THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

WHITTIER NARROWS CONNECTIVITY:<br />

Class I Bicycle <strong>Path</strong> on <strong>Rosemead</strong> Blvd. to Legg Lake<br />

Project Description<br />

The intent of this project is to improve recreational use from south El Bosque Del Rio Hondo to<br />

Legg Lake, and from the east end of Siphon Road to Legg Lake. This Project calls for the<br />

development a Class I bicycle path on the east side of <strong>Rosemead</strong> Blvd. from the intersection at<br />

San Gabriel Blvd. and Durfee Ave. to the southwest corner of Legg Lake, allowing bicyclists,<br />

pedestrians and hikers access to Legg Lake from the Syphon Road spur of the San Gabriel River<br />

Trail. The proposed Class I bicycle path will be located on the wide shoulder of <strong>Rosemead</strong><br />

Boulevard and will be designed to CalTrans Highway Design manual standards and AASHTO<br />

Guidelines.<br />

Fig. 1. The project site is located on the east shoulder of <strong>Rosemead</strong> Blvd.<br />

The existing shoulder of <strong>Rosemead</strong> Boulevard varies in width from 2 feet at the south end of the<br />

project area to approximately 28 feet at the north end of the project area. Excess stockpiled soil<br />

located under and behind a chain link fence that separates the highway from adjacent agricultural<br />

land use will be utilized as fill for the approximately 850 lineal foot length of proposed bicycle<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 1 of 8


THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

path including the area around the existing bus stop where the existing roadway shoulder width<br />

is lacking. This area will be an encroachment into the agricultural area as the proposed bicycle<br />

path will need to avoid the existing bus stop location. Cut and fill must be balanced in this area<br />

which may result in the bicycle path being placed below the grade of the roadway in order to<br />

minimize fill. At the north end of the project area, the proposed bicycle path will meet the grade<br />

of an existing driveway into the agricultural area.<br />

The asphalted bike path will be approximately 1,900’ long, 12-foot wide, and striped to<br />

accommodate two way bicycle travel. At Legg Lake an approximately 80 foot long, 15 foot wide<br />

decomposed granite path into the <strong>Whittier</strong> Narrows Recreation Area will intersect with the<br />

internal pathways of the lake and approximately 1200 square feet of turf will be removed to<br />

accommodate the new path. Approximately 1,900 lineal feet of 6 foot fencing will be removed in<br />

order to construct the bicycle path. New fencing on both sides of the bicycle path will be<br />

required for an approximate total of 3,800 lineal feet of 54 inch tall fencing. Approximately four<br />

signs on metal posts will be removed and relocated. New signage will include two metal<br />

directional and regulatory signs on metal posts.<br />

Fig. 2. <strong>Rosemead</strong> Blvd. looking north toward Legg Lake area.<br />

Fig. 3. Trail component diagram.<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 2 of 8


THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

Fig. 4. Existing pedestrian access to Legg Lake on <strong>Rosemead</strong> Blvd.<br />

Fig. 5 & 6. The bus stop on <strong>Rosemead</strong> Blvd. and the embankment behind it.<br />

Two benches and a posted sign indicate a bus stop close to the northeast corner of the<br />

intersection that will have to be accommodated. Alignment of the bicycle path behind the bus<br />

stop will require utilization of the stockpiled soil located directly east of <strong>Rosemead</strong> Boulevard<br />

for approximately a 150’ foot length in order to construct a new bus stop with the Class I bicycle<br />

path adjacent to it flush to the road elevation.<br />

Project Site and Context<br />

The project area is in a regional recreation setting with both developed and undeveloped<br />

parkland. Land-uses surrounding the site include agriculture—such as nurseries and cropland—<br />

and industrial and infrastructural purposes such as mineral extraction, water transfer facilities,<br />

and electrical power facilities.<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 3 of 8


THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

The project site is located between the Rio Hondo and the San Gabriel Rivers in the <strong>Whittier</strong><br />

Narrows Recreation Area. Legg Lake is located northeast of the proposed project. <strong>Whittier</strong><br />

Narrows is both bisected and ringed with roads that are inhospitable for recreational users on<br />

bicycle or on foot; and many amenities within the <strong>Whittier</strong> Narrows Recreation Area are difficult<br />

to get to without a car. Once visitors arrive by car at Legg Lake, it is equally difficult to connect<br />

to the trails and open space attractions on the perimeter.<br />

San Gabriel Blvd. and Durfee Ave. border the project area on the south and separate the active<br />

areas of <strong>Whittier</strong> Narrows from the natural area around Lario Creek and the Zone 1 ditch. The<br />

site is adjacent to <strong>Rosemead</strong> Blvd. a State Route that is heavily used, and forms a major barrier<br />

to access into Legg Lake from the Rio Hondo side.<br />

From the San Gabriel River Trail access to the intersection at Durfee Ave. and <strong>Rosemead</strong> Blvd.<br />

is via the Siphon Road spur; the bicycle path continues on to the northern portion of the Rio<br />

