

that any proposed building work that may<br />

adversely affect o<strong>the</strong>r land is complying<br />

with section 77 of <strong>the</strong> <strong>Building</strong> Act. To<br />

assist permit authorities <strong>the</strong> application<br />

form for a permit contains a declaration<br />

that <strong>the</strong>re is likely <strong>to</strong> be work affecting<br />

o<strong>the</strong>r land.<br />

The agreement from an adjoining owner <strong>to</strong><br />

affect <strong>the</strong>ir land, or a court order, must be<br />

detailed in/attached <strong>to</strong> <strong>the</strong> application,<br />

where relevant. This will be a standard<br />

form from <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>.<br />

Fur<strong>the</strong>r information on work affecting o<strong>the</strong>r<br />

land is available in <strong>the</strong> Local Government<br />

Manual and in The <strong>New</strong> <strong>Building</strong><br />

Approvals System: <strong>Guide</strong> <strong>to</strong> <strong>the</strong><br />

<strong>Building</strong> Act 2011<br />

The regulations require that <strong>the</strong> applicant<br />

provides a copy of <strong>the</strong> insurance cover<br />

note or policy with <strong>the</strong> application.<br />

Corresponding cover is not currently<br />

approved under <strong>the</strong> Home <strong>Building</strong><br />

Contracts Act 1991.<br />

22


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 20: Grant of <strong>Building</strong> Permit<br />

Section Requirement Explanation<br />

(1)(j)<br />

(1)(k)<br />

(1)(l)<br />

(1)(m)<br />

That <strong>the</strong> applicant satisfies any o<strong>the</strong>r<br />

insurance requirements prescribed by<br />

regulation or under any o<strong>the</strong>r written<br />

law in respect of <strong>the</strong> building work.<br />

That any building services levy<br />

required <strong>to</strong> be paid in respect of <strong>the</strong><br />

building permit under regulations<br />

mentioned in <strong>the</strong> <strong>Building</strong> Services<br />

(Complaint Resolution and<br />

Administration) Act 2011 Part 7<br />

Division 2 has been paid.<br />

If a Construction Training Fund levy is<br />

imposed in respect of <strong>the</strong> building<br />

work that <strong>the</strong> levy has been paid.<br />

That <strong>the</strong> permit authority has complied<br />

with <strong>the</strong> provisions of <strong>the</strong> Heritage of<br />

Western Australia Act 1990 in relation<br />

<strong>to</strong> <strong>the</strong> application and that granting <strong>the</strong><br />

building permit would not be<br />

inconsistent with an order, agreement<br />

or permit under that Act except <strong>to</strong> <strong>the</strong><br />

extent allowed by that Act.<br />

O<strong>the</strong>r insurance will not be prescribed on<br />

commencement day.<br />

Checked under 16(k).<br />

The CTF regulations require payment of<br />

<strong>the</strong> levy at <strong>the</strong> time of application for a<br />

permit. Proof of payment needs <strong>to</strong><br />

accompany <strong>the</strong> application. Proof may be,<br />

but is not limited <strong>to</strong>:<br />

<strong>the</strong> applicant‘s cheque,<br />

a copy of a credit card receipt<br />

issued by <strong>the</strong> permit authority<br />

evidence of an electronic funds<br />

transfer.<br />

This applies when <strong>the</strong> building that is <strong>the</strong><br />

subject of a current application is placed<br />

on <strong>the</strong> Heritage Register before a decision<br />

is made. The Heritage Council can<br />

provide details of orders, agreements or<br />

permits.<br />

23


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 20: Grant of <strong>Building</strong> Permit<br />

Section Requirement Explanation<br />

(1)(n)<br />

That <strong>the</strong> applicant has obtained in<br />

relation <strong>to</strong> <strong>the</strong> building work each<br />

authority under a written law that is<br />

prescribed for <strong>the</strong> purposes of this<br />

paragraph.<br />

The authorities that will be prescribed are:<br />

If <strong>the</strong> building work is defined as<br />

‗development‘ under s.4 of <strong>the</strong><br />

Planning and Development Act 2005<br />

approval under s.162 of <strong>the</strong> Act;<br />

If <strong>the</strong> building work involves<br />

construction, alteration or extension of<br />

an aquatic facility (under regulation 4 of<br />

<strong>the</strong> Health (Aquatic Facilities)<br />

Regulations 2007), an approval given<br />

under Part 2 Division 1 of those<br />

regulations;<br />

If <strong>the</strong> building work involves <strong>the</strong><br />

construction or installation of any<br />

apparatus for <strong>the</strong> treatment of<br />

sewerage (defined in Health Act 1911<br />

s.3(1)), <strong>the</strong> approvals required under<br />

s.107(2) of that Act;<br />

An approval required under regulation<br />

12(1) of <strong>the</strong> Local Government<br />

(Uniform Local Provisions) Regulations<br />

1996 – crossings from public <strong>to</strong> private<br />

land;<br />

If <strong>the</strong> work is over a sewer or water<br />

main, <strong>the</strong> consent required under <strong>the</strong><br />

following laws:<br />

o The Country Areas Water Supply<br />

Act 1947, s.43B;<br />

o The Country Towns Sewerage Act<br />

1948, s.42;<br />

o The Metropolitan Water Supply,<br />

Sewerage, and Drainage Act 1909,<br />

s.50A(1) or 66(1)<br />

The application form for a permit will<br />

contain a statement as <strong>to</strong> whe<strong>the</strong>r an<br />

approval has been obtained.<br />

24


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 20: Grant of <strong>Building</strong> Permit<br />

