A Guide to the New - Building Commission
A Guide to the New - Building Commission
A Guide to the New - Building Commission
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Certificate of<br />
Construction Compliance<br />
Certificate of <strong>Building</strong> Compliance<br />
Occupancy Permits and <strong>Building</strong> Approval Certificates –<br />
Part 4<br />
A permit authority will issue occupancy permits, which are only applicable <strong>to</strong> class 2-<br />
9 buildings, and building approval certificates. Occupancy permits are new <strong>to</strong> <strong>the</strong><br />
building approvals process and building approval certificates will be used for a wider<br />
range of circumstances than previously. They can be used <strong>to</strong> manage a number of<br />
different circumstances, including:<br />
confirming compliance of a completed building;<br />
temporary or staged occupation of an incomplete building;<br />
approving a permanent or short-term change of use and/or classification;<br />
registration of a strata scheme, plan of re-subdivision;<br />
retrospectively approving unauthorised buildings; or<br />
confirming compliance of an existing, authorised, building.<br />
Occupancy Requirements Matrix<br />
<strong>Building</strong> has a current <strong>Building</strong><br />
Permit<br />
Class 2 – 9<br />
buildings<br />
Class 1 & 10<br />
buildings<br />
Completed building<br />
Temporary or staged occupation<br />
of an incomplete building<br />
Occupancy<br />
Permit<br />
All o<strong>the</strong>r applications<br />
Short term change of use<br />
Permanent change of approved<br />
use and/or classification<br />
Registration of strata scheme,<br />
plan of re-subdivision<br />
Retrospectively approving<br />
unauthorised buildings<br />
Confirming compliance of an<br />
existing, authorised building<br />
Short term use of transient<br />
buildings (Circus tents, market<br />
buildings etc)<br />
Occupancy<br />
Permit<br />
<strong>Building</strong> Approval<br />
Certificate<br />
(manda<strong>to</strong>ry when<br />
retrospectively<br />
approving<br />
unauthorised<br />
buildings and<br />
registration of strata<br />
plans)<br />
Table 6<br />
31