20.01.2015 Views

A Guide to the New - Building Commission

A Guide to the New - Building Commission

A Guide to the New - Building Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Certificate of<br />

Construction Compliance<br />

Certificate of <strong>Building</strong> Compliance<br />

Occupancy Permits and <strong>Building</strong> Approval Certificates –<br />

Part 4<br />

A permit authority will issue occupancy permits, which are only applicable <strong>to</strong> class 2-<br />

9 buildings, and building approval certificates. Occupancy permits are new <strong>to</strong> <strong>the</strong><br />

building approvals process and building approval certificates will be used for a wider<br />

range of circumstances than previously. They can be used <strong>to</strong> manage a number of<br />

different circumstances, including:<br />

confirming compliance of a completed building;<br />

temporary or staged occupation of an incomplete building;<br />

approving a permanent or short-term change of use and/or classification;<br />

registration of a strata scheme, plan of re-subdivision;<br />

retrospectively approving unauthorised buildings; or<br />

confirming compliance of an existing, authorised, building.<br />

Occupancy Requirements Matrix<br />

<strong>Building</strong> has a current <strong>Building</strong><br />

Permit<br />

Class 2 – 9<br />

buildings<br />

Class 1 & 10<br />

buildings<br />

Completed building<br />

Temporary or staged occupation<br />

of an incomplete building<br />

Occupancy<br />

Permit<br />

All o<strong>the</strong>r applications<br />

Short term change of use<br />

Permanent change of approved<br />

use and/or classification<br />

Registration of strata scheme,<br />

plan of re-subdivision<br />

Retrospectively approving<br />

unauthorised buildings<br />

Confirming compliance of an<br />

existing, authorised building<br />

Short term use of transient<br />

buildings (Circus tents, market<br />

buildings etc)<br />

Occupancy<br />

Permit<br />

<strong>Building</strong> Approval<br />

Certificate<br />

(manda<strong>to</strong>ry when<br />

retrospectively<br />

approving<br />

unauthorised<br />

buildings and<br />

registration of strata<br />

plans)<br />

Table 6<br />

31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!