Section Requirement Explanation<br />

(1)(o)<br />

(1)(p)<br />

That <strong>the</strong> applicant has complied or is<br />

complying with each authority<br />

mentioned in paragraph (n).<br />

That <strong>the</strong> applicant, in relation <strong>to</strong> <strong>the</strong><br />

building work, has complied or is<br />

complying with each provision of a<br />

written law that is prescribed for <strong>the</strong><br />

purposes of this paragraph.<br />

The permit authority needs <strong>to</strong> be satisfied<br />

that <strong>the</strong> applicant has complied with each<br />

authority mentioned in (n). To assist<br />

permit authorities <strong>the</strong> certificate of design<br />

compliance will contain a statement from<br />

<strong>the</strong> registered building surveyor that <strong>the</strong><br />

plans and specifications are not<br />

inconsistent with <strong>the</strong> stated approvals,<br />

such as planning.<br />

The permit authority may wish <strong>to</strong> form its<br />

own opinion on this matter.<br />

(1)(q)<br />

That <strong>the</strong> applicant, in relation <strong>to</strong> <strong>the</strong><br />

building work, has complied or is<br />

complying with each provision of a<br />

local government policy or<br />

requirement, not being a written law,<br />

that is prescribed for <strong>the</strong> purposes of<br />

this paragraph.<br />

The regulations will not prescribe local<br />

government policy requirements on<br />

commencement.<br />

25


<strong>Building</strong> Permit Application: Certified and Uncertified<br />

Section 20: Grant of <strong>Building</strong> Permit<br />

Section Requirement Explanation<br />

(1)(r)<br />

(1)(s)<br />

That each notification that is<br />

prescribed for <strong>the</strong> purposes of this<br />

paragraph <strong>to</strong> be given in relation <strong>to</strong><br />

<strong>the</strong> building work has been given.<br />

That <strong>the</strong> applicant has complied with<br />

each o<strong>the</strong>r prescribed requirement for<br />

<strong>the</strong> granting of a building permit on<br />

<strong>the</strong> application.<br />

Notification must be given <strong>to</strong> <strong>the</strong> Heritage<br />

Council of Western Australia that includes<br />

<strong>the</strong> name, address and contact number of<br />

<strong>the</strong> applicant and name of <strong>the</strong> permit<br />

authority <strong>to</strong> which <strong>the</strong> application is made,<br />

if <strong>the</strong> place <strong>the</strong> application relates <strong>to</strong>:<br />

o a Heritage Agreement (under<br />

Heritage Act s.29);<br />

o Is entered in <strong>the</strong> Register of<br />

Heritage Places (established under<br />

<strong>the</strong> Heritage Act s46);<br />

o Is subject <strong>to</strong> a Conservation Order<br />

(under Heritage Act s.59);<br />

o Is subject <strong>to</strong> an Order in Council<br />

(under Heritage Act s80).<br />

The notifications under <strong>the</strong> following<br />

laws:<br />

o The Country Areas Water Supply<br />

Act 1947, s.43A;<br />

o The Country Towns Sewerage Act<br />

1948, s.41A;<br />

The Metropolitan Water Supply,<br />

Sewerage, and Drainage Act 1909,<br />

s.148.<br />

If <strong>the</strong> application relates <strong>to</strong> building work<br />

for a Class 2 <strong>to</strong> Class 9 building, <strong>the</strong><br />

applicant has deposited with FESA <strong>the</strong><br />

plans and specifications, specified in <strong>the</strong><br />

certificate of design compliance<br />

accompanying <strong>the</strong> application.<br />

Table 4<br />

26


Demolition Permit - s15 and s21<br />

An application for a demolition permit can be made for an entire building or for an<br />

incidental structure and may apply <strong>to</strong> one or more stages of demolition ra<strong>the</strong>r than<br />

for <strong>the</strong> entire building.<br />

The application should be considered as an uncertified application, as it will not be<br />

lodged with <strong>the</strong> permit authority with any prior certification (see table 2). The<br />

timeframe for approving <strong>the</strong> application is prescribed in regulations. The prescribed<br />

time is 25 business days.<br />

Permit authorities can set <strong>the</strong> duration of <strong>the</strong> demolition permit.<br />

The demolition contrac<strong>to</strong>r must be qualified <strong>to</strong> undertake <strong>the</strong> type of demolition that<br />

is being applied for, and all conditions and o<strong>the</strong>r requirements, such as heritage and<br />

provisions for work affecting o<strong>the</strong>r land must be adhered <strong>to</strong>, <strong>to</strong> <strong>the</strong> satisfaction of <strong>the</strong><br />

permit authority before a demolition permit can be issued.<br />

Checking Demolition Permit Applications<br />

When accepting an application for a demolition permit, a permit authority must check<br />

<strong>the</strong> following:<br />

Demolition Permit Application Checklist<br />

This is a list of what is required for a demolition permit application, under section 21<br />

of <strong>the</strong> <strong>Building</strong> Act.<br />

Demolition Permit Application<br />

Section 21: Grant of Demolition Permit<br />

Section Requirement Explanation<br />

1(a)<br />

1(b)<br />

Application completed fully and<br />

correctly as set out in s16 of <strong>the</strong><br />

<strong>Building</strong> Act 2011.<br />

That <strong>the</strong> demolition contrac<strong>to</strong>r has<br />

any authority under ano<strong>the</strong>r written<br />

law <strong>to</strong> do <strong>the</strong> demolition work.<br />

The application form will be available <strong>to</strong><br />

download from <strong>the</strong> <strong>Building</strong> <strong>Commission</strong><br />

website.<br />

If <strong>the</strong>re is any requirement, primarily under <strong>the</strong><br />

Health Act 1911, that <strong>the</strong> demolition contract<br />

has approvals for specialised demolition work<br />

(such as asbes<strong>to</strong>s removal) that this approval is<br />

attached <strong>to</strong> <strong>the</strong> application.<br />

27


1(c)<br />

1(d)<br />

1(e)<br />

1(f)<br />

1(g)(h)<br />

1(i)<br />

1(j)(k)(l)<br />

That <strong>the</strong> demolition work will<br />

comply with each building standard<br />

that applies <strong>to</strong> <strong>the</strong> demolition work.<br />

That consent of <strong>the</strong> owner of o<strong>the</strong>r<br />

land or a court order has been<br />

obtained <strong>to</strong> authorise an<br />

encroachment or <strong>to</strong> adversely<br />

affect o<strong>the</strong>r land as set out in s.77<br />

(adversely affecting o<strong>the</strong>r land) of<br />

<strong>the</strong> <strong>Building</strong> Act 2011.<br />

Any part of <strong>the</strong> building or<br />

incidental structure is proposed <strong>to</strong><br />

remain as a permanent retaining or<br />

o<strong>the</strong>r protection structure is<br />

suitable for that purpose.<br />

Where required, professional<br />

indemnity insurance or o<strong>the</strong>r<br />

prescribed insurance cover is<br />

obtained.<br />

The <strong>Building</strong> Services Levy has<br />

been paid, and any o<strong>the</strong>r levy<br />

(including any levy imposed by <strong>the</strong><br />

BCITF).<br />

The proposal complies with<br />

heritage requirements or orders.<br />

The applicant has obtained <strong>the</strong><br />

prior approvals (authorities) under<br />

written law prescribed in <strong>the</strong><br />

regulations and is complying with<br />

<strong>the</strong>m.<br />

28<br />

The standards are set out in <strong>the</strong> <strong>Building</strong><br />

