Exhibit C <strong>Item</strong> <strong>13</strong><br />

STAFFING AND FEE SCHEDULE - Emerald Necklace: Feasibility, Implementation Plan, and Programmatic EIR/EIS Additional Services for TIGER<br />

Project Inclusion<br />

Fee Estimates (6/14/20<strong>13</strong>)<br />

Withers & Sandgren -- BlueGreen Consulting<br />

Urban Assessment<br />

CWE ECORP<br />

Planners<br />

Urban Crossroads<br />

Environmental<br />

Hours<br />

TOTALS<br />

Jan Sandgren<br />

Principal Planner<br />

Lynne Dwyer<br />

Principal<br />

Martin Kammerer<br />

Principal<br />

Lacey Withers<br />

Principal<br />

Landscape Architect<br />

Patty Nalle<br />

Landscape Architect<br />

Landscape Designer<br />

Desiree Harbaugh<br />

Bryan Matsumoto<br />

Landscape Designer<br />

Vik Bapna Principal<br />

Engineer<br />

Project Engineer<br />

Labor Rate ($/hr) 150 150 150 150 110 110 85 154 101 125 N/A 145 90 165 100 165 100 90 75 110 145 140 108<br />

Carrie Sutkin<br />

DPDS<br />

PART A: (SUB to ECORP) $ 1,800<br />

DEFINING STAKEHOLDERS OBJECTIVES<br />

Assistant<br />

Anne Surdzial<br />

CEQA/NEPA Task<br />

Manager<br />

Associate<br />

Environmental Analyst<br />

Mari Quillman<br />

Principal Biologist<br />

Staff Biologist<br />

Roger Mason Principal<br />

Cultural Resources<br />

Specialist<br />

Staff Cultural<br />

Resources Specialist<br />

Contracts<br />

Clerical<br />

GIS<br />

Carlton Waters<br />

Traffic Engineer<br />

Aric Evatt<br />

Air Quality Specialist<br />

Bill Lawson<br />

Accoustical Engineer<br />

1.1 Kickoff Meetings<br />

1.2 Field Investigations 2<br />

1.3 Data Compilation and Review 1 6<br />

2.1 Identify and Document Project Team Agency Objectives<br />

2.2 Identify Additional Stakeholders 2<br />

2.3 Community Meetings and Agency Stakeholder Meeting<br />

3. Synthesis of All Project Objectives 1<br />

PART B $ 14,175<br />

FEASIBILITY STUDY<br />

4.1 Evaluate Feasibility of Projects 3<br />

4.2 Evaluate Environmental Impacts 8 40 1 6 8 8 4<br />

4.3 Agency and Stakeholder Meetings<br />

4.4 Benefit Cost Ratios<br />

4.5 Summary of Implementation Challenges (Report) 8 8 30<br />

4.6 Evaluate Connectivity and Develop Multi-Use Trails<br />

4.7 Evaluate the Feasibility of Linear Greenways and Projects<br />

PART C $ 21,360<br />

IMPLEMENTATION PLAN AND PROGRAMATIC EIR/EIS<br />

0<br />

2<br />

7<br />

0<br />

2<br />

0<br />

1<br />

3<br />

75<br />

0<br />

0<br />

46<br />

0<br />

0<br />

5.1 Develop an Implementation Plan (Report) 8 15<br />

5.2 Prepare Remaining Elements for a Programmatic EIR/EIS 4 1 3 1<br />

5.3 Develop Draft Programmatic EIR/EIS 32 56 2 4 4 21 12<br />

5.4 Administrative Final Programmatic EIR/EIS and Notices 8 12 1 1 1 4 2<br />

23<br />

9<br />

<strong>13</strong>1<br />

29<br />

PART D<br />

ALTERNATIVES FOR THE "CLASP"<br />

6.1 Develop Feasible Multi-Use Trail Alternative(s) for the Clasp<br />

PART E $ -<br />

SIGNAGE PLAN FOR THE EMERALD NECKLACE<br />

7.1 Signage Plan<br />

0<br />

Labor Total Fee $ 37,335<br />

Labor Total Hours 20 0 42 0 30 0 0 0 0 44 68 4 45 1 11 0 36 23 4 0 0<br />

Direct Cost/Expenses $ 1,800<br />

Mark-Up on Sub Consultants - Approx. 5% $ 1,237<br />

Grand Total: $ 40,372<br />