Hondo <strong>Bike</strong> <strong>Path</strong> diagonally across the intersection. While the western entry to Legg Lake is in<br />

sight from this busy intersection there is no safe route to travel on except the road shoulder and<br />

emergency lane of <strong>Rosemead</strong> Blvd.<br />

Fig. 7. The project is located in the southern portion of the Emerald Necklace, a recreation<br />

trail and park system on the San Gabriel and Rio Hondo Rivers.<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 4 of 8


THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

Jurisdiction<br />

The project site is located within Los Angeles County District 1 (Supervisor: Gloria Molina)<br />

within unincorporated Los Angeles County.<br />

Fig. 8. County Supervisor District Boundaries Map.<br />

Site Ownership & Easements<br />

The project boundaries encompass two parcels. The US Army Corps of Engineers (USACE)<br />

owns both parcels with Southern California Edison transmission line easements on each. The<br />

Legg Lake park area is operated under a long term lease to the Los Angeles County Department<br />

of Parks and Recreation (“Parcel A”).<br />

Los Angeles County Assessor Identification Numbers<br />

AIN<br />

Ownership<br />

8119004901 USA (easement) Southern California Edison Transmission Lines<br />

81190049<strong>05</strong> USA (easement) Southern California Edison Transmission Lines<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 5 of 8


THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

Fig. 9. Project Area Parcel Map<br />

Constraints<br />

• Obtaining permission from USACE<br />

• Obtaining permission from Caltrans<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 6 of 8


THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

Implementation Challenges<br />

• The proposed improvements are outside of the currently permitted water conservation<br />

pool or inundation area within the <strong>Whittier</strong> Narrows Flood Control Basin. However, the<br />

U.S. Army Corps of Engineers is working on a feasibility study to allow a significantly<br />

expanded water conservation pool inundation area that will include this area. The<br />

proposed improvements should be coordinated with this study.<br />

• Los Angeles County Flood Control District’s general guidelines for maintenance, rightof-way<br />

issues, operations and landscape will be included in design and implementation.<br />

Related Projects<br />

The <strong>Rosemead</strong> Class I Bicycle <strong>Path</strong> Project is one of a series of projects in the <strong>Whittier</strong> Narrows<br />

Recreation Area that will improve connectivity of in the southern portion of the Emerald Necklace,<br />

a recreation trail and park system on the San Gabriel and Rio Hondo Rivers. The purpose of the<br />

<strong>Whittier</strong> Narrows Projects is to provide direct trail access to the heart of the <strong>Whittier</strong> Narrows<br />

Recreation Area, Legg Lake. Bicyclists and recreational users of the San Gabriel River Trail, a<br />

Class I bicycle path, and the Rio Hondo <strong>Bike</strong> <strong>Path</strong> traveling to <strong>Whittier</strong> Narrows cannot connect to<br />

this popular park unless they travel in traffic at road grade along busy <strong>Rosemead</strong> Blvd. or Durfee<br />

Road.<br />

Fig. 10. <strong>Whittier</strong> Narrows Connectivity Phase I Projects Location Map.<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 7 of 8


THE EMERALD NECKLACE / Phase 1 Projects <strong>03</strong>/<strong>14</strong>/2013<br />

The following are part of the <strong>Whittier</strong> Narrows Connectivity Projects, which seek to connect the<br />

Emerald Necklace to the recreation facilities in the <strong>Whittier</strong> Narrows Recreation Area.<br />

• Class I Bicycle <strong>Path</strong> from the Rio Hondo to Legg Lake: Construct a new multi-use trail<br />

through the Southern California Edison Easement and a signalized crossing at <strong>Rosemead</strong><br />

Blvd. to link the Rio Hondo <strong>Bike</strong> <strong>Path</strong> directly to Legg Lake.<br />

• Class I Bicycle <strong>Path</strong> from El Bosque Del Rio Hondo to Lincoln Avenue on San Gabriel<br />

Blvd.: Construct a Class I <strong>Bike</strong> <strong>Path</strong> on San Gabriel Blvd. to connect the north and south<br />

sections of the Rio Hondo <strong>Bike</strong> <strong>Path</strong>.<br />

• Pellissier Village Multi-Use Trail from State Highway 60 to Horseman’s Park: Improve<br />

the multi-use trail on the eastside of the San Gabriel River with a stormwater BMP<br />

component at Pellissier Village for hikers and bicyclists. Improve access ramps to the<br />

Peck Road Bridge.<br />

• Pellissier Multi-Use Bridge at Horseman’s Park: Construct a new multi-use bridge over<br />

the San Gabriel River in the Pellissier Village area that connects the existing equestrian<br />

facilities to <strong>Whittier</strong> Narrows Recreation Area and provides a safe river crossing for all<br />

trail users.<br />

The following projects have been identified for future consideration.<br />

• Provide a bicycle route on Durfee Ave. that will connect to the southern Legg Lake<br />

parking lot, The San Gabriel River Discovery Center, and South El Monte High School.<br />

Fig. 11. Durfee Ave. looking north to the east side of Legg Lake and the proposed<br />

crosswalk connection to the Lario Creek trail.<br />

ROSEMEAD BLVD. CLASS I BICYCLE PATH / DRAFT 8 of 8