Regulations 2011, s.x [8], and are:<br />

Before demolition work commences, each<br />

electrical, gas, telephone or water service<br />

<strong>to</strong> <strong>the</strong> building must be disconnected;<br />

Material removed or displaced from a<br />

building:<br />

o Must not be placed in such as way as <strong>to</strong><br />

cause a floor of <strong>the</strong> building <strong>to</strong> collapse;<br />

and<br />

o Must not be placed in any street, road or<br />

right of way; and<br />

o Must be sprayed with water, or<br />

o<strong>the</strong>rwise treated, <strong>to</strong> prevent any<br />

nuisance from dust; and<br />

o Must be removed from <strong>the</strong> demolition<br />

site; and<br />

o Must not be burned on <strong>the</strong> demolition<br />

site;<br />

Any septic tank on <strong>the</strong> demolition site must<br />

be emptied and ei<strong>the</strong>r removed or filled with<br />

clean sand;<br />

Any soakwell, leach drain or similar<br />

apparatus on <strong>the</strong> demolition site must ei<strong>the</strong>r<br />

be removed or filled with clean sand.<br />

Consent or court order attached <strong>to</strong> application.<br />

This would be best determined by <strong>the</strong> <strong>Building</strong><br />

Services Department/Registered <strong>Building</strong><br />

Surveyor.<br />

Cover note/insurance policy attached <strong>to</strong><br />

application.<br />

Payment, or proof of payment, accompanies <strong>the</strong><br />

application.<br />

Evidence that application complies with heritage<br />

requirements, when relevant.<br />

The prescribed regulations are:<br />

If <strong>the</strong> building work is defined as<br />

‗development‘ under s.4 of <strong>the</strong> Planning and<br />

Development Act 2005 approval under s.162<br />

of <strong>the</strong> Act.


1(m)<br />

1(n)<br />

1(o)<br />

Confirms <strong>the</strong> demolition work<br />

complies with local government<br />

policies, etc. that are not<br />

prescribed written laws.<br />

Each notification in <strong>the</strong> regulations<br />

has been included.<br />

The applicant has complied with<br />

each o<strong>the</strong>r prescribed requirement<br />

for granting a demolition permit.<br />

These are prescribed as:<br />

Notification must be given <strong>to</strong> <strong>the</strong> Heritage<br />

Council of Western Australia that includes<br />

<strong>the</strong> name, address and contact number of<br />

<strong>the</strong> applicant and name of <strong>the</strong> permit<br />

authority <strong>to</strong> which <strong>the</strong> application is made, if<br />

<strong>the</strong> place <strong>the</strong> application relates <strong>to</strong>:<br />

o Is subject <strong>to</strong> a Heritage Agreement<br />

(under Heritage Act s.29);<br />

o Is entered in <strong>the</strong> Register of Heritage<br />

Places (established under <strong>the</strong> Heritage<br />

Act s.46);<br />

o Is subject <strong>to</strong> a Conservation Order<br />

(under Heritage Act s.59);<br />

o Is subject <strong>to</strong> an Order in Council (under<br />

Heritage Act s80).<br />

The notifications required under <strong>the</strong><br />

Occupational Safety and Health Regulations<br />

1996 – regulation 3.119;<br />

Notification of <strong>the</strong> intended demolition work<br />

<strong>to</strong> each person who provides electricity, gas,<br />

telephone, or water services <strong>to</strong> <strong>the</strong> property.<br />

There is a requirement that <strong>the</strong> applicant has<br />

obtained a certificate from <strong>the</strong> local government<br />

in which <strong>the</strong> demolition is <strong>to</strong> be carried out<br />

certifying that <strong>the</strong> building <strong>to</strong> be demolished has<br />

been treated <strong>to</strong> ensure that it is not infested by<br />

rodents.<br />

Table 5<br />

29


Decision Not <strong>to</strong> Grant a <strong>Building</strong> Permit or Demolition Permit – s24<br />

A permit authority is not obliged <strong>to</strong> issue a permit if it considers <strong>the</strong>re is an error in<br />

<strong>the</strong> application.<br />

Duration of a <strong>Building</strong>/Demolition Permit<br />

The duration of <strong>the</strong> building or demolition permit is set at 2 years from <strong>the</strong> day it was<br />

granted as a default. Any application for an extension of <strong>the</strong> building permit can be<br />

sent <strong>to</strong> <strong>the</strong> permit authority in any format <strong>the</strong> permit authority allows. The application<br />

for an extension must include <strong>the</strong> requirements set out in s32 of <strong>the</strong> <strong>Building</strong> Act and<br />

associated regulations. The regulations require an application <strong>to</strong> extend <strong>the</strong> duration<br />

of a building or demolition permit <strong>to</strong> include:<br />

<strong>the</strong> reference number of <strong>the</strong> permit <strong>to</strong> be extended;<br />

<strong>the</strong> proposed new date for <strong>the</strong> permit <strong>to</strong> cease <strong>to</strong> have effect; and<br />

a statement setting out <strong>the</strong> grounds for requesting <strong>the</strong> extension;<br />

The permit authority may approve <strong>the</strong> request only on <strong>the</strong> grounds that:<br />

any delay in completing <strong>the</strong> building or demolition work was caused by reason<br />

beyond <strong>the</strong> control of <strong>the</strong> applicant; or<br />

o<strong>the</strong>r special circumstances warrant acceptance of <strong>the</strong> application.<br />

The permit authority may issue <strong>the</strong> extension subject <strong>to</strong> conditions. Any decision <strong>to</strong><br />

refuse an extension can be taken <strong>to</strong> <strong>the</strong> State Administrative Tribunal for review.<br />

30


Certificate of<br />

Construction Compliance<br />

Certificate of <strong>Building</strong> Compliance<br />

Occupancy Permits and <strong>Building</strong> Approval Certificates –<br />

Part 4<br />

A permit authority will issue occupancy permits, which are only applicable <strong>to</strong> class 2-<br />

9 buildings, and building approval certificates. Occupancy permits are new <strong>to</strong> <strong>the</strong><br />

building approvals process and building approval certificates will be used for a wider<br />

range of circumstances than previously. They can be used <strong>to</strong> manage a number of<br />

different circumstances, including:<br />

confirming compliance of a completed building;<br />

temporary or staged occupation of an incomplete building;<br />

approving a permanent or short-term change of use and/or classification;<br />

registration of a strata scheme, plan of re-subdivision;<br />

retrospectively approving unauthorised buildings; or<br />

confirming compliance of an existing, authorised, building.<br />

Occupancy Requirements Matrix<br />

<strong>Building</strong> has a current <strong>Building</strong><br />

Permit<br />

Class 2 – 9<br />

buildings<br />

Class 1 & 10<br />

buildings<br />

Completed building<br />

Temporary or staged occupation<br />

of an incomplete building<br />

Occupancy<br />

Permit<br />

All o<strong>the</strong>r applications<br />

Short term change of use<br />

Permanent change of approved<br />

use and/or classification<br />

Registration of strata scheme,<br />

plan of re-subdivision<br />

Retrospectively approving<br />

unauthorised buildings<br />

Confirming compliance of an<br />

existing, authorised building<br />

Short term use of transient<br />

buildings (Circus tents, market<br />

buildings etc)<br />

Occupancy<br />

Permit<br />

<strong>Building</strong> Approval<br />

Certificate<br />

(manda<strong>to</strong>ry when<br />

retrospectively<br />

approving<br />

unauthorised<br />

buildings and<br />

registration of strata<br />

plans)<br />

Table 6<br />

31


Application for Occupancy Permits<br />

Occupancy Permits - s40 <strong>to</strong> s65<br />

Under <strong>the</strong> <strong>Building</strong> Act 2011 it is an offence <strong>to</strong> occupy a building without a valid<br />

occupancy permit. The permit confirms that <strong>the</strong> building is safe <strong>to</strong> occupy and that it<br />

meets all relevant building regulations and standards. The owner of <strong>the</strong> building is<br />

responsible for ensuring that <strong>the</strong> occupancy permit is complied with.<br />

Occupancy permits can include requirements for ongoing use of <strong>the</strong> building<br />

including specifying <strong>the</strong> maintenance, testing and inspection of equipment,<br />

machinery and systems in <strong>the</strong> buildings.<br />

In addition regulations may require manda<strong>to</strong>ry testing, maintenance or o<strong>the</strong>r<br />

requirements dealing with health, safety, amenity and sustainability of a building.<br />

<strong>Building</strong> Approval Certificates - s46 <strong>to</strong> s65<br />

<strong>Building</strong> Approval Certificates are available for single residential and non habitable<br />

buildings and incidental structures where an occupancy permit is not required.<br />

<strong>Building</strong> Approval Certificates are not manda<strong>to</strong>ry, but can be used <strong>to</strong> confirm <strong>the</strong><br />

status of a building for a legal, insurance or any o<strong>the</strong>r reason.<br />

Certificate of Construction Compliance - s56<br />

A certificate of construction compliance accompanies an application for a permanent<br />

occupancy permit for new Class 2–9 buildings. It can also accompany an application<br />

for a building approval certificate for new Class 1 and 10 buildings. A building with a<br />

certificate of design compliance will need a certificate of construction compliance<br />

when applying for an occupancy permit unless strata titling is needed.<br />

The certificate of construction compliance confirms that <strong>the</strong> construction has been<br />

completed in accordance with <strong>the</strong> certificate of design compliance (that accompanies<br />

a building permit) including that all tests and inspections have been undertaken.<br />

Certificate of <strong>Building</strong> Compliance - s57<br />

When submitting an application for an occupancy permit or building approval<br />

certificate when <strong>the</strong> building doesn‘t have a current certificate of design compliance,<br />

a certificate of building compliance must accompany it. This certificate of building<br />

compliance confirms that <strong>the</strong> building or structure complies with <strong>the</strong> regulations that<br />

were or are pertinent <strong>to</strong> it. The certificate of building compliance can be used for a<br />

wide range of circumstances, as is outlined in Table 3. It should be noted that an<br />

unoccupied new building requiring strata titling would require a certificate of building<br />

compliance, not a certificate of construction compliance.<br />

32


Strata Applications – s50<br />

When applying <strong>to</strong> register a strata scheme, or a plan of re-subdivision, <strong>the</strong> process<br />

requires lodging an occupancy permit application, or building approval certificate<br />

application, depending on <strong>the</strong> circumstances as set out in Table 3. This new process<br />

will replace <strong>the</strong> old ‗Form 7‘ that was available from Landgate. The application must<br />

include a certificate of building compliance, certified by a registered building<br />

surveyor.<br />

An occupancy permit or building approval certificate will confirm <strong>to</strong> Landgate that <strong>the</strong><br />

building complies with <strong>the</strong> relevant building approvals, including where appropriate,<br />

those relating <strong>to</strong> strata titling or re-subdivision.<br />

33


Notices<br />

Notice of Decision Not <strong>to</strong> Grant a Permit - s24<br />

Permit Authorities are required <strong>to</strong> give written notice of <strong>the</strong> decision not <strong>to</strong> grant a<br />

permit within 5 days of <strong>the</strong> decision being made. The Notice must contain <strong>the</strong><br />

grounds and reasons for not granting <strong>the</strong> permit. As with all o<strong>the</strong>r permits,<br />

applications and notices, a standard form will be available <strong>to</strong> download from <strong>the</strong><br />

<strong>Building</strong> <strong>Commission</strong> website.<br />

Notice of Completion - s33<br />

The builder or <strong>the</strong> demolition contrac<strong>to</strong>r must submit a notice of completion <strong>to</strong> <strong>the</strong><br />

relevant permit authority within 7 days of completion of <strong>the</strong> building or demolition<br />

stating that <strong>the</strong> building work for which <strong>the</strong> permit was granted has been completed.<br />

This applies <strong>to</strong> all types of building.<br />

A notice of completion establishes <strong>the</strong> end date of <strong>the</strong> building or demolition permit<br />

for compliance and record keeping purposes. It also signifies <strong>the</strong> point from which<br />

<strong>the</strong> builder or demolition contrac<strong>to</strong>r has fulfilled his obligations regarding compliance<br />

with <strong>the</strong> <strong>Building</strong> Act. It must be accompanied by a copy of a certificate for each<br />

inspection or test that applies <strong>to</strong> <strong>the</strong> permit.<br />

A notice of completion does not affect contractual matters such as <strong>the</strong> contents or<br />

timing of a notice of practical completion or any requirements <strong>to</strong> make good any<br />

defects <strong>to</strong> a building before a final certificate is issued. If <strong>the</strong> building work <strong>to</strong> rectify<br />

any defects requires a building permit, an application can be made <strong>to</strong> res<strong>to</strong>re <strong>the</strong><br />

original building permit (<strong>Building</strong> Regulations relating <strong>to</strong> section 32(3)) or an<br />

application can be made for a new building permit for <strong>the</strong> remedial work.<br />

Notice of Cessation - s34<br />

A builder or demolition contrac<strong>to</strong>r can issue a Notice of Cessation <strong>to</strong> a permit<br />

authority that triggers suspension of <strong>the</strong> permit (s35) and notifies <strong>the</strong> permit authority<br />

that work has s<strong>to</strong>pped. This can be issued at any time whilst <strong>the</strong> building or<br />

demolition permit is in effect.<br />

Any inspection certificates are <strong>to</strong> be submitted with <strong>the</strong> Notice of Cessation for<br />

s<strong>to</strong>rage with <strong>the</strong> relevant building records.<br />

34


Suspension of <strong>Building</strong> or Demolition Permit - s35<br />

Suspension occurs when <strong>the</strong>re is no nominated builder or demolition contrac<strong>to</strong>r<br />

responsible for <strong>the</strong> work. This can occur if:<br />

<strong>the</strong> responsible person is dismissed or walks away from <strong>the</strong> job, and provides <strong>the</strong><br />

permit authority with a Notice of Cessation; or<br />

<strong>the</strong> responsible person ceases <strong>to</strong> be eligible under <strong>the</strong> Registration Bill.<br />

The permit has no effect from <strong>the</strong> start of <strong>the</strong> suspension until <strong>the</strong> relevant permit<br />

authority approves a new builder or demolition contrac<strong>to</strong>r, or until <strong>the</strong> permit<br />

expires.<br />

Work Affecting O<strong>the</strong>r Land - Part 6<br />

The extent <strong>to</strong> which a permit authority is concerned with work affecting o<strong>the</strong>r land is<br />

<strong>to</strong> check that <strong>the</strong> certificates supporting permit applications, for instance <strong>the</strong><br />

certificate of design compliance, show that <strong>the</strong> building work is likely <strong>to</strong> adversely<br />

affect neighbouring land. This covers building or demolition work that may adversely<br />

impact o<strong>the</strong>r land (or structures on <strong>the</strong> neighbouring land) by affecting its bearing<br />

capacity or drainage; cause <strong>the</strong> need for protection structures, such as underpinning<br />

or piling; change party walls or fences; or require encroachments or access on<strong>to</strong> <strong>the</strong><br />

o<strong>the</strong>r land.<br />

If this is <strong>the</strong> case, <strong>the</strong>re should be a notice and permission documents attached <strong>to</strong><br />

<strong>the</strong> application. If <strong>the</strong>re is no mention of <strong>the</strong> likelihood of <strong>the</strong> building work affecting<br />

o<strong>the</strong>r land on <strong>the</strong> supporting certificate, <strong>the</strong>n <strong>the</strong> permit authority can ei<strong>the</strong>r rely on<br />

this information, or can, when assessing <strong>the</strong> application, decide that <strong>the</strong>re is a<br />

likelihood of <strong>the</strong> building work affecting o<strong>the</strong>r land and request that consent is sought<br />

form <strong>the</strong> affected party.<br />

In circumstances where <strong>the</strong>re is a need <strong>to</strong> enter, or likelihood that <strong>the</strong> building work<br />

will affect, o<strong>the</strong>r land during construction, <strong>the</strong>re is now a formal process <strong>to</strong> follow.<br />

This process is primarily between <strong>the</strong> builder and <strong>the</strong> owner of <strong>the</strong> effected land.<br />

Consent from <strong>the</strong> owners of <strong>the</strong> land, or a court order, will be required before any<br />

work affecting o<strong>the</strong>r land is commenced, or any encroachment or access is made.<br />

35


Notice of Work Affecting O<strong>the</strong>r Land - s85<br />

The Notice of work affecting o<strong>the</strong>r land is a standard form available <strong>to</strong> download from<br />

<strong>the</strong> <strong>Building</strong> <strong>Commission</strong> website. It will ask for details about <strong>the</strong> work affecting <strong>the</strong><br />

o<strong>the</strong>r land, including how and what might be encroaching, what <strong>the</strong> impact might be<br />

<strong>to</strong> <strong>the</strong> o<strong>the</strong>r land and information on any protective measures will be put in place,<br />

such as structures. This notice also covers if <strong>the</strong>re is need for a worker <strong>to</strong> access<br />

o<strong>the</strong>r land or if <strong>the</strong>re is an issue with party walls or boundary fencing.<br />

The Notice will have a standard approval form attached <strong>to</strong> be completed by each<br />

owner of <strong>the</strong> affected land (or <strong>the</strong>ir agent under a power of at<strong>to</strong>rney) <strong>to</strong> give, or not<br />

give, consent.<br />

If <strong>the</strong> consent is not given, <strong>the</strong>n it is possible <strong>to</strong> apply through <strong>the</strong> Magistrates Court<br />

for a court order <strong>to</strong> make a judgement on whe<strong>the</strong>r <strong>the</strong> work can continue as planned.<br />

In addition, if consent or a court order is given for <strong>the</strong> work, <strong>the</strong>n <strong>the</strong> person<br />

responsible for <strong>the</strong> work (usually <strong>the</strong> builder) must give <strong>the</strong> affected owner(s)<br />

reasonable notice that work is about <strong>to</strong> commence. This would generally be 24 hours<br />

notice, but could be longer or shorter depending on circumstances.<br />

Obtaining Consent or Court Orders Process - s83<br />

It is found that it is reasonably likely that work will affect o<strong>the</strong>r land or structures<br />

The person responsible (Builder or Demolition Contrac<strong>to</strong>r) must give Notice of Work<br />

Affecting O<strong>the</strong>r Land <strong>to</strong> each owner of <strong>the</strong> affected land<br />

Undertake<br />

agreed<br />

measures<br />

Yes<br />

Consent<br />

obtained<br />

No<br />

Court order<br />

obtained<br />

Yes<br />

No<br />

Work is not<br />

allowed <strong>to</strong> affect<br />

o<strong>the</strong>r land<br />

Work <strong>to</strong> continue in accordance with ruling<br />

Responsible person (builder or demolition contrac<strong>to</strong>r) <strong>to</strong> give each owner<br />

of affected land a copy of <strong>the</strong> court order within 7 days<br />

36<br />

Figure 5


Court Orders - s86<br />

A court order can be sought from <strong>the</strong> Magistrates Court if consent from <strong>the</strong> owner<br />

has not been given within a statu<strong>to</strong>ry 28 days after <strong>the</strong> notice was given <strong>to</strong> <strong>the</strong><br />

owner, or if <strong>the</strong> person responsible for <strong>the</strong> work is asked <strong>to</strong> provide fur<strong>the</strong>r<br />

information, <strong>the</strong> time limit is 14 days after <strong>the</strong> fur<strong>the</strong>r information was given.<br />

Encroachment - s76<br />

The person responsible for <strong>the</strong> work (defined as <strong>the</strong> person nominated as <strong>the</strong> builder<br />

or demolition contrac<strong>to</strong>r on <strong>the</strong> building or demolition permit, or owner if <strong>the</strong>re is no<br />

permit) cannot extend a building or structure on<strong>to</strong> adjoining land without <strong>the</strong> consent<br />

of <strong>the</strong> owner of <strong>the</strong> affected land.<br />

There are situations where <strong>the</strong> consent of <strong>the</strong> owner is not given or needed:<br />

When <strong>the</strong> encroachment is allowed through a court order;<br />

When <strong>the</strong> encroachment is prescribed as minor; and<br />

When <strong>the</strong> encroachment is over Crown land, and <strong>the</strong> permission of <strong>the</strong> Minister is<br />

given.<br />

Minor Encroachments<br />

No consent is needed in cases where <strong>the</strong> encroachment is deemed minor. The<br />

definition of a minor encroachment is contained within <strong>the</strong> Department of Lands<br />

‗Government Land Bulletin No. 5 – June 2003‘, where <strong>the</strong> details are set out in <strong>the</strong><br />

bulletin‘s annexure. This document will be referenced within <strong>the</strong> regulations for <strong>the</strong><br />

<strong>Building</strong> Act. This document is available from <strong>the</strong> Department of Regional<br />

Development and Lands.<br />

Crown Land<br />

When an encroachment is over Crown land and is not of a minor nature, permission<br />

must be sought from <strong>the</strong> Minister responsible for <strong>the</strong> Land Administration Act 1997,<br />

who is <strong>the</strong> Minister for Regional Development and Lands.<br />

37


Manda<strong>to</strong>ry Inspections<br />

The building permit may prescribe inspections or tests <strong>to</strong> be carried out during<br />

construction and reported <strong>to</strong> <strong>the</strong> permit authority. The person named as builder on<br />

<strong>the</strong> building permit is responsible for arranging for a qualified person <strong>to</strong> carry out <strong>the</strong><br />

inspection or test and provide an inspection certificate that can be provided <strong>to</strong> <strong>the</strong><br />

permit authority at <strong>the</strong> end of <strong>the</strong> construction period.<br />

Manda<strong>to</strong>ry Inspections Prescribed by <strong>the</strong> Regulations<br />

For Class 2 <strong>to</strong> 9 buildings <strong>the</strong> regulations prescribe inspections <strong>to</strong> be done ei<strong>the</strong>r<br />

during or at completion of a build work. The requirements are limited <strong>to</strong> fire safety<br />

issues are listed in Schedule x, Division x of <strong>the</strong> <strong>Building</strong> Regulations. Not all <strong>the</strong><br />

inspections listed need <strong>to</strong> be done, if <strong>the</strong>y are not relevant <strong>to</strong> <strong>the</strong> building and it is up<br />

<strong>to</strong> <strong>the</strong> building surveyor <strong>to</strong> decide which of <strong>the</strong>se inspections is relevant.<br />

Manda<strong>to</strong>ry Inspections Prescribed by <strong>the</strong> <strong>Building</strong> Surveyor<br />

From commencement of <strong>the</strong> <strong>Building</strong> Act <strong>the</strong> building surveyor signing <strong>the</strong> certificate<br />

of design compliance can also require inspections and tests for an individual<br />

building. The <strong>Building</strong> Regulations will limit <strong>the</strong> possible inspections <strong>to</strong> those listed in<br />

Schedule x, Division x. A building surveyor can choose <strong>the</strong> inspections or tests from<br />

this list, and can require as many inspections as is necessary. However, a building<br />

surveyor cannot require any inspections or tests that are not listed in <strong>the</strong> <strong>Building</strong><br />

Regulations. The builder must arrange for manda<strong>to</strong>ry inspections <strong>to</strong> be carried out by<br />

a qualified person.<br />

Who is Qualified <strong>to</strong> Inspect<br />

For commencement day <strong>the</strong> people qualified <strong>to</strong> carry out any manda<strong>to</strong>ry inspection<br />

are:<br />

Registered architect;<br />

Registered building practitioner;<br />

Registered building surveyor;<br />

A person registered on <strong>the</strong> National Professional Engineers Register.<br />

Self Certification or Independent Checking<br />

The <strong>Building</strong> Regulations will state whe<strong>the</strong>r <strong>the</strong> inspection can be self-certified or<br />

must be independently certified. Self-certification allows <strong>the</strong> person responsible for<br />

<strong>the</strong> work <strong>to</strong> also check <strong>the</strong> work, in <strong>the</strong> same way that pilots carry out pre-flight<br />

checks. This means that a registered building practitioner who is also <strong>the</strong> registered<br />

building contrac<strong>to</strong>r, or is <strong>the</strong> nominated supervisor for <strong>the</strong> registered building<br />

contrac<strong>to</strong>r, or is employed by <strong>the</strong> registered building contrac<strong>to</strong>r can check work done<br />

by that builder. Independent checking requires a person who is not <strong>the</strong> builder, or<br />

not <strong>the</strong> registered building contrac<strong>to</strong>r‘s nominated supervisor or not employed by <strong>the</strong><br />

builder <strong>to</strong> check <strong>the</strong> work of <strong>the</strong> builder.<br />

38


Where <strong>the</strong> builder is an owner-builder, all manda<strong>to</strong>ry inspections must be certified by<br />

an appropriately registered person. In most cases this will require independent<br />

checking, except where an owner builder is o<strong>the</strong>rwise qualified <strong>to</strong> do <strong>the</strong> inspections.<br />

<strong>Building</strong> Information - s128<br />

Permit authorities will be required <strong>to</strong> keep records of all building related information.<br />

Permit authorities must keep a register of permits, building approval certificates and<br />

orders made by <strong>the</strong> permit authority. This must be kept in a manner that is<br />

prescribed by <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>.<br />

A permit authority must amend <strong>the</strong> register <strong>to</strong> reflect any changes <strong>to</strong> a building<br />

permit, a demolition permit, an occupancy permit, a building approval certificate or a<br />

building order.<br />

Public Access <strong>to</strong> Register of Permits - s128/129<br />

The register of permits, certificates and building orders must be available for<br />

inspection by members of <strong>the</strong> public during normal office hours. The register is an<br />

open and free resource.<br />

Access <strong>to</strong> <strong>Building</strong> Records - s130/131<br />

The permit authority must make available copies of building records, such as a<br />

building permit, demolition permit, occupancy permit, building approval certificate or<br />

building order. Copies of <strong>the</strong>se are restricted and a prescribed fee will be charged <strong>to</strong><br />

supply <strong>the</strong> document(s).<br />

Access <strong>to</strong> <strong>the</strong>se documents requires that <strong>the</strong> person formally apply and that <strong>the</strong>y are<br />

an ‗interested person‘. An ‗interested person‘ is defined as an owner of <strong>the</strong> building<br />

<strong>to</strong> which <strong>the</strong> building records relate, or someone with written consent from <strong>the</strong> owner.<br />

Also o<strong>the</strong>r interested parties as set out in regulations.<br />

Providing Information <strong>to</strong> <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>er - s132<br />

The <strong>Building</strong> <strong>Commission</strong> is required <strong>to</strong> submit an annual report under <strong>the</strong> <strong>Building</strong><br />

Act. Permit authorities are thus required <strong>to</strong> give <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>er <strong>the</strong><br />

necessary information from <strong>the</strong>ir records so that <strong>the</strong> annual report on <strong>the</strong> status of<br />

<strong>the</strong> built environment in Western Australia can be compiled. This requirement<br />

extends <strong>to</strong> requests from <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>er for matters that come under <strong>the</strong><br />

<strong>Building</strong> Services (Complaint Resolution and Administration Act 2011. This may<br />

include issues such as moni<strong>to</strong>ring developments relating <strong>to</strong> <strong>the</strong> regulation of building<br />

services in <strong>the</strong> State, administering <strong>the</strong> collection of <strong>the</strong> levy, advising <strong>the</strong> Minister or<br />

providing information, education and/or training on building standards.<br />

39


The <strong>Building</strong> <strong>Commission</strong> will prescribe <strong>the</strong> format that this information is delivered<br />

<strong>to</strong> <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>er. For more information, please see <strong>the</strong> Local<br />

Government Manual.<br />

Use of <strong>Building</strong> <strong>Commission</strong> Forms<br />

Many of <strong>the</strong> forms that are set out in <strong>the</strong> <strong>Building</strong> Act 2011, are <strong>to</strong> be standard, and<br />

will be downloadable from <strong>the</strong> <strong>Building</strong> <strong>Commission</strong> website. Permit Authorities will<br />

not be able <strong>to</strong> change <strong>the</strong> fields that are set out within <strong>the</strong>se standard forms.<br />

However, <strong>the</strong> fields can be transposed in<strong>to</strong> a permit authority‗s systems.<br />

Delegations - s127<br />

A Special Permit Authority or a Local Government can delegate any of its powers or<br />

duties as a permit authority <strong>to</strong> only a person employed by <strong>the</strong> Special Permit<br />

Authority or a Local Government (under <strong>the</strong> Local Government Act 1995 – section<br />

5.36). They cannot delegate <strong>the</strong>ir power <strong>to</strong> <strong>the</strong> private sec<strong>to</strong>r. The delegation must<br />

be in writing, executed by, or on behalf of, <strong>the</strong> Special Permit Authority or Local<br />

Government. The person that has <strong>the</strong> delegated power cannot delegate those<br />

powers <strong>to</strong> someone else.<br />

40


Enforcement - Part 8<br />

Permit authorities have <strong>the</strong> necessary powers <strong>to</strong> ensure work complies with a<br />

building or demolition permit that buildings are used in accordance with an<br />

occupancy permit and that buildings comply with building codes and standards.<br />

The local government may take enforcement action when a building is built, or<br />

demolished without a building or demolition permit.<br />

A permit authority that issued <strong>the</strong> permit may take enforcement action if building<br />

work:<br />

contravenes a building, demolition or occupancy permit;<br />

is unfit for use or occupancy;<br />

is a danger <strong>to</strong> occupants or adjoining owners; or<br />

is used in contravention of <strong>the</strong> Act or regulations.<br />

Authorised Persons - s96<br />

Authorised persons carry out enforcement functions for permit authorities.<br />

Authorised persons may have significant powers <strong>to</strong> enter buildings and obtain<br />

evidence and <strong>the</strong>refore are limited <strong>to</strong> being employees of <strong>the</strong> relevant permit<br />

authority.<br />

The authorised person must carry an identity card that has been issued by <strong>the</strong> permit<br />

authority and display it, or have it available, when carrying out enforcement duties.<br />

Enforcement Powers - s100 <strong>to</strong> s105<br />

An authorised person has <strong>the</strong> powers <strong>to</strong>:<br />

enter a building (at <strong>the</strong> consent of <strong>the</strong> owner/occupier or with an entry warrant);<br />

inspect a building and take evidence, giving a receipt of any object taken from <strong>the</strong><br />

premises;<br />

evacuate a dangerous building or direct someone from a dangerous place, or<br />

give directions generally;<br />

obtain information; and<br />

use force or assistance.<br />

Entry Warrant - s106 <strong>to</strong> s109<br />

An authorised person can obtain an entry warrant form a Justice of <strong>the</strong> Peace, and<br />

<strong>the</strong> warrant must be executed by any authorised person.<br />

41


<strong>Building</strong> Orders - s110 <strong>to</strong> s118<br />

<strong>Building</strong> Orders (a standard form from <strong>the</strong> <strong>Building</strong> <strong>Commission</strong>) can be used <strong>to</strong><br />

require someone <strong>to</strong>:<br />

s<strong>to</strong>p suspected unauthorised building or demolition work;<br />

remove a suspected unauthorised building or incidental structure;<br />

do new building or demolition work <strong>to</strong> prevent or s<strong>to</strong>p unauthorised work or an<br />

unauthorised building or incidental structure;<br />

evacuate a building that has been built or occupied without authorisation;<br />

take action <strong>to</strong> prevent breaching this Bill;<br />

provide an appropriate finish on a close wall; or<br />

deal with a dangerous building or incidental structure.<br />

The issuing person or permit authority must give 14 days‘ notice of a proposed<br />

building order and why it is <strong>to</strong> be served. A response can be submitted <strong>to</strong> <strong>the</strong> issuer<br />

and <strong>the</strong> response must be taken in<strong>to</strong> account before <strong>the</strong> building order comes in<strong>to</strong><br />

effect. The building order can be issued for a limited time, and once <strong>the</strong> order has<br />

been complied with, <strong>the</strong> person must notify <strong>the</strong> issuer.<br />

A building order cannot be issued when:<br />

<strong>the</strong> building has a valid occupancy permit or building approval certificate;<br />

an application has been made for an occupancy permit or building approval<br />

certificate and <strong>the</strong> application is still under consideration;<br />

an application for an occupancy permit or building approval certificate has been<br />

refused but <strong>the</strong> period for application for a review has not expired; or<br />

an application for review has been made and <strong>the</strong> SAT is still considering <strong>the</strong><br />

review.<br />

42


Legal Proceedings - Part 12<br />

Permit authorities and local governments will be <strong>the</strong> only entities that will be able <strong>to</strong><br />

prosecute offences. There is a 6 year limit <strong>to</strong> prosecute for:<br />

no building permit;<br />

no demolition permit;<br />

building work not in compliance with a building permit;<br />

demolition work not in compliance with a demolition permit;<br />

building work not in compliance with applicable standards;<br />

buildings not in compliance with applicable standards;<br />

demolition work not in compliance with applicable standards whe<strong>the</strong>r done by a<br />

demolition contrac<strong>to</strong>r or by an owner;<br />

unauthorised building encroachments;<br />

adversely affected land without consent or court order;<br />

unauthorised protection works or failing <strong>to</strong> notify <strong>the</strong> affected owner or <strong>the</strong> permit<br />

authority;<br />

unauthorised works affecting a party wall, substantial dividing fence or boundary<br />

retaining wall; or<br />

failing <strong>to</strong> provide <strong>the</strong> requisite notification <strong>to</strong> <strong>the</strong> affected owner (79(2)(a)) or <strong>the</strong><br />

permit authority.<br />

For any o<strong>the</strong>r offence, <strong>the</strong> time limit is 3 years.<br />

43


Transitional Arrangements - Part 16<br />

To help make <strong>the</strong> introduction of <strong>the</strong> new building approval system as smooth as<br />

possible, regulations and guidelines will clarify what happens over <strong>the</strong> transition<br />

period.<br />

Lodging Applications in <strong>the</strong> Transition Period<br />

If an application for a building licence is lodged before commencement of <strong>the</strong><br />

<strong>Building</strong> Act, but <strong>the</strong> licence is approved after <strong>the</strong> commencement, <strong>the</strong>n a Transition<br />

<strong>Building</strong> Permit will be issued. This will be a building permit, but it will be allowed <strong>to</strong><br />

be incomplete where <strong>the</strong>re were no requirements in <strong>the</strong> previous system.<br />

As Permit Authorities cannot specify conditions <strong>to</strong> a permit that affect <strong>the</strong> building<br />

standards covered in a Certificate of Design Compliance under <strong>the</strong> new Act, but can<br />

under <strong>the</strong> previous regime, Transition Permits will be allowed <strong>to</strong> contain conditions<br />

relating <strong>to</strong> building standards, as <strong>the</strong>re will be no Certificate of Design Compliance.<br />

Disclaimer:<br />

The information contained in this document is a guide <strong>to</strong> <strong>the</strong> new building approvals<br />

system under <strong>the</strong> <strong>Building</strong> Act 2011. The information provided is not intended <strong>to</strong> be<br />

exhaustive or legal advice <strong>to</strong> you. Should you be unclear as <strong>to</strong> your obligations you<br />

should seek independent legal advice.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!